This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects.
Study of determining the optimal future field development has been done in a sector of South Rumaila oil field/ main pay. The aspects of net present value (economic evaluation) as objective function have been adopted in the present study.
Many different future prediction cases have been studied to determine the optimal production future scenario. The first future scenario was without water injection and the second and third with 7500 surface bbls/day and 15000 surface bbls/day water injection per well, respectively. At the beginning, the runs have been made to 2028 years, the results showed that the optimal future scenario is continuing without water in
The main work of this paper is devoted to a new technique of constructing approximated solutions for linear delay differential equations using the basis functions power series functions with the aid of Weighted residual methods (collocations method, Galerkin’s method and least square method).
Traditionally, path selection within routing is formulated as a shortest path optimization problem. The objective function for optimization could be any one variety of parameters such as number of hops, delay, cost...etc. The problem of least cost delay constraint routing is studied in this paper since delay constraint is very common requirement of many multimedia applications and cost minimization captures the need to
distribute the network. So an iterative algorithm is proposed in this paper to solve this problem. It is appeared from the results of applying this algorithm that it gave the optimal path (optimal solution) from among multiple feasible paths (feasible solutions).
The execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind misman
... Show MoreIn this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.
Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.
Introduction
Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi
... Show MoreCloud computing provides huge amount of area for storage of the data, but with an increase of number of users and size of their data, cloud storage environment faces earnest problem such as saving storage space, managing this large data, security and privacy of data. To save space in cloud storage one of the important methods is data deduplication, it is one of the compression technique that allows only one copy of the data to be saved and eliminate the extra copies. To offer security and privacy of the sensitive data while supporting the deduplication, In this work attacks that exploit the hybrid cloud deduplication have been identified, allowing an attacker to gain access to the files of other users based on very small hash signatures of
... Show MoreThis research include building mathematical models for aggregating planning and shorting planning by using integer programming technique for planning master production scheduling in order to control on the operating production for manufacturing companies to achieve their objectives of increasing the efficiency of utilizing resources and reduce storage and improving customers service through deliver in the actual dates and reducing delays.
All major organs may be impacted by the connective disease systemic lupus erythematosus, a separate risk factor for coronary artery disease (CAD). Adhesion molecules like intercellular adhesion molecules (ICAM) and vascular cell adhesion molecules (VCAM) can detect endothelial damage and dysfunction, which appear to play a crucial role. This study investigated whether people with SLE had elevated subclinical and clinical atherosclerosis risk factors. Traditional CAD risk factors such as smoking, hypertension, and hyperlipidemia cannot entirely explain this elevation. It is thought that immunological dysfunction also increases CAD risk in SLE patients. The study aimed to assess early endothelial changes in SLE Iraqi female patients w
... Show MoreBackground: Prematurity and its complications are the major causes of neonatal and infant morbidity and mortality. Although the cause of preterm labor is often unknown, numerous etiological risk factors may be implicated. To identify the risk factors that lead to prematurity and assess the neonatal outcomes that preterm neonates may develop. Methods: This case-control study was conducted at AL-Elwiya Pediatric Teaching Hospital, Baghdad, Iraq, from the 1st of June to the 31st of December 2019. A non-randomized sample of 700 neonates admitted to the neonatal care unit was included in this study and divided into two groups of preterm full-term neonates as the experimental and control groups, respectively (n=350 each). The same questionnaire w
... Show More