Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was (26.24%), and (5.5%), and AA was (74%), and (94.5%), for cost and time model, respectively. The researcher concluded that the ANN model has a strong correlation and high accuracy, indicating that these models are characterized by high efficiency and good performance in predicting cost and time.
The research aims to identify the importance of using the style of the cost on the basis of activity -oriented in time TDABC and its role in determining the cost of products more equitably and thus its impact on the policy of allocation of resources through the reverse of the changes that occur on an ongoing basis in the specification of the products and thus the change in the nature and type of operations . The research was conducted at the General Company for Textile Industries Wasit / knitting socks factory was based on research into the hypothesis main of that ( possible to calculate the cost of activities that cause the production through the time it takes to run these activities can then be re- distributed product cost
... Show MoreThe goal of this study is to build an application that can be used in difficult cases and sudden circumstances during the pandemic and post-disaster state, which can be the development of digital risk management and mitigating the difficult impact of the epidemic through the improvement of IT and IoT that can be fine by finding initial solutions and make the world like a digital city that could be managed by the network. We provide this study to gain an overview of reasons for delayed and exceeded costs in a select of thirty Iraqi case projects by controlling the time and cost. The drivers of delay have been investigated in multiple countries/contexts. however, there is little country data available under the conditions that have ch
... Show MoreThe contemporary business environment is witnessing increasing calls for modifications to the traditional cost system, and a trend towards adopting cost management techniques to provide appropriate financial and non-financial information for senior and executive departments, including the Resource Consumption Accounting (RCA) technique in question, which classifies costs into fixed and variable to support the decision-making process. Moreover, (RCA) combines two approaches to cost estimation, the first based on activity-based cost accounting (ABC) and the second on the German cost accounting method (GPK). The research aims to provide a conceptual vision for resource consumption accounting, after Considering it as an accounting te
... Show MoreRation power plants, to generate power, have become common worldwide. One such one is the steam power plant. In such plants, various moving parts of heavy machines generate a lot of noise. Operators are subjected to high levels of noise. High noise level exposure leads to psychological as well physiological problems; different kinds of ill effects. It results in deteriorated work efficiency, although the exact nature of work performance is still unknown. To predict work efficiency deterioration, neuro-fuzzy tools are being used in research. It has been established that a neuro-fuzzy computing system helps in identification and analysis of fuzzy models. The last decade has seen substantial growth in development of various neuro-fuzzy systems
... Show MoreA high percentage of existing buildings in Iraq are traditional buildings, yet there is approximately no such green building in Baghdad or other governorates. Most of these buildings require urgent upgrading to increase their performance (operationally, economically, and environmentally), also the building owners looking for identifying and implementing many of the green building measures to reduce the operational and maintenance costs of their buildings. The decision-makers need to support the possibility of achieving sustainable measures of existing building rating systems such as LEED or BREEAM, and that would require an optimization model. The goal of this study is to maximize the
The area around the Suez Canal has been chosen particularly Sinai to implement the new Suez Canal project parallel to the original 72-km-long channel due to the importance of the commercial site of the Arab Republic of Egypt, competing with shipping lanes, to accommodate the increasing maritime traffic passing through the Suez canal, and to provide special services for trade world and reduce the economic cost of marine trip. The establishment of six tunnels for automobile and railway transport to Sinai The cost of the establishment of this new channel and the establishment of the tunnels about (2.8) billion, of which 4 billion cost of the new channel. Project implementation period is one year. The new proj
... Show MoreRecently, there has been a major trend towards environmental issues and concern for the green product because traditional products cause serious environmental impacts such as reduced resources, global warming, energy consumption, emissions and other environmental damage. Under these developments, economic units are looking for cost-effective technologies that reduce the cost of a green product that has four main dimensions: reducing energy, reducing resource consumption, preventing pollution, and using renewable energy while not compromising quality and satisfying customers in order to enhance competitive advantage.
This research will address one of the most important cost-effective green technologies, Gr
... Show MoreThe cost of pile foundations is part of the super structure cost, and it became necessary to reduce this cost by studying the pile types then decision-making in the selection of the optimal pile type in terms of cost and time of production and quality .So The main objective of this study is to solve the time–cost–quality trade-off (TCQT) problem by finding an optimal pile type with the target of "minimizing" cost and time while "maximizing" quality. There are many types In the world of piles but in this paper, the researcher proposed five pile types, one of them is not a traditional, and developed a model for the problem and then employed particle swarm optimization (PSO) algorithm, as one of evolutionary algorithms with t
... Show Moreبهذا البحث نقارن معاييرالمعلومات التقليدية (AIC , SIC, HQ , FPE ) مع معيارمعلومات الانحراف المحور (MDIC) المستعملة لتحديد رتبة انموذج الانحدارالذاتي (AR) للعملية التي تولد البيانات,باستعمال المحاكاة وذلك بتوليد بيانات من عدة نماذج للأنحدارالذاتي,عندما خضوع حد الخطأ للتوزيع الطبيعي بقيم مختلفة لمعلماته
... Show MoreThe aim of this research is to recognize the tasks undertaken by the headmasters of intermediate schools concerning time- administration, in accordance to the viewpoints of the headmasters of intermediate schools in the Administration of Education of Al-Karkh the Third. The sample of this research consists of (60) headmasters and &n
... Show More