Cost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the relation between these factors using Analytic Hierarchy Process (AHP) method. Final conclusions and recommendations were extracted for better elemental estimation accuracy in project management.
Abstract
The study aims to identify the common fears of preschool children and their relationship to the approaches to parental treatment in South Al Batinah Governorate from their mother’s point of view. Total of (466) mothers were selected as the study sample. The researcher used the scale of common fear and the scale of parental treatment approaches. The results of the study have shown that the most common fear among the study sample was (the fear of darkness) in the first level with a rate of 75.03%, and in the second level came the item (my child is afraid to sleep alone) by 72.74%, in the third level came to the item (fear of seeing insects) with a rate of 67.59%, and the last one was (the fear of rain) w
... Show MoreThe reliability of hybrid systems is important in modern technology, specifically in engineering and industrial fields; it is an indicator of the machine's efficiency and ability to operate without interruption for an extended period of time. It also allows for the evaluation of machines and equipment for planning and future development. This study looked at reliability of hybrid (parallel series) systems with asymmetric components using exponential and Pareto distributions. Several simulation experiments were performed to estimate the reliability function of these systems using the Maximum Likelihood method and the Standard Bayes method with a quadratic loss (QL) function and two priors: non-informative (Jeffery) and inform
... Show MoreAbstract
In this study, we compare between the autoregressive approximations (Yule-Walker equations, Least Squares , Least Squares ( forward- backword ) and Burg’s (Geometric and Harmonic ) methods, to determine the optimal approximation to the time series generated from the first - order moving Average non-invertible process, and fractionally - integrated noise process, with several values for d (d=0.15,0.25,0.35,0.45) for different sample sizes (small,median,large)for two processes . We depend on figure of merit function which proposed by author Shibata in 1980, to determine the theoretical optimal order according to min
... Show MoreResveratrol is polyphenolic compound has many biochemical and biological effects on several organs. Therefore, resveratrol can be used to treat many diseases. The aim was to evaluate resveratrol safety when used in a parenteral single bolus dose. This study was conducted on 60 mice (30 males and 30 females). Each male and female mice divided into 6 groups (five mice per group). All mice groups given 1% DMSO and five different doses of resveratrol (5, 2.5, 1.25, 0.625, 0.312) gm/kg intraperitonially given to five groups respectively. The mice were continuously monitored during 14 days. The number of deaths, changes in general behavior, changes in physiological activity, and signs of toxicity were reported. On day 15 blood was
... Show MoreBuckling analysis of a laminated composite thin plate with different boundary conditions subjected to in-plane uniform load are studied depending on classical laminated plate theory; analytically using (Rayleigh-Ritz method). Equation of motion of the plates was derived using the principle of virtual work and solved using modified Fourier displacement function that satisfies general edge conditions. The eigenvalue problem generated by using Ritz method, the set of linear algebraic equations can be solved using MATLAB for symmetric and anti-symmetric, cross and angle-ply laminated plate considering some design parameters such as aspect ratios, number of layers, lamination type and orthotropic ratio. The results obtained g
... Show MoreBackground: This study aimed to determine the cephalometric values of tetragon analysis on a sample of Iraqi adults with normal occlusion. Material and methods: Forty digital true lateral cephalometric radiographs belong to 20 males and 20 females having normal dental relation were analyzed using AutoCAD program 2009. Descriptive statistics and sample comparison with Fastlicht norms were obtained. Results: The results showed that maxillary and mandibular incisors were more proclined and the maxillary/mandibular planes angle was lower in Iraqi sample than Caucasian sample. Conclusion: It's recommended to use result from this study when using tetragon analysis for Iraqis to get more accurate result.
The litholog of Nahr Umr Formation was evaluated using the Acoustic Impedance (AI), Vp/Vs ratio cross plot colored by petrophysical properties (Vsh, PHIT, PHIE, and Sw) in Am-6-Am-10 wells. Bulk density is an important physical property that reflects matrix density and fluid density that exist in rocks pores. It is used as the main parameters to estimate physical characteristics (porosity, water saturation, shale volume, and others). AI was calculated using RHOB and VP logs. Shear velocity was calculated using Greenberg Castagna equations used for estimating the Vp/Vs ratio and the result Showed that the Nahr Umr Formation is composed of two main lithological units. The upper unit (depth 3540m -3672m) is composed of limestone (li
... Show MoreIn this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show MoreInfrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was
... Show MorePurpose: The main objective of this paper is, to determine the optimal no. of technicians’ men in a workshop crew of an Industrial System. Theoretical framework: The purpose of applying these tools is to explore their ability to reduce costs and improvements that can be obtained in the process of providing services to the end customer. Design/methodology/approach: The literature structure review was built from analyzing 12 of scientific papers and books, from web sciences and the Elsevier database. The papers were analyzed from descriptive, methodologic, and citation characteristics. Finding: By applying the equation model of the paper, the optimal no. of technician men in the crew of the workshop can be determined when
... Show More