The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in their models or included a schedule of borrowed money and a repayment schedule with interest rates. The aim of this study is not only to eliminate the shortcomings of previous studies but also to incorporate a financing optimization model for various funding alternatives available to contractors in terms of funding sources and forms, cash provision times, interest rates and repayment options. This work proposes a financing optimization model, not only to remove the limitations but also to find optimal financing costs while offering the financing schedule without increasing the project duration and adjusting the starting times of the activities.
A (b,t)-blocking set B in PG(2,q) is set of b points such that every line of PG(2,q) intersects B in at least t points and there is a line intersecting B in exactly t points. In this paper we construct a minimal (b,t)-blocking sets, t = 1,2,3,4,5 in PG(2,5) by using conics to obtain complete arcs and projective codes related with them.
The relationship between the vision of the scenario and the director is represented in the second search for new mechanisms and possibilities that possess the direct effect and synonyms of the vision of the scenario, so he works on investing them in achieving his ideas and visions with more effectiveness and flexibility to achieve creative potentials, without resorting to the installations and expressive structures themselves that have exhausted their meaning, and lost their luster due to Its prevalence and familiarity on the one hand, and its activation on the other hand to achieve modernity at the level of aromas, after the director takes a method or approach that has privacy and exclusivity, and based on the foregoing, getting
... Show MoreThis study aims to assess the suitability of the sediments present in Tigris River, Tikrit city, northern Iraq for concrete production and road building purposes. Representative samples were collected from three selected stations at the study area using the channel modeling method. According to the grain size analysis, the sediments were classified as a type of poorly graded gravels (GP) depending on the unified soil classification system. The true specific gravity of the soil ranged between 2.28 and 2.568. The chemical analysis of the study samples revealed that gypsum content ranged between 0.82 and 1.69 %. Total soluble salts ranged 2.45- 3.87%, the organic matter content ranged 0.14- 0.76%, and the pH value was between 7.73 and 7.38%
... Show MoreBasketball is a popular game in many parts of the world and many developed countries are making continuous efforts to prepare and develop their emerging players on scientific and clear bases as the basis for reaching high levels The researchers used the descriptive approach in the method of correlative studies to suit the nature of the study The readymade software (IBM SPSS Statistics Version24) was used to perform statistical treatments The researchers concluded that there was a significant relationship between body size indicators (height and weight) with the fitness elements of the emerging basketball players The researchers recommended conducting a similar study to determine the type of relationship to the indicators of the physical str
... Show MoreAbstract
This study was to demonstrate the role-use planning scientific methods is disabled and little used in the planning and follow-up construction of vital projects in the province of Baghdad, including network planning methods, in order to find the optimal time to finish the project in light of the resources available and the budget set for it, in the current research has been used the most prominent network planning methods and two stylistic (CPM / PERT), was the application of the critical path method on standard-design school project (traditional) to draw Action Network according to confirmed times for the activities of the project and account his Crashing time , It was Pert technique applied to the project hemato
... Show MoreThe research aims to identify the importance of using the style of the cost on the basis of activity -oriented in time TDABC and its role in determining the cost of products more equitably and thus its impact on the policy of allocation of resources through the reverse of the changes that occur on an ongoing basis in the specification of the products and thus the change in the nature and type of operations . The research was conducted at the General Company for Textile Industries Wasit / knitting socks factory was based on research into the hypothesis main of that ( possible to calculate the cost of activities that cause the production through the time it takes to run these activities can then be re- distributed product cost
... Show MoreThe research Aim is to provide support to small enterprises by providing tools that enable measurement and test their performance and identifying weaknesses and work on them is determined by the problem of searching using traditional assessment methods for small projects with only financial performance measurement standards that do not provide a complete picture of the performance of these projects so use the balanced scorecard the four pillars (financial, customer, learning and growth, and internal processes) and identify deviations and work on them through the use of the outputs of the programme (probe), PROmoting Business Excellence-PROBE), which It is a model of performance evaluation, with which you can deve
... Show More In this paper,we construct complete (kn,n)-arcs in the projective plane PG(2,11), n = 2,3,…,10,11 by geometric method, with the related blocking sets and projective codes.
A (k,n)-arc is a set of k points of PG(2,q) for some n, but not n + 1 of them, are collinear. A (k,n)-arc is complete if it is not contained in a (k + 1,n)-arc. In this paper we construct complete (kn,n)-arcs in PG(2,5), n = 2,3,4,5, by geometric method, with the related blocking sets and projective codes.