This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects.
The research aims to identify the factors that affect the quality of the product by using the Failure Mode and Effect Analysis (FMEA) tool and to suggest measures to reduce the deviations or defects in the production process. I used the case study approach to reach its goals, and the air filter product line was chosen in the air filters factory of Al-Zawraa General Company. The research sample was due to the emergence of many defects of different impact and the continuing demand for the product. I collected data and information from the factory records for two years (2018-2019) and used a scheme Pareto Fishbone Diagram as well as an FMEA tool to analyze data and generate results.
Par
... Show MoreThe research (Comic Scene Construction between Dramatic Situation and Acting Performance in Feature Film) has been divided into the following: the methodological framework which consists of the problem of the research: how to construct the comic scene between the dramatic situation and acting performance in the feature film. The research importance and aims are: identifying how to construct the comic scene between the dramatic situation and acting performance in the feature film. The limits of the research are also stated.
The research is divided into three sections: the first is the comic situation and the Aristotelian discourse in which the comic situation is clarified starting from the Aristotelian discourse. The second section: me
This paper focuses on Load distribution factors for horizontally curved composite concrete-steel girder bridges. The finite-element analysis software“SAP2000” is used to examine the key parameters that can influence the distribution factors for horizontally curved composite steel
girders. A parametric study is conducted to study the load distribution characteristics of such bridge system due to dead loading and AASHTO truck loading using finite elements method. The key parameters considered in this study are: span-to-radius of curvature ratio, span length, number of girders, girders spacing, number of lanes, and truck loading conditions. The results have shown that the curvature is the most critical factor which plays an important
The study aimed to survey mushroom species from fields among herbs, palm trunks, and trees in central Iraq and to identify them on the basis of morphological and molecular characteristics. As a molecular identification result with polymerase chain reaction six species were recorded (with eight isolates): Agaricus bitorquis (Quéllt) Saccardo. 1887 (SHA14); Candolleomyces candolleanus (Fr.) D. Wächter & Melzer, 2020 (SHA15); Cyclocybe cylindracea (D.C.) Vizzini & Angelini, 2014 (SHA13); Leucoagaricus hesperius Vellinga, 2010 (SHA16); Volvariella sp. (SHA17), and Volvopluteus gloiocephalus (D. C.) Vizzini, Contu & Justo, 2011 (SHA10, SHA101 and SHA12), belonging to four families of Basidiomycetes: Agaricaceae, Pluteaceae,
... Show MoreObjectives: The current study aims at identifying the level of perceived stress among nursing college students and determining the factors associated with stress they have. Methodology: A cross-sectional descriptive study initiated for the period on November 1st, 2014 to May 1st, 2015. The study has been conducted on the undergraduate nursing college students / University of Baghdad. The sample of the study was consisted of (128) students who were selected purposively. The questionnaire of the study was adopted and modified for the present study which consisted of socio-demographic data and the scale of
It is often needed to have circuits that can display the decimal representation of a binary number and specifically in this paper on a 7-segment display. In this paper a circuit that can display the decimal equivalent of an n-bit binary number is designed and it’s behavior is described using Verilog Hardware Descriptive Language (HDL).
This HDL program is then used to configure an FPGA to implement the designed circuit.
