Evaluation of Elaj Irrigation Project in Babil Governorate
...Show More Authors

Climate change causes water shortage (water scarcity) in addition to the dams built by neighboring countries, which caused a lack of Iraq's water share. Therefore, evaluating the irrigation system requires considering its suitability, adequacy, and efficiency. Irrigation is considered adequate when it maintains water availability within the root zone, and if the amount to be added is determined, irrigation efficiency becomes possible by avoiding water loss. Babil Governorate is considered one of the agricultural governorates in the country that depends on its irrigation from Shatt Al-Hilla. The study area is the Elaj project. Three fields were selected for the project (B1, B2, and B3). These fields are located at the project's beginning, middle and end. The evaluation was based on the field measurements of water contents before and after watering during the growing season. Also, the root zone of each plant during the growing season is measured to give more accurate calculations. Accordingly, application efficiency, conveyance efficiency, distribution efficiency, storage efficiency, water productivity efficiency, and water use efficiency were calculated in the project. The application efficiency for the selected fields ranged between (33 to 39) % in B1, (32 to 38) % in B2, and (32 to 39) % in B3. The application efficiency in all fields increased by about 6% during the third watering period between (22/3/2021 to 4/4/2021) due to the low water level in Shatt Al-Hilla during maintenance work that lasted more than a month. The efficiency of the scheme [ηs%] in the project is 32.3%. This value is low and reflects the reality of irrigation in the Babil. Therefore, improvements must be made to the irrigation system.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jun 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Employment cost management tools in the fast-track method Of the constructionindustries for the purpose of rationalizing costs: An applied research in the Shatt al-Diwaniya transference project General Authority for projects of irrigation and reclamation
...Show More Authors

The important factor in the success of construction projects is its ability to objective estimate of the cost of the project and adapt to the changes of the external environment, which is affected by a lot of elements and the requirements of the competitive environment. The faces of those projects are several problems in order to achieve particular goals. To overcome these difficulties has been the development of research in the last two decades and turn the focus on the role of the cost of project management, by providing information and assist management in planning and control of the budget among the main elements of the project, namely, (time-cost-quality),The research aims at the possibility of developing and implementing mechanisms

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Tue Aug 01 2023
Journal Name
Iop Conference Series: Earth And Environmental Science
Sustainability of Agricultural Productivity of Potato Crop in Desert Soils and Evaluation of Water Productivity Under Drip Irrigation System with Future Climate Changes
...Show More Authors

A field experiment was conducted during the spring season 2020 in Karbala proving/ Al-Sharia Distrit, located at latitude N 32° 42' 13.8" and longitude E 43° 54' 36.6" and at an altitude of 27 m above sea level. The experiment included a study of two factors: the first, Irrigation Interval, three treatments were used: irrigation treatment every 2 days, Irrigation treatment every 4 days, and Irrigation treatment every 6 days. The second factor is the addition of soil conditioners, in which four treatments were used: the control treatment without any addition, the treatment of adding bio-organic fertilizers, the treatment of adding water-conserving technology (polymer), and the treatment of adding water-conserving technology + fertilizers O

... Show More
View Publication Preview PDF
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Sat Sep 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Evaluation of the performance of scheduling The implementation of school buildings projects: (Project of the Ministry of Education No. 1)
...Show More Authors

It highlights the importance of construction projects because of its significant role in the development of society, including the buildings FEDE projects to their importance to raise the level of education through the conclusion of the special to implementation and the establishment of schools of contracts at the country level, which requires the completion of the project at less time and within the cost specified and the best quality and may highlight the importance of time on all the elements of what has an important role in setting up the project for various reasons may be the need for the use of schools as soon as possible, but the reality showed exceeded the completion of those schools could be up to 6 years and there are some cont

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Apr 06 2020
Journal Name
Asian Journal Of Civil Engineering
Integrated project delivery (IPD) method with BIM to improve the project performance: a case study in the Republic of Iraq
...Show More Authors

View Publication
Scopus (18)
Crossref (19)
Scopus Crossref
Publication Date
Mon Apr 05 2021
Journal Name
Solid State Technology
Genetic Algorithms in Construction Project Management: A Review
...Show More Authors

Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem

... Show More
View Publication Preview PDF
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Mar 01 2015
Journal Name
Journal Of Engineering
Scheduling of Irrigation and Leaching Requirements
...Show More Authors

Iraq depends mainly on Tigris and Euphrates Rivers to provide high percentage of agricultural water use for thousands years. At last years, Iraq is suffering from shortage in water resources due to global climate changes and unfair water politics of the neighboring countries, which affected the future of agriculture plans for irrigation, added to that the lack of developed systems of water management in the irrigation projects and improper allocation of irrigation water, which reduces water use efficiency and lead to losing irrigation water and decreasing in agricultural yield. This study aims at studying the usability of irrigation and leaching scheduling within the irrigating projects and putting a complete annual or seasonal irrigatio

... Show More
View Publication Preview PDF
Publication Date
Wed Jun 30 2010
Journal Name
Al-kindy College Medical Journal
Re-evaluation of lunation of the activity of somantibacterial drugs against clinical isolates of Escherichia coli in al- najaf al- ashref governorate
...Show More Authors

ackground: Escherichia coli is one of the most
important bacterial pathogen that can cause several
disease to human being . In our study we try to
investigate the sensitivity resistance pattern of
Escherichia coli against three antibiotics ( Amikacin,
Nalidixic acid and Cephalexin).
Methods: For this purpose we collected 51 clinical
isolates of Escherichia coli from stool and urine of
outpatient and inpatient patients from different wards
of AL-SADER Teaching Hospital in AL-NAJAF
AL-ASHRAf, IRAQ, and tested by culture and
sensitivity test .
Results: The results appeared that Amikacin show
the highest percentage of sensitivity ( 66.66 % ) ,
while Cephalexin show the lowest percentage of
sensiti

... Show More
View Publication Preview PDF
Publication Date
Thu Sep 01 2016
Journal Name
Journal Of Engineering
Movement of Irrigation Water in Soil from a Surface Emitter
...Show More Authors

Trickle irrigation is one of the most conservative irrigation techniques since it implies supplying water directly on the soil through emitters. Emitters dissipate energy of water at the end of the trickle irrigation system and provide water at emission points. The area wetted by an emitter depends upon the discharge of emitter, soil texture, initial soil water content, and soil permeability. The objectives of this research were to predict water distribution profiles through different soils for different conditions and quantify the distribution profiles in terms of main characteristics of soil and emitter. The wetting patterns were simulated at the end of each hour for a total time of application of 12 hrs, emitter disch

... Show More