This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the research study of the integration of parametric costs in a predictive model for future study. Changes in the parametric costs of construction projects substantially impact their time, cost, and quality and are a major barrier to their execution, necessitating research, analysis, and the development of the most effective solutions. The study aims to identify the parametric cost accurately through iterative tests and continuous improvements by presenting literature describing the history and characteristics of the parametric cost methodologies and identifying each methodology's limitations, strengths, and weaknesses to promote a better understanding of their best practices and use for managing project cost
Estimating multivariate location and scatter with both affine equivariance and positive break down has always been difficult. Awell-known estimator which satisfies both properties is the Minimum volume Ellipsoid Estimator (MVE) Computing the exact (MVE) is often not feasible, so one usually resorts to an approximate Algorithm. In the regression setup, algorithm for positive-break down estimators like Least Median of squares typically recomputed the intercept at each step, to improve the result. This approach is called intercept adjustment. In this paper we show that a similar technique, called location adjustment, Can be applied to the (MVE). For this purpose we use the Minimum Volume Ball (MVB). In order
... Show MoreThis study examines the impact of different curing methods on the compressive strength of concrete. It investigates techniques such as air curing, periodic water spraying, full water submersion, and polyethylene encasement. Artificial neural network models were employed to evaluate the compressive strength under each curing condition. A model for calculating compressive strength that considers surrounding conditions was created using an artificial neural network. The current study’s figures were generated using this model. The research thoroughly examined the impact of curing environments and concrete mix components on strength properties, taking into account factors such as tempera
Researches in the field of evaluation of industrial products emotionally are internationally new and non-existing in the Arabic speaking countries, which is considered the crux of the problem in the current research, in addition to the need of the designers and design students to know how to measure the emotional responses for the industrial product in order to get benefit from them in their designs. The research objective is to get a tool that uses emojis in measuring the emotional responses for the products. The researcher designed an emotional verbal wheel and emojis wheel. The sample of the research consisted of (7) chairs different in design and use, and the respondents were (89) students. The most important results are:
1- Desi
The UV−VIS absorption spectroscopy technique was used to study the formation of a new complex of charge transfer (CT) between bioactive organic molecules as (Nystatin) containing both a π-electrons from a conjugated system and lone-pair of electrons (amine) with Tetrachloro-1,4 benzoquinone (TCBQ) as a π-acceptor in which the transferred electron goes into its vacant anti-bonding molecular orbitals. The Tyrian purple-colored complex formed was quantitatively measured at 544 nm. This complex shows obeying Beer's law within the concentration range of (10-90) μg.ml-1The stoichiometry of the formed complex between the (Nys.) and (TCBQ) was found 1:2 as evaluated by continuous variation (Job's method) and mole ratio method The value of mola
... Show MoreThe novel Vierordt’s approach, or simultaneous equation method, was created and validated for the concurrent determination of vincristine sulfate (VCS) and bovine serum albumin (BSA) in pure solutions utilizing UV spectrophotometry. It is simple, precise, economical, rapid, reliable, and accurate. This method depends on measuring absorbance at two wavelengths, 296 nm and 278 nm, which correspond to the λmax of VCS and BSA in deionized water, respectively. The calibration curves of VCS and BSA are linear at concentration ranges of 10–60 μg/mL and 200–1600 μg/mL, with correlation coefficient values (R2) of 1 and 0.999, respectively. The limits of detection (LOD) and quantification (LO
... Show MoreEducation quality evaluation is one of the objectives of education quality. The evaluation includes assessing the education standards and academic program outcomes to develop intellectual, scientific and practical concepts for the educational structure. It considers the determination of the rates of the number of accepted students and graduates. The research focuses on "what are the levels of education quality according to the evaluation mechanisms in the design department" to enhance the quality system and the objectives of theoretical and applied education.
It is identifying the levels of education quality and evaluating it according to the numbers and rates of graduate students of the design department branches for morning and ev
Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show MoreThis research aims to identify the productive relationship nature among the elements used in the agricultural companies by estimating the translog cost function. It also aims to recognize the possibility of substituting these elements with each other, to identify the nature of revenues, and economies scale through elasticity of other cost. This research goes further to define the typical use of resources, identify the performance of the companies and their contribution in controlling their cost, and estimating elasticity of substitution (Allen-Uzawa), (Morishima). The translog cost function was estimated so as the total cost of the agricultural companies is a function of the prices of production and production quantity output el
... Show MoreMaterial Requirements Planning System (MRP) is considered as one of the planning and controlling of production and inventory systems which is used to prepare plan of the final production requirements and its parts of subcomponents raw materials and the time at which it was needed for the purpose of preparing orders of production and purchase.
The problem of the present work is represented in the general company of electrical industrialization adoption of traditional methods and personal experience of the process of the products and\or purchase quantity and inventory quantities and limiting the required time for acquiring the required quantities of the materials and parts used in the finish product of the
... Show More