This study was set out to investigate factors affecting labor productivity on construction in the north of Iraq (Kurdistan) and to rank all the factors based on engineers, contractors, and designer’s opinions. 76 factors were analyzed based on previous literature and a pilot study. Next, by using online Google Form, a questionnaire form was created and sent to people who have experience in the construction industry. Afterward, the questionnaire form was sent to targeted people by email and social media apps. Factors were divided into nine groups “Management, Technical and Technology, Human and Workforce, Leadership, Motivation, Safety, Time, Material and Equipment, and External”. However, 202 respondents participated in this study, and they were asked to give weight to the factors using the Likert scale from 1 to 5. Finally, the Relative Importance Index RII was used to determine the factors statically with MS Excel 2015. In brief, all the respondents agreed upon “Economic condition in the country” is the first ranking factor. While “Site complication” was the last factor that affect labor productivity in construction. Last but not least, the “Motivation” group was the first ranked group. Apart from the factors, respondents agreed that Site Engineers have more effect on construction projects than Contractors and Designers.
In this research, the effect of changing the flood level of Al-Shuwaija marsh was studied using the geographic information systems, specifically the QGIS program, and the STRM digital elevation model with a spatial analysis accuracy of 28 meters, was used to study the marsh. The hydraulic factors that characterize the marsh and affecting on the flooding such as the ranks of the water channels feeding the marsh and the degree of slope and flat areas in it are studied. The area of immersion water, the mean depth, and the accumulated water volume are calculated for each immersion level, thereby, this study finds the safe immersion level for this marsh was determined.
By driven the moment estimator of ARMA (1, 1) and by using the simulation some important notice are founded, From the more notice conclusions that the relation between the sign and moment estimator for ARMA (1, 1) model that is: when the sign is positive means the root gives invertible model and when the sign is negative means the root gives invertible model. An alternative method has been suggested for ARMA (0, 1) model can be suitable when
In this paper the definition of fuzzy normed space is recalled and its basic properties. Then the definition of fuzzy compact operator from fuzzy normed space into another fuzzy normed space is introduced after that the proof of an operator is fuzzy compact if and only if the image of any fuzzy bounded sequence contains a convergent subsequence is given. At this point the basic properties of the vector space FC(V,U)of all fuzzy compact linear operators are investigated such as when U is complete and the sequence ( ) of fuzzy compact operators converges to an operator T then T must be fuzzy compact. Furthermore we see that when T is a fuzzy compact operator and S is a fuzzy bounded operator then the composition TS and ST are fuzzy compact
... Show MoreIn this work, we study several features of the non-zero divisor graphs (ℵZD- graph) for the ring Zn of integer modulo n. For instance, the clique number, radius, girth, domination number, and the local clustering coefficient are determined. Furthermore, we present an algorithm that calculates the clique number and draws the non-zero divisor for the ring Zn.
Orthogonal polynomials and their moments serve as pivotal elements across various fields. Discrete Krawtchouk polynomials (DKraPs) are considered a versatile family of orthogonal polynomials and are widely used in different fields such as probability theory, signal processing, digital communications, and image processing. Various recurrence algorithms have been proposed so far to address the challenge of numerical instability for large values of orders and signal sizes. The computation of DKraP coefficients was typically computed using sequential algorithms, which are computationally extensive for large order values and polynomial sizes. To this end, this paper introduces a computationally efficient solution that utilizes the parall
... Show More