Preferred Language
Articles
/
joe-1877
Empirical Study for Capturing and Allocating Significant Risk Factors in School Construction Projects in Iraq
...Show More Authors

In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due to changing designs and specifications during construction; inaccuracy in time and budget estimation; construction material price; financial and economic crisis/financial instability; selecting the contractor only based on the lowest bid, regardless of technical competence; instability within the political system of the government/instability of the government as a client; foreign exchange rates fluctuate against the Iraqi dinar. The study also showed that the respondents recommended allocating four risks to the owner, eight risk factors to the contractor, one risk to the consultant, and 32 factors allocated as shared. The study concluded that the results could help identify the most critical risks facing this type of project and the contracting party that can bear the risks and manage them efficiently.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Thu Apr 30 2020
Journal Name
Medico-legal Update 2020 Vol. 20 (1
Risk Factors for Congenital Anomalies in Neonatal Intensive Care Unit in Baghdad City
...Show More Authors

Scopus (1)
Scopus
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Time and finance optimization model for multiple construction projects using genetic algorithm
...Show More Authors
Abstract<p>Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w</p> ... Show More
View Publication
Scopus (2)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Theoretical And Applied Information Technology
Factors affecting global virtual teams’ performance in software projects
...Show More Authors

Scopus (23)
Scopus
Publication Date
Thu Nov 17 2022
Journal Name
Aip Conference Proceedings
Principles of using project management tools and techniques of mitigate components causing delays and disruption in public and private construction projects in Iraq
...Show More Authors

Delays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in

... Show More
Crossref
Publication Date
Sat Jul 01 2017
Journal Name
Journal Of Construction Engineering And Management
Identification, Quantification, and Classification of Potential Safety Risk for Sustainable Construction in the United States
...Show More Authors

View Publication
Scopus (54)
Crossref (50)
Scopus Clarivate Crossref
Publication Date
Thu Jun 20 2019
Journal Name
Baghdad Science Journal
The Impact of Agile Methodologies and Cost Management Success Factors: An Empirical Study
...Show More Authors

Software cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are used in the Pakistani software industry. To determine the results, the researchers applied quantitative approach through an extensive survey on

... Show More
View Publication Preview PDF
Crossref (4)
Clarivate Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Iraqi Journal Of Veterinary Sciences
Risk factors assessment and antimicrobial resistance of Salmonella isolates from apparently healthy and diarrheal dogs in Baghdad, Iraq
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Paving the Way for PPP's to Infrastructure Projects in Iraq
...Show More Authors

The political situation experienced by Iraq before the events of 2003 that led to the collapse of infrastructure. rebuilding costs were estimated after 2003 by187(million USD) according to the estimates of the basic needs as stated in Five-Year Plan 2010-2014. The difficult in financing projects and the continuous demands for maintenance and operating cost, and working by contemporary styles in different countries, the strategic option is to adopt the government entering the private sector as a partner in the development process. Since public _private partnership (PPP's) is at a germinating stage of development in Iraq, it has been studied the critical success factors(CSF's) in the experiences of countries that have implemented the style

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Apr 12 2024
Journal Name
Revista Latinoamericana De Hipertension
Most common risk factors distribution for cervical cancer
...Show More Authors

Scopus
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology &amp; Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
...Show More Authors

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
View Publication
Crossref (10)
Crossref