Lead-acid batteries have been used increasingly in recent years in solar power systems, especially in homes and small businesses, due to their cheapness and advanced development in manufacturing them. However, these batteries have low voltages and low capacities, to increase voltage and capacities, they need to be connected in series and parallel. Whether they are connected in series or parallel, their voltages and capacities must be equal otherwise the quality of service will be degraded. The fact that these different voltages are inherent in their manufacturing, but these unbalanced voltages can be controlled. Using a switched capacitor is a method that was used in many methods for balancing voltages, but their responses are slow. To increase the response and control of the balancing process, this research proposes a novel technique that consists of a dynamic capacitor for controlling the unbalanced voltages of series-connected lead-acid batteries. The proposed technique uses a main capacitor and an inductor with two switches their on/off states are controlled through a pulse width modulation. The technique is designed and validated using MATLAB/Simulink and the results for different cases are compared with other techniques such as switched capacitor technique. Results show that the proposed method promised the balancing control in a shorter time and better performance than other techniques which are crucial in the battery’s voltage balancing.
The present work deals with five species of parasitic Hymenoptera belonging to Pteromalidae, Eupelmidae and Eurytornidae which have been reared from brachid beetles. A new species, Eurytoma irakensis is described and the species, Bruchocida orientalis Crawford is recorded for the first time from Iraq.
In this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show MoreThe current research aims to identify the effect of the learning mastery strategy using interactive learning as a therapeutic method on the achievement of secondary school students in mathematics. To achieve the research objective, the researcher selected second-grade middle school students at Al-Haybah Intermediate School for Boys and determined his research sample, which consisted of (77) students distributed into two sections: Section (A) the experimental group, with (38) students, and Section (B) the control group, with (39) students. The statistical equivalence of the two research sample groups was confirmed in the variables (intelligence test, previous achievement, and previous knowledge test). The researchers chose the par
... Show MoreThe research aims to identify the extent to which Iraqi private banks practice profit management motivated by reducing the taxable base by increasing the provision for loan losses by relying on the LLP it model, which consists of a main independent variable (net profit before tax) and independent sub-variables (bank size, total debts to total equity, loans granted to total obligations) under the name of the variables governing the banking business. (Colmgrove-Smirnov) was used to test the normal distribution of data for all banks during the period 2017-2020, and then find the correlation between the main independent variable sub and the dependent variable by means of the correlation coefficient person, and then using the multiple
... Show MoreBuckling and free vibration analysis of laminated rectangular plates with uniform and non uniform distributed in-plane compressive loadings along two opposite edges is performed using the Ritz method. Classical laminated plate theory is adopted. The static component of the applied in- plane loading are assumed to vary according to uniform, parabolic or linear distributions. Initially, the plate membrane problem is solved using the Ritz method; subsequently, using Hamilton’s variational principle, linear homogeneous algebraic equations in terms of unknown are generated, the set of linear algebraic equations can be solved as an Eigen-value problem. Buckling loads for laminated plates with different combinations of bounda
... Show MoreObjectives To assess the feasibility and accuracy of a new prototype robotic implant system for the placement of zygomatic implants in edentulous maxillary models. Methods The study was carried out on eight plastic models. Cone beam computed tomographs were captured for each model to plan the positions of zygomatic implants. The hand-eye calibration technique was used to register the dynamic navigation system to the robotic spaces. A total of 16 zygomatic implants were placed, equally distributed between the anterior and the posterior parts of the zygoma. The placement of the implants (ZYGAN®, Southern Implants) was carried out using an active six-jointed robotic arm (UR3e, Universal Robots) guided by the dynamic navigation coordinate tran
... Show MoreRecently, complementary perfect corona domination in graphs was introduced. A dominating set S of a graph G is said to be a complementary perfect corona dominating set (CPCD – set) if each vertex in is either a pendent vertex or a support vertex and has a perfect matching. The minimum cardinality of a complementary perfect corona dominating set is called the complementary perfect corona domination number and is denoted by . In this paper, our parameter hasbeen discussed for power graphs of path and cycle.
Flow-production systems whose pieces are connected in a row may not have maintenance scheduling procedures fixed because problems occur at different times (electricity plants, cement plants, water desalination plants). Contemporary software and artificial intelligence (AI) technologies are used to fulfill the research objectives by developing a predictive maintenance program. The data of the fifth thermal unit of the power station for the electricity of Al Dora/Baghdad are used in this study. Three stages of research were conducted. First, missing data without temporal sequences were processed. The data were filled using time series hour after hour and the times were filled as system working hours, making the volume of the data relativel
... Show More