A fixed firefighting system is a key component of fire safeguarding and reducing fire danger. It is installed as a permanent component in a structure to protect the entire or a portion of the building and its contents. The study aims to review the previous studies that deal with the evaluation of fire safety measures and their use in resolving problems associated with fire threats in buildings. For this reason, a number of previous studies in this field were reviewed compared with the NFPA code. The findings revealed that regulatory developments over the last several decades had created an atmosphere conducive to innovation. This has resulted in a growth in the number of fixed firefighting system types now obtainable. These solutions provide substantial distinction in terms of performance and hence safety. Not only is the availability of different fire risk alleviation systems important, but so is the election of the most convenient solution for the job. This is typically seen inside regulatory procedures and basics of thumb or heuristics and depends on the knowledge and expertise of divergent specialists. When several perceived danger and results thresholds are surpassed, fixed firefighting systems are frequently included as extra fire protection and resilience measures
The current study introduces a novel technique to handle electrochemical localized corrosion in certain limited regions rather than applying comprehensive cathodic protection (CP) treatment. An impressed current cathodic protection cell (ICCPC) was fabricated and firmly installed on the middle of a steel structure surface to deter localized corrosion in fixed or mobile steel structures. The designed ICCPC comprises three essential parts: an anode, a cathode, and an artificial electrolyte. The latter was developed to mimic the function of the natural electrolyte in CP. A proportional-integrated-derivative (PID) controller was designed to stabilize this potential below the ICCPC at a cathodic potential of −850 mV, which is crucial for prote
... Show MoreBasically, media studies focused on the important role of the blogs in boosting the democratic process in the Arab States. Blogs also worked on creating an alternative media for the public that maintained freedom of expression. However, media studies ignored the status of the blogs in the social and cultural fields.
The current study tries to tackle the socio-cultural dimensions of the blogs by means of showing how the blogs construct the self. The researcher is going to conduct interviews with the bloggers. He will also carry out a semiotic analysis that may reveal the strategies used by the bloggers. Besides, he tries to identify the realistic and traditional frames in which the social relationships are buil
This study aims to preparation a standards code for sustainability requirements to contribute in a better understanding to the concept of sustainability assessment systems in the dimensions of Iraqi projects in general and in the high-rise building. Iraq is one of the developing countries that faced significant challenges in sustainability aspects environmental, economic and social, it became necessary to develop an effective sustainability building assessment system in respect of the local context in Iraq. This study presented a proposal for a system of assessing the sustainability requirements of Iraqi high rise buildings (ISHTAR), which has been developed through several integrated
University campuses in Iraq are substantial energy consumers, with consumption increasing significantly during periods of high temperatures, underscoring the necessity to enhance their energy performance. Energy simulation tools offer valuable insights into evaluating and improving the energy efficiency of buildings. This study focuses on simulating passive architectural design for three selected buildings at Al-Khwarizmi College of Engineering (AKCOE) to examine the effectiveness of their cooling systems. DesignBuilder software was employed, and climatic data for a year in Baghdad was collected to assess the influence of passive architectural strategies on the thermal performance of the targeted buildings. The simulations revealed that the
... Show MoreBuildings begin to deteriorate gradually over time due to several factors, including environmental influences, improper use of the building, and neglected repairs for damages during the building's life span. Effective maintenance practices can minimize operational costs, extend the life of building systems and components, improve energy efficiency, and maintain property value. This paper aims to review articles related to building maintenance to identify factors affecting maintenance practices. After conducting the review, the result was that there were 33 factors affecting building maintenance categorized into six groups: management-related factors, manpower-related factors, technical-related factors, financial-
... Show MoreThis systematic review aimed to investigate the relation between orthodontic treatment (OT) and the incidence of the gingival black triangle (GBT) after completing treatment with a fixed orthodontic appliance, as well as the associated risk factors and the level of alveolar bone. Electronic and hand searches were conducted in three electronic databases for relevant articles published up to March 2022. Retrieved articles went through a two-step screening procedure, and the risk of bias (RoB) was assessed by the Joanna Briggs Institute checklists. The incidence of GBT after OT was set as the primary outcome, while the secondary outcomes were the risk factors associated with GBT and alveolar bone loss following OT. Out of 421 papers, 5
... Show MoreOne of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building pro
... Show More