Building Information Modeling (BIM) is becoming a great known established collaboration process in Architecture, Engineering, and Construction (AEC) industry. In various cases in many countries, potential benefits and competitive advantages have been reported. However, despite the potentials and benefits of BIM technologies, it is not applied in the construction sector in Iraq just like many other countries of the world. The purpose of this research is to understand the uses and benefits of BIM for construction projects in Iraq. This purpose has been done by establishing a framework to application of BIM and identifying the benefits of this technology that would convince stakeholders for adopting BIM in the construction sector in Iraq. Through this research, the use of this technology has been clarified by using the proposed framework (application Revit software and linking it with the MS Project and Navisworks Manage software on the case study) to identify the important benefits to be the beginning to apply the Building Information Modeling technology in the construction sector in Iraq. The research results indicated that such proposed framework can greatly improve the performance of the current state of project management through improving the project quality, cost saving and time-saving.
|
Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and
... Show MoreThe regular job of a reservoir engineer is to put a development plan to increase hydrocarbon production as possible and within economic and technical considerations. The development strategy for the giant reservoir is a complex and challenging task through the decision-making analysis process. Due to the limited surface water treatment facility, the reservoir management team focuses on minimizing water cut as low as possible by check the flow of formation and injected water movement through the Mishrif reservoir. In this research, a representative sector was used to make the review of water injection configuration, which is considered an efficient tool to make study in a particular area of the entire field when compared with the ful
... Show MoreKnowing the distribution of the mechanical rock properties and the far field stresses for the field of interest is an important task for many applications concerning reservoir geomechanics, including wellbore instability analysis, hydraulic fracturing, sand production, reservoir compaction, and subsidence. A major challenge with determining the rock's mechanical properties is that they cannot be directly measured at the borehole. Furthermore, the recovered carbonate core samples for performing measurements are limited and they provide discrete data for specific depths.
The purpose of this study is to build 2D and 3D geomechanical models of the Khasib reservoir in the East Baghdad oil field/ Central area. TECHLOG.2015.3 softwa
... Show MoreIn this research, that been focused on the most important economic benefits expected when applying the three standards of sustainability in construction projects (economic, environmental and social). Fuzzy AHP, a multi-decision decision-making technique for evaluating construction projects. Which when used we get the speed and accuracy in the results. Using this technique will reduce uncertainties decisions significantly (fuzzy environment), that found in most projects .The results of the data analysis showed that the economic standards take the greatest relative importance (60%) among the three sustainability standards. Therefore, the implementation of any standards need a cost so the economic benefit of any proje
... Show MoreThe oil sector in Iraq suffered from several difficulties led to the decline and reduction of oil production and the deterioration of refineries and transport pipeline status in addition to the weakness of the technology side and the prevalence of financial and administrative corruption besides the high costs of rehabilitation of the oil sector and also administrative and institutional problems still ongoing.
In spite of Iraq's possession of vast oil wealth allows him to play an important role in the international energy market، he is still under the level. The production of oil doesn'<
... Show MoreSafety programmes are considered one of the means to protect workers from different accidents and injuries and also to protect all assets including machines equipment and various materials. In spite of world state interests in occupational safety, this subject didn't get the required attention by senior staff of management at most of our country construction factories and the application of safety programmes still limited and in active. In order to a achieve the goal of the study, scientific method has been pursued to obtain the necessary information related to this study through tours to related companies and their construction factories and review literature that deal with occupational safety subject and their programmes and cost, in a
... Show MoreThe construction sector is considered an important and influential pivot in the national economy of any country. Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during
... Show More