Preferred Language
Articles
/
joe-1580
Using Water Quality Index to Assess Drinking Water For AL-Muthana Project
...Show More Authors

The water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not been met due to defects in design and operation and the inlet and outlet values of dissolved minerals were very close due to the absence of soluble salt removal units in AL-Muthana project

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Aug 31 2020
Journal Name
Journal Of Research In Medical And Dental Science
The Effect of Super Oxidized Water Mouthwash on the Level of IL 1? in Gingival Crevicular Fluid for Patients with Gingivitis Randomized Clinical Trial
...Show More Authors

Background: One of the most predominant periodontal diseases is the plaque induced gingivitis. For the past 20 years, super-oxidized solutions have be..

View Publication Preview PDF
Publication Date
Thu Jun 01 2023
Journal Name
Microporous And Mesoporous Materials
Green synthesis of porous carbon cross-linked Y zeolite nanocrystals material and its performance for adsorptive removal of a methyl violet dye from water
...Show More Authors

The cost-effective carbon cross-linked Y zeolite nanocrystals composite (NYC) was prepared using an eco-friendly substrate prepared from bio-waste and organic adhesive at intermediate conditions. The green synthesis method dependent in this study assures using chemically harmless compounds to ensure homogeneous distribution of zeolite over porous carbon. The greenly prepared cross-linked composite was extensively characterized using Fourier transform infrared, nitrogen adsorption/desorption, Field emission scanning electron microscope, Dispersive analysis by X-ray, Thermogravimetric analysis, and X-ray diffraction. NYC had a surface area of 176.44 m2/g, and a pore volume of 0.0573 cm3/g. NYC had a multi-function nature, sustained at a long-

... Show More
View Publication
Crossref (41)
Crossref
Publication Date
Wed Apr 01 2020
Journal Name
Groundwater For Sustainable Development
Hydrochemistry of shallow groundwater and its assessment for drinking and irrigation purposes in Tarmiah district, Baghdad governorate, Iraq
...Show More Authors

View Publication
Scopus (60)
Crossref (41)
Scopus Clarivate Crossref
Publication Date
Thu Aug 31 2023
Journal Name
Journal Of Legal Sciences
The Terrorist Project in Terms of the Agreement
...Show More Authors

Terrorist crime is considered a serious act that outweighs all other crimes in terms of impact and result, because it has a wide range on societies, and it also contains a great thing of danger represented in its purpose, and here describing terrorism as a crime is a description that does not give the full right to this behavior or that it It abbreviates it and does not show its actual reality, given that terrorism contains several different crimes and the roles of its contributors, and these roles are necessary to reach the result or the end. In which each episode is complementary to the other, it is not a single act, but rather several joint and complex actions that in turn all lead to the result, and the agreement in the terrorist pro

... Show More
View Publication Preview PDF
Publication Date
Wed Jun 01 2022
Journal Name
Bulletin Of Electrical Engineering And Informatics
Global virtual teams management system: project manager guide
...Show More Authors

Global virtual teams (GVTs) are a recent organizational adaptation created to meet the needs of globalizatized marketplace. GVTs are essentially teams that are distributed across national boundaries and concerned through advanced information and communication technology (ICT) such as email, instant messaging, and video conferencing. The research on GVTs is important in the information system (IS) field because GVTs are dependent on information communication technology and the use of other technologies; GVTs also consists of people from different cultures. This paper tried to answer two research questions. The first one is: what are the GVTs problems facing the project manager (PM). A literature review was conducted to answer the fir

... Show More
View Publication
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Mon Apr 05 2021
Journal Name
Solid State Technology
Genetic Algorithms in Construction Project Management: A Review
...Show More Authors

Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem

... Show More
View Publication Preview PDF
Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Mon Aug 01 2022
Journal Name
Journal Of Engineering
Evaluation of Elaj Irrigation Project in Babil Governorate
...Show More Authors

Climate change causes water shortage (water scarcity) in addition to the dams built by neighboring countries, which caused a lack of Iraq's water share. Therefore, evaluating the irrigation system requires considering its suitability, adequacy, and efficiency. Irrigation is considered adequate when it maintains water availability within the root zone, and if the amount to be added is determined, irrigation efficiency becomes possible by avoiding water loss. Babil Governorate is considered one of the agricultural governorates in the country that depends on its irrigation from Shatt Al-Hilla. The study area is the Elaj project. Three fields were selected for the project (B1, B2, and B3). These fields are lo

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu Mar 01 2018
Journal Name
Journal Of Engineering
Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co

... Show More
View Publication Preview PDF
Crossref (4)
Crossref