This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects.
Variable-Length Subnet Masks (VLSM), often referred to as "subnetting a subnet", is used to maximize addressing efficiency. The network administrator is able to use a long mask on networks with few hosts, and a short mask on subnets with many hosts. This addressing scheme allows growth and does not involve wasting addresses. VLSM gives a way of subnetting a network with
minimal loses of IP addresses for a specific range. Unfortunately, the network administrator has to perform several mathematical steps (or use charts) to get the required results from VLSM. In this paper, a simple graph simulator is proposed (using Visual Basic 6.0 Language) to perform all the required mathematical steps and to display the obtained required informatio
Variable-Length Subnet Masks (VLSM), often referred to as "subnetting a subnet", is used to maximize addressing efficiency. The network administrator is able to use a long mask on networks with few hosts, and a short mask on subnets with many hosts. This addressing scheme allows growth and does not involve wasting addresses. VLSM gives a way of subnetting a network with minimal loses of IP addresses for a specific range. Unfortunately, the network administrator has to perform several mathematical steps (or use charts) to get the required results from VLSM. In this paper, a simple graph simulator is proposed (using Visual Basic 6.0 Language) to perform all the required mathematical steps and to display the obtained required information (the
... Show MoreIn developing countries, individual students and researchers are not able to afford the high price of the subscription to the international publishers, like JSTOR, ELSEVIER,…; therefore the governments and/or universities of those countries aim to purchase one global subscription to the international publishers to provide their educational resources at a cheaper price, or even freely, to all students and researchers of those institutions. For realizing this concept, we must build a system that sits between the publishers and the users (students or researchers) and act as a gatekeeper and a director of information: this system must register its users and must have an adequate security to e
... Show MoreStudy of determining the optimal future field development has been done in a sector of South Rumaila oil field/ main pay. The aspects of net present value (economic evaluation) as objective function have been adopted in the present study.
Many different future prediction cases have been studied to determine the optimal production future scenario. The first future scenario was without water injection and the second and third with 7500 surface bbls/day and 15000 surface bbls/day water injection per well, respectively. At the beginning, the runs have been made to 2028 years, the results showed that the optimal future scenario is continuing without water in
Traditionally, path selection within routing is formulated as a shortest path optimization problem. The objective function for optimization could be any one variety of parameters such as number of hops, delay, cost...etc. The problem of least cost delay constraint routing is studied in this paper since delay constraint is very common requirement of many multimedia applications and cost minimization captures the need to
distribute the network. So an iterative algorithm is proposed in this paper to solve this problem. It is appeared from the results of applying this algorithm that it gave the optimal path (optimal solution) from among multiple feasible paths (feasible solutions).
The aim of this paper is to study the nonlinear delay second order eigenvalue problems which consists of delay ordinary differential equations, in fact one of the expansion methods that is called the least square method which will be developed to solve this kind of problems.
The main work of this paper is devoted to a new technique of constructing approximated solutions for linear delay differential equations using the basis functions power series functions with the aid of Weighted residual methods (collocations method, Galerkin’s method and least square method).
Environmental pollution is regarded as a major problem, and traditional strategies such as chemical or physical remediation are not sufficient to overcome the problems of pollution. Petroleum-contaminated soil results in ecological problems, representing a danger to human health. Bioremediation has received remarkable attention, and it is a procedure that uses a biological agent to remove toxic waste from contaminated soil. This approach is easy to handle, inexpensive, and environmentally friendly; its results are highly satisfactory. Bioremediation is a biodegradation process in which the organic contaminants are completely mineralized to inorganic compounds, carbon dioxide, and water. This review discusses the bioremediation of petroleum-
... Show MoreThis research include building mathematical models for aggregating planning and shorting planning by using integer programming technique for planning master production scheduling in order to control on the operating production for manufacturing companies to achieve their objectives of increasing the efficiency of utilizing resources and reduce storage and improving customers service through deliver in the actual dates and reducing delays.
An Eigen-state expansion method is applied to the transition of the Auger de-excitation charge transfer (AD) process in the interaction between clean Cu,Al and Na surfaces and excited incident gases H and He .We use this method to describe the effective surfaces electronic structure. It's shown that the AD efficiency is deeply influenced by the presence of the energy band for the surfaces and the potential energy stored within the excited incident atom, thus for long interaction time we use a slowly atom's about 1KeV to scatter from metals surfaces where the electron couldn't probe the metal band structure and Za the surface - projectile distance. Also we drive a new formula for AD interaction Matrix element