The government of Iraq states that despite the massive amounts invested in the power generating sector, the country has been plagued by power outages for more than three decades; One of the most common sources of the problem and significant impact on the waste of public funds in contractual processes. The Ministry of Planning issued the sectorial
specialized standard bidding documents (SSBD) of Design, Supply, and Installation of the Electromechanical Works (DSIoEW), which is primarily designed to support the Ministry of Electricity (MoE) by developing economic projects to improve the contractual process that led to raisings Iraqi electricity generation field. The research evaluates the impact of
applying the SSBD-DSIoEW for governmental power generation plants and investigates the challenges and obstacles of SSBD-DSIoEW applications in Iraq by conducting preliminary interviews with procurement experts and distributing 120 questionnaires to MoE's contractual staff. The results show a lack of experience in applying the evaluation and qualification criteria under SSBD-DSIoEW, and inadequate bid evaluations, resulting in an ineffective procurement system. In the study's conclusion and based on the results, the authors developed a unified bids evaluation model. They structured it in a computerized application program to support bids' evaluation committees
Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show MoreEffective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul
Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem
... Show MoreBackground: Plants used in folk medicine for
the treatment of peptic ulcer diseases is a very
promising approach to overcome the limitations of
classical medicines.
Aim: To explore the efficacy of medicinal
plants, namely turmeric, garlic and marshmallow,
in eradication of H. pylori.
Methods: This prospective study was carried out
on 225 of well-known dyspeptic patients who were
divided into four groups; a control group (received
classical medical therapy) and three other groups
that received one of the three medicinal plants,
plus the same therapy used in the control group.
The follow up was done by using a questionnaire
form, endoscopic examination, and determination
of serum levels of anti
In Production and Operations Management the specialists have tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization.
The research aims to develop a blu
... Show MoreThe quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA
After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were ra
... Show MoreThe reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of qual
... Show More