Diyala Governorate was exposed recently to high flood waves discharged from Hemrin Dam to Diyala River when the dam reached its full capacity. The recently recorded discharge capacity of Diyala River was reduced to just 750m3/s. This exposes cities and villages along the Diyala River to flood risk when discharging the flood waves, which may reach 3000 m3/s. It is important to manage, suggest, and design flood escapes to discharge the flood waves from Hemrin Dam away from Diyala River. This escape branches from Hemrin Lake towards Ashweicha Marsh. One dimensional hydraulic model was developed to simulate the flow within the escape by using HEC-RAS software. Eighty-two cross-sections were extracted from the digital elevation model for the escape and used as geometric data. Moreover, thirty cross-sections for the Diyala River were utilized from the Strategic Study for Water and Land Resources in Iraq. Since the escape passes through two regions of different geological formations, two roughness coefficients of 0.035and0.028were used. Two discharge cases were applied3000m3/s, which is the 500 years return period extreme hydrograph of Hemrin Dam, and 4000 m3/s, which is the design discharge of Hemrin Dam spillway. A spillway was proposed at the escape entrance with crest level 105m.a.m.s.l., followed by a drop structure with eighteen rectangular steps
Community pharmacists faced more complex challenges in meeting patients’ medication needs during the pandemic than previously reported in the literature. Objectives To explore the perception and abilities of community pharmacists in managing patients’ needs in terms of medication dispensing during the pandemic, and to examine its effect on improving the patients’ situations. Materials and Methods A cross-sectional study design, validated by 30 experts, was conducted using an electronic survey (Google Form) to assess the effect of the dispensing practice of Iraqi community pharmacists on the patient’s clinical outcomes during the pandemic. The survey was distributed on professional pharmacist’s social media platforms from December
... Show MoreOne of the principle inputs to project economics and all business decisions is a realistic production forecast and a practical and achievable development plan (i.e. waterflood). Particularly this becomes challenging in supergiant oil fields with medium to low lateral connectivity. The main objectives of the Production Forecast and feasibility study for water injection are:
1- Provide an overview of the total expected production profile, expected wells potential/spare capacity, water breakthrough timing and water cut development over time
2- Highlight the requirements to maintain performance, suggest the optimum developmen
The way used to estimate the fuzzy reliability differs according to the nature of the information of failure time which has been dealt in this research.The information of failure times has no probable distribution to explain it , in addition it has fuzzy quality.The research includes fuzzy reliability estimation of three periods ,the first one from 1986 to 2013,the second one from 2013 to 2033 while the third one from 2033 to 2066 .Four failure time have been chosen to identify the membership function of fuzzy trapezoid represented in the pervious years after taking in consideration the estimation of most researchers, proffional geologists and the technician who is incharge of maintaining of Mosul Dam project. B
... Show MoreDam break is series phenomenon that can result in fatal consequences and loss of properties. Unfortunately, the observed consequences can only be available after the dam breaks. Therefore, it is important to anticipate what will happen prior to dam break to issue suitable warning and locate the possible risk areas. This study attempts to simulate the case of dam break in Blue Nile at Roseires dam and see its consequences downstream. Roseires dam lies at a distance of 630 km south of Khartoum, Sennar dam lies at about 260 km downstream of Roseires dam. In this study hydraulic model is developed based of Hydraulic Engineering Centre (HEC), River Analysis System (RAS), and HEC- RAS. The HEC-RAS based model is calibrated and validated usi
... Show MoreDiverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show MoreThe most prevalent chronic complication of diabetes mellitus is diabetic neuropathy. The pathogenesis of diabetic neuropathy is exacerbated by hyperglycemia-induced oxidative stress, which causes nerves to deteriorate in a programmed manner. Many clinical trials depend on supplement in an attempt to improve neuropathy symptoms such as (pain & tingling) and patient quality of life, one of them is Coenzyme Q10 which is reported to have an anti-inflammatory and antioxidant effects, and was totally nontoxic and non-reported side effects. This study aimed to evaluate using a Coenzyme Q10 supplement as an adjuvant therapy to gabapentin to improve the clinical symptoms of diabetic neuropathy in relation to its anti-inflammatory and antioxid
... Show MoreThis paper presents a three-dimensional Dynamic analysis of a rockfill dam with different foundation depths by considering the dam connection with both the reservoir bed and water. ANSYS was used to develop the three-dimensional Finite Element (FE) model of the rockfill dam. The essential objective of this study is the discussion of the effects of different foundation depths on the Dynamic behaviour of an embanked dam. Four foundation depths were investigated. They are the dam without foundation (fixed base), and three different depths of the foundation. Taking into consideration the changing of upstream water level, the empty, minimum, and maximum water levels, the results of the three-dimensional F
Economic analysis plays a pivotal role in managerial decision-making processes. This analysis is predicated on deeply understanding economic forces and market factors influencing corporate strategies and decisions. This paper delves into the role of economic data analysis in managing small and medium-sized enterprises (SMEs) to make strategic decisions and enhance performance. The study underscores the significance of this approach and its impact on corporate outcomes. The research analyzes annual reports from three companies: Al-Mahfaza for Mobile and Internet Financial Payment and Settlement Services Company Limited, Al-Arab for Electronic Payment Company, and Iraq Electronic Gateway for Financial Services Company. The paper concl
... Show More