Financing Cost Optimization in Construction Sector: A Review
...Show More Authors

The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in their models or included a schedule of borrowed money and a repayment schedule with interest rates. The aim of this study is not only to eliminate the shortcomings of previous studies but also to incorporate a financing optimization model for various funding alternatives available to contractors in terms of funding sources and forms, cash provision times, interest rates and repayment options. This work proposes a financing optimization model, not only to remove the limitations but also to find optimal financing costs while offering the financing schedule without increasing the project duration and adjusting the starting times of the activities.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Jul 01 2023
Journal Name
Journal Of Engineering
Using of Constructed Wetlands in The Treatment of Wastewater: A Review for Operation and Performance: Review for Using of Constructed Wetlands in The Treatment of Wastewater: Operation and Performance
...Show More Authors

Wastewater recycling for non-potable uses has gained significant attention to mitigate the high pressure on freshwater resources. This requires using a sustainable technique to treat natural municipal wastewater as an alternative to conventional methods, especially in arid and semi-arid rural areas. One of the promising techniques applied to satisfy the objective of wastewater reuse is the constructed wetlands (CWs) which have been used extensively in most countries worldwide through the last decades. The present study introduces a significant review of the definition, classification, and components of CWs, identifying the mechanisms controlling the removal process within such units. Vertical, horizontal, and hybrid CWs

... Show More
View Publication Preview PDF
Scopus (1)
Crossref (5)
Scopus Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Engineering
Exploring the Factors Affecting the Elemental Cost Estimation with Relationship Analysis Using AHP
...Show More Authors

Cost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering.  Elemental estimation, which in the early stage, estimates the construction costs depending on  . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela

... Show More
View Publication Preview PDF
Publication Date
Mon Jan 13 2020
Journal Name
Day 3 Wed, January 15, 2020
Numerical Simulation of Gas Lift Optimization Using Genetic Algorithm for a Middle East Oil Field: Feasibility Study
...Show More Authors
<p>Gas-lift technique plays an important role in sustaining oil production, especially from a mature field when the reservoirs’ natural energy becomes insufficient. However, optimally allocation of the gas injection rate in a large field through its gas-lift network system towards maximization of oil production rate is a challenging task. The conventional gas-lift optimization problems may become inefficient and incapable of modelling the gas-lift optimization in a large network system with problems associated with multi-objective, multi-constrained, and limited gas injection rate. The key objective of this study is to assess the feasibility of utilizing the Genetic Algorithm (GA) technique to optimize t</p> ... Show More
View Publication
Scopus (15)
Crossref (8)
Scopus Crossref
Publication Date
Mon Jan 28 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The Managerial Skills and It`s Role in Strengthening the Competitive Edge of Companies: A Case Study in the General Company for Construction Industries
...Show More Authors

This research tries to reveal how to manage and control the competitive edge for business by building managerial skills in various organizational levels. Our research aims at finding out the nature of various technical, human and in tellectual skills of a new president whose superiority is his competitive ness in the application field at general company for construe tioual  industriesand testing the surveyed minor and major changes through a questionnaire to collect information from officials. The sample was composed of (45) director. The data was analyzed  using some methods and statistical programs. The most prominent of these is (SPSS) that was used to extract the arithmetic mean, standard deviation, correlation coefficient

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Mar 30 2021
Journal Name
Journal Of Economics And Administrative Sciences
Detailed feasibility study of the pre-cast reinforced concrete project and its importance in the construction of Iraq
...Show More Authors

 

Purpose:  Providing practical knowledge of the requirements of a detailed feasibility study for selecting the investment project.

Findings:  Directing the private sector towards investing in productive projects - the pre-cast reinforced concrete project - as it achieves a financial return as well as providing Providing foreign currencies by reducing imports and exploiting available natural resources

Practical implications: The importance of a detailed feasibility study to determining whether the project can be implemented or not.

The precast concrete method is one of the best modern c

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sun May 03 2020
Journal Name
Journal Of Advanced Laboratory Research In Biology
Hepatitis B Virus (HBV): A Review on its Prevalence and Infection in different areas of Iraq
...Show More Authors

View Publication
Publication Date
Wed Aug 18 2021
Journal Name
Chemical Papers
Analytical methods for the identification of micro/nano metals in e-cigarette emission samples: a review
...Show More Authors

View Publication
Scopus (7)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Wed Aug 18 2021
Journal Name
Chemical Papers
Analytical methods for the identification of micro/nano metals in e-cigarette emission samples: a review
...Show More Authors

View Publication
Scopus (7)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Fri Jul 01 2016
Journal Name
Journal Of Engineering
Identificatio n Of Key Factors Affecting Waste Management In Life Cycle Of The Construction Project By Using Delphi Technique
...Show More Authors

The problem of generated waste as a result of the implementation of construction projects, has  been aggravated recently because of construction activity experienced by the world, especially Iraq, which is going through a period of reconstruction, where construction waste represents (20-40%) of the total generated waste and has a negative effect on the environment and economic side of the project. In addition, the rate of consumpted  amounts of natural resources are estimated to be about 40% in the construction industry, so it became necessary to reduce waste and to be manage well. This study aims to identify the key factors affecting waste management through the various phases of the project, and this is accom

... Show More
View Publication Preview PDF
Publication Date
Sun Feb 18 2024
Journal Name
Migration Letters
Knee Injuries And Rehabilitation: A Comprehensive Review Of The Psychological Landscape
...Show More Authors

MT Suhail, SA Hussein, MN Abdulhussein, WQ Abdaullateef, M khairallah Aid…, Migration Letters, 2024

View Publication