Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at crisis management, specifically in the basic stages chosen for its development, which are before, during, and after a crisis. Therefore, an effective crisis management system has been developed consisting of 20 critical success factors with devising 59 actions that can be taken for each proposed criterion for each of the three stages of crisis.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Apr 22 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Developing models to predicting the effect of crises on construction projects using MLR technique
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Sat Aug 01 2020
Journal Name
Iop Conference Series: Materials Science And Engineering
Developing Systems Engineering for Sustainable Infrastructure Projects
...Show More Authors
Abstract<p>Globally, Sustainability is very quickly becoming a fundamental requirement of the construction industry as it delivers its projects; whether buildings or infrastructures. Throughout more than two decades, many modeling schemes, evaluation tools, and rating systems have been introduced en route to realizing sustainable construction. Many of these, however, lack consensus on evaluation criteria, a robust scientific model that captures the logic behind their sustainability performance evaluation, and therefore experience discrepancies between rated results and actual performance. Moreover, very few of the evaluation tools available satisfactorily address infrastructure projects. The res</p> ... Show More
View Publication
Scopus (4)
Crossref (3)
Scopus Crossref
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Engineering
Development of a Blueprint Impact System of the risks on construction projects Implementation
...Show More Authors

In Production and Operations Management the specialists  have  tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization.

     The research aims to develop a blu

... Show More
View Publication Preview PDF
Publication Date
Mon Jun 19 2023
Journal Name
Journal Of Engineering
A Proposed Management System for Construction Practices during Sustainable Buildings Life Cycle
...Show More Authors

For many years, the construction industry damages have been overlooked such as unreasonable consumption of resources in addition to producing a lot of construction waste but with global awareness growth towards the sustainable development issues, the sustainable construction practices have been adopted, taking into account the environment and human safety. The research aims to propose a management system for construction practices which could be adopted during constructing different types of sustainable buildings besides formulating flowcharts which clarify the required whole phases of sustainable buildings life cycle. The research includes two parts: theoretical part which generally ,handles the sustainability concepts at construction i

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Developing a Proposed System to Organize the Investment Opportunities in Iraq
...Show More Authors

......

The Iraqi government seeks to overcome the financial crisis by investing and privatizing some projects to achieve sustainable growth. Most of the investment projects in Iraq suffer from many constraints that greatly impact the success of these projects. A survey of the opinions of a group of experts was conducted to identify the most important constraints facing the investment process in Iraq. Then the experts' answers were arranged in a closed questionnaire and distributed to the research sample for which the statistical analysis was conducted. Through it, the most important (17) factors that had the greatest impact on the failure of investment projects in Iraq were reached. One of the main constraints was

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Developing System of Solid Waste Management (Applied Research in Hilla City)
...Show More Authors

Abstract

The research aims to stand on the practice of operations management of solid waste in the city of Hilla, carried out by the mayor of Hilla Directorate - solid and the environment Waste Division, through field visits and personal interview to officials of the municipal departments and units of its data collection and information related to solid waste, and assess the current status of the processes of collection and transport waste through the questionnaire that had been prepared for citizens and employees, the search reach a set of conclusions was the most important, operations carried out by the municipality of Hilla Directorate only limited to two (collection, transportation and disposal of wa

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Nov 17 2022
Journal Name
Aip Conference Proceedings
Principles of using project management tools and techniques of mitigate components causing delays and disruption in public and private construction projects in Iraq
...Show More Authors

Delays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in

... Show More
Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Periodicals Of Engineering And Natural Sciences
Using modified earned value for cost control in construction projects
...Show More Authors

Scopus (13)
Scopus