Cost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the relation between these factors using Analytic Hierarchy Process (AHP) method. Final conclusions and recommendations were extracted for better elemental estimation accuracy in project management.
Channel estimation (CE) is essential for wireless links but becomes progressively onerous as Fifth Generation (5G) Multi-Input Multi-Output (MIMO) systems and extensive fading expand the search space and increase latency. This study redefines CE support as the process of learning to deduce channel type and signal-tonoise ratio (SNR) directly from per-tone Orthogonal Frequency-Division Multiplexing (OFDM) observations,with blind channel state information (CSI). We trained a dual deep model that combined Convolutional Neural Networks (CNNs) with Bidirectional Recurrent Neural Networks (BRNNs). We used a lookup table (LUT) label for channel type (class indices instead of per-tap values) and ordinal supervision for SNR (0–20 dB,5-dB steps). T
... Show MoreThe adsorption of Cr (VI) from aqueous solution by spent tea leaves (STL) was studied at different initial Cr (VI) concentrations, adsorbent dose, pH and contact time under batch isotherm experiments The adsorption experiments were carried out at 30°C and the effects of the four parameters on chromium uptake to establish a mathematical model description percentage removal of Cr (VI). The
analysis results showed that the experimental data were adequately fitted to second order polynomial model with correlation coefficients for this model was (R2 = 0.9891). The optimum operating parameters of initial Cr (VI) concentrations, adsorbent dose, pH and contact time were 50 mg/l, 0.7625 g, 3 and 100 min, respectively. At these conditions, th
That less duration takes larva mature into a virgin under field conditions is one day during Alguetrh from April to October and last longer to more than a day during Alguetrh from November to February and up to nine days in January when low minimum temperature to zero degreespercentage that these larvae can not be a high percentage in the field ranging from 90-100% reduced Hessian Alnsphaly 85% during the months of July and Cape
Applying the constructability concept in the construction industry has proven many benefits in different projects; however, this concept still lacks usage in Iraq. Therefore, it is important to encourage usage of the constructability concept in the construction industry in Iraq. The main purpose of this study is to investigate the factors that affect constructability in Iraq and then classify them according to their importance. A total of 37 factors were collected from an intensive literature review, and they were classified under the sub and main categories. A survey was undertaken in two sessions with open questionnaire and close questionnaire. The results were analysed and the mean
Abstract
The basic orientation of the research is an attempting to apply the cost determining method according in the contract sector projects for Al- Iraq ceneral company, that this subject has a big value according to its modernity and its influence on the future and the eaning of the company.
The research aims to find out the effect of the method for determining cost based on the activity in determining the cost of the construction sector projects.The research was conducted in Iraq General Company for the implementation of irrigation projects. Bani search on three assumptions, the first is (that the application of the method for determining the cost on the basis of
... Show MoreThe study was conducted at the fields of the Department of Horticulture and Landscape Gardening, College of Agriculture Engineering Sciences, University of Baghdad. During the spring 2017. All the recommended practices were followed during experimentation. The experimental material consisted four Genotype it is Batraa, Btera, Mosulle, and local selection. The experiment was applied in Randomized Complete Block Design (RCBD). The objectives of Study were to estimate the some genetic parameters and path coefficient for some traits Okra, The results of statistical analysis for these genotypes were highly significant differences for all traits except the traits number of leaves, the numbe
Sewer network is one of the important utilities in modern cities which discharge the sewage from all facilities. The increase of population numbers consequently leads to the increase in water consumption; hence waste water generation. Sewer networks work is very expensive and need to be designed accurately. Thus construction effective sewer network system with minimum cost is very necessary to handle waste water generation.
In this study trunk mains networks design was applied which connect the pump stations together by underground pipes for too long distances. They usually have large diameters with varying depths which consequently need excavations and gathering from pump stations and transport the sewage
... Show MoreRecently, the development and application of the hydrological models based on Geographical Information System (GIS) has increased around the world. One of the most important applications of GIS is mapping the Curve Number (CN) of a catchment. In this research, three softwares, such as an ArcView GIS 9.3 with ArcInfo, Arc Hydro Tool and Geospatial Hydrologic Modeling Extension (Hec-GeoHMS) model for ArcView GIS 9.3, were used to calculate CN of (19210 ha) Salt Creek watershed (SC) which is located in Osage County, Oklahoma, USA. Multi layers were combined and examined using the Environmental Systems Research Institute (ESRI) ArcMap 2009. These layers are soil layer (Soil Survey Geographic SSURGO), 30 m x 30 m resolution of Digital Elevati
... Show More