Factors Affecting Labor Productivity on Construction in Kurdistan of Iraq: Web Survey
...Show More Authors

This study was set out to investigate factors affecting labor productivity on construction in the north of Iraq (Kurdistan) and to rank all the factors based on engineers, contractors, and designer’s opinions. 76 factors were analyzed based on previous literature and a pilot study. Next, by using online Google Form, a questionnaire form was created and sent to people who have experience in the construction industry. Afterward, the questionnaire form was sent to targeted people by email and social media apps. Factors were divided into nine groups “Management, Technical and Technology, Human and Workforce, Leadership, Motivation, Safety, Time, Material and Equipment, and External”. However, 202 respondents participated in this study, and they were asked to give weight to the factors using the Likert scale from 1 to 5. Finally, the Relative Importance Index RII was used to determine the factors statically with MS Excel 2015. In brief, all the respondents agreed upon “Economic condition in the country” is the first ranking factor. While “Site complication” was the last factor that affect labor productivity in construction. Last but not least, the “Motivation” group was the first ranked group. Apart from the factors, respondents agreed that Site Engineers have more effect on construction projects than Contractors and Designers.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Transient Stability Enhancement and Critical Clearing Time Improvement for Kurdistan Region Network using Fact Configuration
...Show More Authors

The Electrical power system has become vast and more complex, so it is subjected to sudden changes in load levels. Stability is an important concept which determines the stable operation of the power system. Transient stability analysis has become one of the significant studies in the power system to ensure the system stability to withstand a considerable disturbance. The effect of temporary occurrence can lead to malfunction of electronic control equipment. The application of flexible AC transmission systems (FACTS) devices in the transmission system have introduced several changes in the power system. These changes have a significant impact on the power system protection, due to differences inline impedance, line curre

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Tue Jan 01 2019
Journal Name
Cpwr
Development of a workforce sustainability model for construction
...Show More Authors

Publication Date
Tue Jan 01 2019
Journal Name
Advances In Informatics And Computing In Civil And Construction Engineering: Proceedings Of The 35th Cib W78 2018 Conference: It In Design, Construction, And Management
Technology alternatives for workplace safety risk mitigation in construction: Exploratory study
...Show More Authors

Publication Date
Sat Aug 01 2020
Journal Name
Practice Periodical On Structural Design And Construction
Case Study to Evaluate Work-Zone Safety Technologies in Highway Construction
...Show More Authors

View Publication
Scopus (17)
Crossref (17)
Scopus Clarivate Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying The Decision-Making State and Impact in Iraqi Construction Projects
...Show More Authors

View Publication
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying the decision-making state and impact in Iraqi construction projects
...Show More Authors

View Publication
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Fri Dec 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
“The impact of the critical factors for the transfer of knowledge on opportunities and strategic success”
...Show More Authors

The current research discusses “The impact of the critical factors for the transfer of knowledge on opportunities and strategic success ", the attention have been increased on knowledge transfer and strategic success subjects because on being one of the important and contemporary issues, which have a significant impact on the existence of organizations and its future. The research aims to identify the critical factors for knowledge transfer in private high education environment which enables (the college community surveyed) to achieve strategic success, also the research sought to answer questions related to research problem by testing a number of major and minor hypothes in impact, in order to test the hypotheses I used a fiel

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Tue Mar 01 2016
Journal Name
Al-academy
Employing the elements of film construction in embodying the style cinematically: عامر الحديثي
...Show More Authors

The researcher concluded that it consists of several types of structures, where the intellectual structure related to the choice of the idea, its treatment, its effect, the choice of the topic, the way ideas are addressed and presented in the film, and then the dramatic structure of the film's characters, the formulation of its events, its dramatic composition, its temporal arrangement, the identification of the parties to the conflict and their management, then these are formulated. Visions and ideas through the visual and audio signal systems, which work to highlight the stylistic features in the character of the film director.

View Publication Preview PDF
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
...Show More Authors
Abstract<p>Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo</p> ... Show More
Scopus (9)
Crossref (9)
Scopus Clarivate Crossref
Publication Date
Mon Oct 31 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
The adoption of green management in Iraqi construction industry: The challenges and benefits
...Show More Authors

View Publication
Scopus Crossref