Wastewater projects are one of the most important infrastructure projects, which require developing strategic plans to manage these projects. Most of the wastewater projects in Iraq don’t have a maintenance plan. This research aims to prepare the maintenance management plan (MMP) for wastewater projects. The objective of the research is to predict the cost and time of maintenance projects by building a model using ANN. The research sample included (15) completed projects in Wasit Governorate, where the researcher was able to obtain the data of these projects through the historical information of the Wasit Sewage Directorate. In this research artificial neural networks (ANN) technique was used to build two models (cost and time) for the maintenance of wastewater projects. The output shows there is a high correlation (R) between real and expected cost with 95.4%, minimized testing error (8.5%), and training error (19%). The mean absolute present error (MAPE) and Average Accuracy Percentage (AA) are (13.9% and 86.1%) respectively. Also, the results showed a strong correlation (R) between actual and predicted time (99.1%), minimized testing error (8%), and an additional MAPE% and AA% with (11.7% and 88.3%) respectively. These models are in agreement with the real values, as well as gives good prediction for future maintenance projects.
The research draws its importance from identifying the methods of profit management in misleading the financial statements, which in turn is reflected in the decisions of the authorities that relied on these reports, and then the models that help in detecting those methods used by the auditors. Risks. The index (margin of excess cash) was used to detect profit management practices on a group of banks listed in the Iraqi market for securities and the number of (23) banks, including (12) commercial bank and (11) Islamic bank and the results were compared to commercial banks with Islamic banks.((The research started from the hypothesis that the use of the (excess cash margin) model in the banking sector reveals the management
... Show MorePurpose – The main purpose of this research is to highlight the main role of strategic leadership skills for top managements in accessing to effective management in accordance with the (VUCA Prime) methodology in (VUCA) environment as Miniature virtual environment, which refers to (Volatility), (Uncertainty), (Complexity), and (Ambiguity).
methodology – To achieve the research objective, this study selected the quantitative approach in research design, Questionnaire was used as the main instrument for data collection, the sample comprised the opinion poll (106) individual who functions as a head department. (Structural equation modelling by (Smart Pls3)
... Show MoreThe goal of the research is to identify the effectiveness of using a proposed strategy according to the Fraunhofer model of knowledge management in mathematics achievement for second-grade female students in middle and high schools affiliated with the General Directorate of Education in Baghdad / Al-Karkh II. The objective was to prove the following null hypothesis: "The average scores of the experimental group who will study with the proposed strategy according to the Fraunhofer model and the scores of the control group students who will study in the usual way in the mathematics achievement test are not statistically significant different at the significance level (0.05)." The General Directorate of Education of Baghdad / Al-Karkh
... Show MoreAl-Rustamiya sewage treatment plant (WWTP) serves the east side of Baghdad city (Rusafa) and is considered one of the largest projects.It consists of three parts (old project F0, first extension F1, and second extension F2) that treat wastewater and the
effluent is discharged into Diyala river and thus into the Tigris River. These plants are designed and constructed with an aim to manage wastewater to reachIraqi effluent standard for BOD5, COD, TSS and chloride concentrations of 40, 100, 60 and 600
mg/L respectively. The data recordedfrom March till December 2011 provided from Al-RustamiyaWWTP, were considered in this study to evaluate the performance of the plant. The results indicated that the strength of the wastewater enterin
This investigation was carried out to study the treatment and recycling of wastewater in the Battery industry for an effluent containing lead ion. The reuse of such effluent can only be made possible by appropriate treatment method such as electro coagulation.
The electrochemical process, which uses a cell comprised aluminum electrode as anode and stainless steel electrode as cathode was applied to simulated wastewater containing lead ion in concentration 30 – 120 mg/l, at different operational conditions such as current density 0.4-1.2 mA/cm2, pH 6 -10 , and time 10 - 180 minute.
The results showed that the best operating conditions for complete lead removal (100%) at maximum concentration 120 mg/l was found to be 1.2 mA/cm2 cur
Several industrial wastewater streams may contain heavy metal ions, which must be effectively removal
before the discharge or reuse of treated waters could take place. In this paper, the removal of copper( II)
by foam flotation from dilute aqueous solutions was investigated at laboratory scale. The effects of
various parameters such as pH, collector and frother concentrations, initial copper concentration, air flow
rate, hole diameter of the gas distributor, and NaCl addition were tested in a bubble column of 6 cm inside
diameter and 120 cm height. Sodium dodecylsulfate (SDS) and Hexadecyl trimethyl ammonium bromide
(HTAB) were used as anionic and cationic surfactant, respectively. Ethanol was used as frothers and the
The ability of pulverized walnut-shell to remove oil from aqueous solutions has been studied. It involves two-phase process which consists of using walnut-shell as a filtering bed for the accumulation and adsorption of oil onto its surface. Up to 96% oil removal from synthetic wastewater samples was achieved while tests results showed that 75% of oil can be removed from the actual wastewater discharged from Al- Duara refinery in the south of Baghdad.
Electrochemical decolorization of direct black textile dye was studied in the presence of sodiumhydroxide (NaCl). Electrochemical cell occupy about 1 liter of working electrolyte supplied with graphiteelectrodes for both anode and cathode was constructed for this purpose. Decolorization percent, treatment time, power consumption, and pH were studied as a function of the applied voltage and salt concentration. Results show that decolorization increase with increasing salt concentration and applied voltage. Best decolorization of 86% can be achieved after 17 min at 7 volt and 5 g/l salt concentration. Further decolorization can be achieved but this will be accompanied with a sharp increase in power consumption. No significant decrease
... Show MoreAdsorption is one of the most important technologies for the treatment of polluted water from dyes. Theaim of this study is to use a low-cost adsorbent for this purpose. A novel and economical adsorbent was used to remove methyl violet dye (MV) from aqueous solutions. This adsorbent was prepared from bean peel, which is an agricultural waste. Batch adsorption experiments were conducted to study the ability of the bean peel adsorbent (BPA) to remove the methyl violet (MV) dye. The effects of different variables, such as weight of the adsorbent, pH of the MV solution, initial concentration of MV, contact time and temperature, on the adsorption behaviour were studied. It was found experimentally that the time required to achieve equilibrium
... Show MoreThe contamination of soil with the wastes of oil industry products that are complex mixtures of hydrocarbons increased recently due to the large development of oil industries in Iraq. This study deals with the remediation of low permeability contaminated clayey soil by using the enhanced electrokinetic technique (EK). The contaminated soil samples obtained from Thi-Qar oil refinery plant in Al-Nassyriah city, where the byproducts of refinery plant are disposed into that site. The byproduct contaminant treated as total petroleum hydrocarbons (TPH) to avoid dealing and complexity of treating the individual minerals and compounds consisting the contaminant. The initial concentrations of TPH were (702.7, 1168, 1235) ppm in the contaminated s
... Show More