Preferred Language
Articles
/
joe-133
Intelligence in Construction between Contemporary and Traditional Architecture
...Show More Authors

The authentic traditional architecture proved that it is very convenient to the environmental and social regulations where it appeared and lasted for hundred of years.

This traditional architecture got the intelligence in providing thermal comfort for their occupants by the intelligent usage of the building materials and the intelligent planning and designs which took in consideration the climatic condition and the aerodynamics of the whole city as one ecological system starting from the cold breeze passing through its narrow streets till it enters the dwelling units and glides out through the wind catchers.

This architecture had been neglected and replaced by modern imported architecture which had collapsed within few decades not in our region only but all over the world. Now a days the increasing awareness of the global environmental crisis the green or sustainable architecture appeared as a new type of architecture by the eighties of the last century.

Today these types of buildings began to enter Arab countries in general and Arabian Gulf countries especially like Masdar city, where smart building can be seen with inelegant treatments which will replace the modern high rise towers with its glass facades.

This will lead to the general research problem which concerns the shortage of knowledge about the inelegance in design and planning used in the traditional architecture, and the special research problem concerning the shortage of knowledge concerning the ability to use the inelegant traditional architectural and planning concepts as a base for the future sustainable modern buildings and cites as the aim of this research.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Feb 03 2019
Journal Name
Journal Of The College Of Education For Women
Place philosophy of dramatic show construction
...Show More Authors

0

View Publication Preview PDF
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Study on Safety Construction Management Plan
...Show More Authors

After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were ra

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Educational And Psychological Researches
Construction Bullying scale for Kindergarten child
...Show More Authors

Construction of photographed bullying scale of kindergarteners was the aim of this study. The study conducted to answer the raised question, could the bullying among kindergarteners be measured?. A total of (200) boy and girl were selected from city of Baghdad to be the sample of the study. The scale composed of (27) item with colored pictures. It takes about (15) minuets to answer the whole scale items. SPSS tools were used to process the collected data. The result showed that the bullying among kindergarteners could be measured.

View Publication Preview PDF
Publication Date
Wed Jun 01 2011
Journal Name
Journal Of The College Of Languages (jcl)
Areas in phonetics and phonology Differences Between Speech and Writing
...Show More Authors

In any language there is some amount of difference between written language (planned) and spoken language (spontaneous). Since planned speech could be considered a form of written language, it could be inferred that there are also differences between planned speech and spontaneous speech. Some of these differences are very clear in terms of syntax, lexis, phonology and discourse.  These differences are highlighted in order to make a clear distinction between spontaneous and planned speech.

             This paper is an attempt to show the differences between the two forms of a language (written & spoken English) as far as number of linguistic features are tackle

... Show More
View Publication Preview PDF
Publication Date
Fri Jan 01 2021
Journal Name
Professional Safety
Shedding Light on the Concept of Social Equity in SUSTAINABLE CONSTRUCTION
...Show More Authors

Publication Date
Mon Mar 07 2022
Journal Name
Construction Research Congress 2022
Impact of Green Construction on Safety Performance in the Built Environment
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Tue Jan 01 2019
Journal Name
Advances In Informatics And Computing In Civil And Construction Engineering: Proceedings Of The 35th Cib W78 2018 Conference: It In Design, Construction, And Management
Technology alternatives for workplace safety risk mitigation in construction: Exploratory study
...Show More Authors

Publication Date
Sat Dec 01 2012
Journal Name
Iraqi Journal Of Science
Applications of Camera Total Station System (CTSS) in the Construction Surveying
...Show More Authors

AZ Khalaf, M kassim Haidir, LK Jasim, Iraqi Journal of Science, 2012

View Publication
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology & Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
...Show More Authors

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
View Publication
Crossref (11)
Crossref