Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on the project objectives, as well as the tools and methodologies that project managers and decision-makers could use to handle the risks to reduce the negative effects of risks on the success of the construction projects. This study concludes that risk response should be considered an essential activity to complete the RMP, which will lead to minimizing the losses due to risks, maximizing the benefits due to opportunities, and achieving the objectives of projects.

 

Scopus Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Mar 01 2016
Journal Name
Journal Of Engineering
A reformation Study about the Construction Management in the Primary Stage Curricula’s for the Civil Engineering in Some of the Iraqi Universities
...Show More Authors

There is no doubt that the field of education and teaching (in any country and whatever its ruling system varies “d”) is considered one of the most specific and sensitive field, because it is related to the building of human. And as the human is a purpose (aim) and the means in the same time and he is the strategist capital, so he way of his rearing, education, choosing the educator, methods of working and the aims are considered serious matters.

     The educational process has aim determined by the society for him self through its working establishments in this field and these are the official and public establishments. And as he feels that the establishments have failed to achieve its d

... Show More
View Publication Preview PDF
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Engineering
Development of a Blueprint Impact System of the risks on construction projects Implementation
...Show More Authors

In Production and Operations Management the specialists  have  tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization.

     The research aims to develop a blu

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Mon Jun 30 2025
Journal Name
Acta Logistica
A business continuity-based framework for risk management in smart supply chains: a fuzzy multi-criteria decision-making approach
...Show More Authors

The aim of this study is to develop a novel framework for managing risks in smart supply chains by enhancing business continuity and resilience against potential disruptions. This research addresses the growing uncertainty in supply chain environments, driven by both natural phenomena-such as pandemics and earthquakes—and human-induced events, including wars, political upheavals, and societal transformations. Recognizing that traditional risk management approaches are insufficient in such dynamic contexts, the study proposes an adaptive framework that integrates proactive and remedial measures for effective risk mitigation. A fuzzy risk matrix is employed to assess and analyze uncertainties, facilitating the identification of disr

... Show More
View Publication Preview PDF
Scopus (1)
Scopus Clarivate Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
The Time-Cost Trade-off to Manage A Project in a Fuzzy Environment
...Show More Authors

In this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Dec 01 2017
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The Role of Benford’s law to appreciation the risk in financial transactions: Application study in Baghdad University
...Show More Authors

The financial fraud considers part of large concept to management and financial corruption, the financial fraud is appeared especially after corporate, that is Emerge agency theory, that is because recognize relationship between the management company and stakeholder, that is through group from constriction in order to block the management to fraud practice, that on the basis was choose another party in order fraud this practice and give opinion on financial statement, that consider basis decision making from stakeholder to basis the report auditor about creditability this is statement that reflect real activity for the company.The Auditor in order to lead work him Full professionalism to must using group from control Techniques, that is

... Show More
View Publication
Crossref
Publication Date
Tue Sep 27 2022
Journal Name
Al–bahith Al–a'alami
POLITICAL DEBATES AND THEIR ARTISTIC CONSTRUCTION IN IRAQI SATELLITE CHANNELS ( AN ANALYTICAL STUDY ) : (A research drawn from a Master Thesis)
...Show More Authors

The problem of research on the study of political debate programs in the Iraqi satellite channels, in the "People decide" program by Afaq channel and " electoral competition " by Fallujah channel), and its importance for the community and researchers in the scientific field, as new programs to enter the Iraqi media after we have been the world media a lot in this area at the academic and practical levels (The field), and seeks to find out what the technical construction of the programs of political debates in Iraqi satellite channels and methods of construction and methods of employment used by the technical elements in the presentation of the programs and The study adopted the surve

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Medical Journal Of Babylon
Platelet-rich Fibrin Potential Role in Periodontal Regeneration: A Review Study
...Show More Authors

Periodontitis is a persistent bacterial-causing disease which damages the supporting periodontium of the teeth. The complexity of supporting tissue structure makes the regeneration a challenge for periodontists. Early investigations were focused on discovering therapeutic substitutes that are biocompatible, simple to prepare and economic. This might cause a local release of growth factors that accelerate the healing process of the soft and hard tissue. Recently, platelet-rich fibrin (PRF) has received a wide attention as a biocompatible regenerative material in both dental and medical fields. PRF is a natural fibrin-derived biomaterial, and it is easy to obtain. It can be gotten from individual blood without the use of any external anticoag

... Show More
Publication Date
Mon Feb 01 2021
Journal Name
Meta Gene
Association analysis of FTO gene polymorphisms rs9939609 and obesity risk among the adults: A systematic review and meta-analysis
...Show More Authors

View Publication
Scopus (18)
Scopus
Publication Date
Mon Feb 08 2021
Journal Name
Public Works Management & Policy
Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study
...Show More Authors

This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is