Identificatio n Of Key Factors Affecting Waste Management In Life Cycle Of The Construction Project By Using Delphi Technique
...Show More Authors

The problem of generated waste as a result of the implementation of construction projects, has  been aggravated recently because of construction activity experienced by the world, especially Iraq, which is going through a period of reconstruction, where construction waste represents (20-40%) of the total generated waste and has a negative effect on the environment and economic side of the project. In addition, the rate of consumpted  amounts of natural resources are estimated to be about 40% in the construction industry, so it became necessary to reduce waste and to be manage well. This study aims to identify the key factors affecting waste management through the various phases of the project, and this is accomplished by using the Delphi technique. After conducting three questionnaire rounds of the Delphi to a group of experts, the results of this study identified forty four key factors affecting waste management distributed on the phases of the project, where found that the factor of frequent errors in the designs has the highest effect on the design phase, and the factor of the use of construction techniques that do not generate waste has highest effect on the construction phase. The purpose is to provide data base for decision-makers to control waste management well to avoid all affecting factors, with the possibility of building waste management system based on factors effective for each phase.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Laboratory Investigation on Roller Compaction Technique in Concrete Construction
...Show More Authors

Roller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Tue Dec 22 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Cost Management of construction industries according to the fast-track method
...Show More Authors

Construction projects have become a changing dramatically in recent decades and that the goal of the beneficiaries of the implementation of structural project is to complete the work with less time and within the cost of the specific and the best possible quality may sometimes happen that highlights the importance of time on the rest of the items at the implementation of projects for various reasons, including the need to use the project as soon as possible possible change rapidly to customer's requests, but the high cost of the project represents the biggest obstacle for entrepreneurs with its effects on the quality and the time workers, and is a measure of those elements in monetary terms is the key to integration between them, so the

... Show More
View Publication Preview PDF
Publication Date
Mon Apr 01 2024
Journal Name
Chemical Engineering Research And Design
Treatment of petroleum refinery wastewater by a combination of anodic oxidation with photocatalyst process: Recent advances, affecting factors and future perspectives
...Show More Authors

View Publication
Scopus (7)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Thu Jun 20 2019
Journal Name
Baghdad Science Journal
The Impact of Agile Methodologies and Cost Management Success Factors: An Empirical Study
...Show More Authors

Software cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are used in the Pakistani software industry. To determine the results, the researchers applied quantitative approach through an extensive survey on

... Show More
View Publication Preview PDF
Crossref (4)
Clarivate Crossref
Publication Date
Sat Jul 22 2023
Journal Name
Journal Of Engineering
Use of Gis for Creating a Project Management Data Base in Baghdad Al-Rissfa
...Show More Authors

The main objective of resources management is to supply and support the site operation with necessary resources in a way to achieve the required timing in handing over the work as well as to achieve the cost-realism within the budget estimated. The research aims to know the advantage of using GIS in management of resources as one of the new tools that keep pace with the evolution in various countries around the world also collect the vast amount of spatial data resources in one environment easily to handled and accessed quickly and this help to make the right decision regarding management of resources in various construction projects. The process of using GIS in the management and identification of resources is of extreme importance in t

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Oct 06 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Image segmentation by using thresholding technique in two stages
...Show More Authors

View Publication
Scopus (2)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at cr

... Show More
View Publication
Crossref (6)
Crossref
Publication Date
Tue Jun 01 2010
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Auditing Board of supreme audit for solid waste management
...Show More Authors

Solid waste is considered to be one of the rescuers of pollution in case of     neglecting conditions and procedures relating to specific processes of laws, systems, and contracts requirements in addition to recommendations of organizations concerned with environment issue. The environments auditing groups of intosai have taking into account the environments control by various conference and recommended that the Board of supreme audit have and environments controlling taking into consideration auditing procedures on waste management ,and also offered on evidences for experiences of members of countries in order to exchange their knowledge's and experiments .the definition of solid waste and their resources ,risks ,man

... Show More
View Publication Preview PDF
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
The Possibility of Applying Quality Management System ISO9001: 2008 in Station Project Al Rustumiya - A Case Study
...Show More Authors

The research study of the possibility of the application of the quality management system under the international standard ISO ISO9001: 2008 in the station project Rustumiya wastewater treatment of the Department of SEWER BAGHDAD - Baghdad MOREALITY as the first step in the right direction towards the implementation of total quality management (TQM), and the research Find the gap between the international standard and the quality system used in the organization surveyed through the use of checklists to analyze the gap, the checklist have included (191) items distributed on five basic requirements, according to the appearance in the international standard, namely, (quality management system, management responsibility, resource man

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun May 02 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The effect of applying lean construction tools to improving the results of the earned value management model: Applied research in Al-Rasheed General Company for Construction Contracting
...Show More Authors

Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag

... Show More