Cost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering. Elemental estimation, which in the early stage, estimates the construction costs depending on . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the relation between these factors using Analytic Hierarchy Process (AHP) method. Final conclusions and recommendations were extracted for better elemental estimation accuracy in project management.
The aim of this study is to utilize the behavior of a mathematical model consisting of three-species with Lotka Volterra functional response with incorporating of fear and hunting cooperation factors with both juvenile and adult predators. The existence of equilibrium points of the system was discussed the conditions with variables. The behavior of model referred by local stability in nearness of any an equilibrium point and the conditions for the method of approximating the solution has been studied locally. We define a suitable Lyapunov function that covers every element of the nonlinear system and illustrate that it works. The effect of the death factor was observed in some periods, leading to non-stability. To confirm the theore
... Show MoreThyroid disease is a common disease affecting millions worldwide. Early diagnosis and treatment of thyroid disease can help prevent more serious complications and improve long-term health outcomes. However, thyroid disease diagnosis can be challenging due to its variable symptoms and limited diagnostic tests. By processing enormous amounts of data and seeing trends that may not be immediately evident to human doctors, Machine Learning (ML) algorithms may be capable of increasing the accuracy with which thyroid disease is diagnosed. This study seeks to discover the most recent ML-based and data-driven developments and strategies for diagnosing thyroid disease while considering the challenges associated with imbalanced data in thyroid dise
... Show MoreAbstract
The current research sought to demonstrate the effect of material flow cost accounting on reducing products through the application of material flow cost accounting technique, which works on the optimal utilization of materials and energy and the reduction of environmental impacts.The research aims to clarify the knowledge foundations for material flow cost accounting, in addition to studying the material flow cost accounting technique that helps reduce the cost of products and make them environmentally friendly. To achieve this, the research relied on the descriptive approach with regard to the theoretical aspect of the resea
... Show More
Abstract
The term public budget defects became nowadays a chronic, economical phenomenon, almost all the countries weather advanced or development country suffered from it, despite the different visions to economic schools of a thought to accept or reject the deficit in public budget but the prevailed opinion that is needed to rule the role of the state by reducing the public spending which led to continuous deficits in public budget and the consequent upon increase in government borrowing, increase taxes on income and wealth, thus weakening the in contrive for private investment which contributed to the increase of in flationary stagnation, it became a duty to state covered by the lack of financial sources
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
The cost management of cost indicators in housing projects, on the level of planning and design, is the most important quality indicators, for adoption of strategies of planning and design efficient in managing these indicators. So this research points out the need to highlight the most effective and influential cost indicators in housing projects, and to determine strategies in the management of these indicators in order to raise the efficiency of housing projects quality, to seemly the income level target group, taking into consideration the quality of housing standards, to achieve the basic requirements of housing. This paper highlights the importance of the cost management, the types of housing cost, the method
... Show MoreSemi-parametric regression models have been studied in a variety of applications and scientific fields due to their high flexibility in dealing with data that has problems, as they are characterized by the ease of interpretation of the parameter part while retaining the flexibility of the non-parametric part. The response variable or explanatory variables can have outliers, and the OLS approach have the sensitivity to outliers. To address this issue, robust (resistance) methods were used, which are less sensitive in the presence of outlier values in the data. This study aims to estimate the partial regression model using the robust estimation method with the wavel
... Show MoreThere many methods for estimation of permeability. In this Paper, permeability has been estimated by two methods. The conventional and modified methods are used to calculate flow zone indicator (FZI). The hydraulic flow unit (HU) was identified by FZI technique. This technique is effective in predicting the permeability in un-cored intervals/wells. HU is related with FZI and rock quality index (RQI). All available cores from 7 wells (Su -4, Su -5, Su -7, Su -8, Su -9, Su -12, and Su -14) were used to be database for HU classification. The plot of probability cumulative of FZI is used. The plot of core-derived probability FZI for both modified and conventional method which indicates 4 Hu (A, B, C and D) for Nahr Umr forma
... Show MoreIn this paper, the method of estimating the variation of Zenith Path Delay (ZPD) estimation method will be illustrate and evaluate using Real Time Kinematic Differential Global Positioning System (RTK-DGPS). The GPS provides a relative method to remotely sense atmospheric water vapor in any weather condition. The GPS signal delay in the atmosphere can be expressed as ZPD. In order to evaluate the results, four points had been chosen in the university of Baghdad campus to be rover ones, with a fixed Base point. For each rover position a 155 day of coordinates measurements was collected to overcome the results. Many models and mathematic calculations were used to extract the ZPD using the Matlab environment. The result shows that the ZPD valu
... Show MoreAbstract
This study highlights the importance of Iraq in the analysis of foreign trade and economic growth for the period (1980 - 2013) is an attempt to determine the equilibrium relationship long term and short term between these two variables were used ARDL model to explain the economic relationship between the two variables.
To achieve the objectives of the research has been the standard model estimate after testing the stability of exports X data series, and imports M, and GDP current prices, and exchange rate EXR, and verify the existence of a joint integration relationship between these variables.
In order to achieve the objectives of the research it
... Show More