Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of a construction project, this study constructed the matrix of probability and impact variables and put the periods based on the risk score. Finally, this study identified a fourth main risk group and twenty-two sub-risk factors that are appropriate for the tendering phase of construction projects in Iraq

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Feb 28 2022
Journal Name
Journal Of Educational And Psychological Researches
Social Support and Its Relationship to Psychological Rigidity in a Sample of Breast Cancer Patients In the Ramallah and Al-Bireh Governorate
...Show More Authors

This study aims to identify the impact of social support on breast cancer patients’ psychological rigidity using a sample in Ramallah and al-Bireh. A descriptive correlative approach was adopted to fulfill the goals of the study and a questionnaire consisted of two criteria: social support and psychological rigidity, which was adopted as a tool for data collection for the study. In order to achieve the goals of the study, the researcher selected a convenient sample that consisted of 123 female breast cancer patients in Ramallah and al-Bireh. This sample represented 50% of the original patient population. The study showed that the average estimated percentage of social support and psychological rigidity for women with breast cancer, in

... Show More
View Publication Preview PDF
Publication Date
Sun Apr 30 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

  The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs.         All of these arcs are incomplete.         The number of distinct (12,3)-arcs are six, two of them are complete.         There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete.         There exists one complete (15,3)-arc.
 

View Publication Preview PDF
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Sat Jun 07 2025
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.

... Show More
View Publication
Publication Date
Mon Jan 01 2018
Journal Name
Journal Of Engineering
Optimal Economic Design of Diversion Structures during Construction of a Dam by Particle Swarm Optimization
...Show More Authors

Publication Date
Mon Jan 01 2018
Journal Name
International Journal Of Science And Research (ijsr)
Optimal Economic Design of Diversion Structures during Construction of a Dam by Particle Swarm Optimization
...Show More Authors

Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost

... Show More
Publication Date
Mon Jun 01 2015
Journal Name
Conference: 8th International Conference And Exhibition On Design And Production Of Machines And Dies/molds
Design, Construction, and Controlling of A Shaped Metal Deposition Machine Using Arc Metal-Wire System
...Show More Authors

Publication Date
Thu Jun 01 2023
Journal Name
Baghdad Science Journal
Design and construction of anair pollution detection system using a laser beam and absorption spectroscopy
...Show More Authors

Air pollution is one of the important problems facing Iraq. Air pollution is the result of uncontrolled emissions from factories, car exhaust electric generators, and oil refineries and often reaches unacceptable limits by international standards. These pollutants can greatly affect human health and regular population activities. For this reason, there is an urgent need for effective devices to monitor the molecular concentration of air pollutants in cities and urban areas. In this research, an optical system has been built consisting of aHelium-Neonlaser,5mWand at 632.8 nm, a glass cell with a defined size, and a power meter(Gentec-E-model: uno) where a scattering of the laser beam occurs due to air pollution. Two pollutants were examin

... Show More
View Publication Preview PDF
Scopus (5)
Scopus Crossref
Publication Date
Tue Dec 01 2009
Journal Name
Iraqi Journal Of Physics
Construction of Anisotype CdS/Si Heterojunction and Lineup Using I-V and C-V Measurements
...Show More Authors

Near-ideal p-CdS/n-Si heterojunction band edge lineup has been investigated for the first time with aid of I-V and C-V measurements. The heterojunction was manufactured by deposition of CdS films prepared by chemical spray pyrolysis technique (CSP) on monocrystalline n-type silicon. The experimental data of the conduction band offset Ec and valence band offset Ec were compared with theoretical values. The band offset Ec=530meV and Ev=770meV obtained at 300K. The energy band diagram of p-CdS/n-Si HJ was constructed. C-V measurements depict that the junction was an abrupt type and the built-in voltage was determined from C-2-V plot

View Publication Preview PDF
Publication Date
Sun Apr 30 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(9)
...Show More Authors

  In this work, we construct and classify the projectively distinct (k,3)-arcs in PG(2,9), where k ≥ 5, and prove that the complete (k,3)-arcs do not exist, where 5 ≤ k ≤ 13. We found that the maximum complete (k,3)-arc in PG(2,q) is the (16,3)-arc and the minimum complete (k,3)-arc in PG(2,q) is the (14,3)-arc. Moreover, we found the complete (k,3)-arcs between them.

View Publication Preview PDF