The water quality index is the most common mathematical way of monitoring water characteristics due to the reasons for the water parameters to identify the type of water and the validity of its use, whether for drinking, agricultural, or industrial purposes. The water arithmetic indicator method was used to evaluate the drinking water of the Al-Muthana project, where the design capacity was (40000) m3/day, and it consists of traditional units used to treat raw water. Based on the water parameters (Turb, TDS, TH, SO4, NO2, NO3, Cl, Mg, and Ca), the evaluation results were that the quality of drinking water is within the second category of the requirements of the WHO (86.658%) and the first category of the standard has not been met due to defects in design and operation and the inlet and outlet values of dissolved minerals were very close due to the absence of soluble salt removal units in AL-Muthana project
Type 2 diabetes mellitus which abbreviate as T2DM is a complex endocrine and metabolic disorder arisingfrom genetic and environmental factors interaction which in turn induce various degrees of insulin functionalalteration on peripheral tissues. Globally, T2DM has develop into a public health problem. Therefore, Thestudy included (75) patients(37 female and 38 males) suffering from T2DM who visit al-kadhimiya teachinghospital with age range 20-80 years and (70) as healthy controls with age range 20-70 years. All studiedgroups were evaluated CMV IgG by ELISA,B. urea, S. Creatinine, cholesterol and triglyceride the resultsshowed that B.urea, S.creatinine and serum cholesterol showed a non-significant differences between studiedgroup,
... Show MoreThe melting duration in the photovoltaic/phase-change material (PV/PCM) system is a crucial parameter for thermal energy management such that its improvement can realize better energy management in respect to thermal storage capabilities, thermal conditions, and the lifespan of PV modules. An innovative and efficient technique for improving the melting duration is the inclusion of an exterior metal foam layer in the PV/PCM system. For detailed investigations of utilizing different metal foam configurations in terms of their convective heat transfer coefficients, the present paper proposes a newly developed mathematical model for the PV/PCM–metal foam assembly that can readily be implemented with a wide range of operating condition
... Show MoreThe newly synthesized Schiff base ligand (E)-2-((2-phenylhydrazono)methyl)naphthalen-1-ol (phenyl hydrazine derivative), is allowed to react with each of the next mineral ion: Ni2+, Cu2+, Zn2+andCd2+successfully resulting to obtain new metal complexes with different geometric shape. The formation of Schiff base complexes and also the origin Schiff base is indicated using LC-Mass that manifest the obtained molar mass, FT-IR proved the occurrence of coordination through N of azobenzene and O of OH by observing the shifting in azomethines band and appearing of M-N and N-O bands. Moreover, we can also detect by such apparatus, the presence of aquatic water molecule inside the coordination sphere. UV-Vis spectra of all resultants reveale
... Show MoreComposite steel-concrete sections have a broad benefit through increasing structural strength as well as minimizing the self-loads. All past researches were concerned with pre-installed shear connectors (PRSC) in the manufacturing of composite sections. A new fabrication technique for steel-concrete-steel composite sections were presented in the current study by the post-installation shear connectors (POSC) passed-through an embedded polymerizing vinyl chloride (PVC) pipes. The performance of normal strength concrete prisms with a specified strength of 32 MPa connected to square steel tubes (SST) was investigated. Six specimens were fabricated in both methodologies, PRSC and POSC were experimentally tested by Push-out test. The spac
... Show MoreObjective: The aim of this study was to compare the marginal microleakage between bulk-fill, preheated bulk-fill, and bulk-fill flowable composite resins above and below cemento-enamel junction (CEJ) using micro-computed tomography. Methods: Sixty freshly extracted premolar teeth were prepared with a slot shaped cavities of a total of 120 Class II: 3mm (bucco-lingual), 2mm (mesio-distal) with mesial-gingival margin located 1mm coronal to CEJ, and distal gingival margin located 1mm apical to the CEJ. The samples were randomly divided into two main groups according to the restorative material (Tetric EvoCeram and 3M Filtek), and each group was further sub-divided into three subgroups according to the consistency (bulk fill, preheated bulk fil
... Show More