Preferred Language
Articles
/
joe-1713
Influence of Design Efficiency of Water Supply Network Inside Building on its Optimum Usage: Review
...Show More Authors

The water supply network inside the building is of high importance due to direct contact with the user that must be optimally designed to meet the water needs of users.  This work aims to review previous research and scientific theories that deal with the design of water networks inside buildings, from calculating the amount of consumption and the optimal distribution of the network, as well as ways to rationalize the use of water by the consumer.  The process of pumping domestic water starts from water treatment plants to be fed to the public distribution networks, then reaching a distribution network inside the building till it is  provided to the user.  The design of the water supply network inside the building is mainly affected by the amount of water consumed in the building. On this basis, the pipes' dimensions and the water tank's volume are determined. The operating pressure of the water supply network inside the building is calculated to overcome the height difference and the friction inside the pipes and provide sufficient pressure to operate the most remote fixture.  The most important results of the research are that the optimal use of the water distribution network inside the buildings is achieved by the correct design and implementation using skilled labor, materials, and devices of high quality and rationalization of water consumption by the user.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Jun 23 2019
Journal Name
American Rock Mechanics Association
Using an Analytical Model to Predict Collapse Volume During Drilling: A Case Study from Southern Iraq
...Show More Authors

Zubair Formation is one of the richest petroleum systems in Southern Iraq. This formation is composed mainly of sandstones interbedded with shale sequences, with minor streaks of limestone and siltstone. Borehole collapse is one of the most critical challenges that continuously appear in drilling and production operations. Problems associated with borehole collapse, such as tight hole while tripping, stuck pipe and logging tools, hole enlargement, poor log quality, and poor primary cement jobs, are the cause of the majority of the nonproductive time (NPT) in the Zubair reservoir developments. Several studies released models predicting the onset of borehole collapse and the amount of enlargement of the wellbore cross-section. However, assump

... Show More
View Publication
Publication Date
Sun Aug 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
مقترح اسلوب IRWs الحصين لتقدير أنموذج الانحدار المقسم لحركة حمولة قاع نهر دجلة ونقطة التغيير لكمية تصريف المياه عند مدينة بغداد
...Show More Authors

              يتكون الانحدار المقسم من عدة أقسام تفصل بينها نقاط انتماء مختلفة، فتظهر حالة عدم التجانس الناشئة من عملية فصل الأقسام ضمن عينة البحث. ويهتم هذا البحث في تقدير موقع نقطة التغيير بين الأقسام وتقدير معلمات الأنموذج، واقتراح طريقة تقدير حصينة ومقارنتها مع بعض الطرائق المستعملة في الانحدار الخطي المقسم. وقد تم استعمال أحد الطرائق التقليدية (طريقة Muggeo) لإيجاد مقدرات الإمكان الأعظم بالأسلوب الت

... Show More
View Publication Preview PDF
Crossref