The aim of this paper is to design a PID controller based on an on-line tuning bat optimization algorithm for the step-down DC/DC buck converter system which is used in the battery operation of the mobile applications. In this paper, the bat optimization algorithm has been utilized to obtain the optimal parameters of the PID controller as a simple and fast on-line tuning technique to get the best control action for the system. The simulation results using (Matlab Package) show the robustness and the effectiveness of the proposed control system in terms of obtaining a suitable voltage control action as a smooth and unsaturated state of the buck converter input voltage of ( ) volt that will stabilize the buck converter system performance. The simulation results show also that the proposed control system when compared with the other controllers results has the capability of minimizing the rising time to ( sec) and the settling time to ( sec) in the transient response and minimizing the voltage tracking error of the system output to ( ) volt at the steady state response. Furthermore, the number of fitness evaluations is decreased.
In this paper, a Sokol-Howell prey-predator model involving strong Allee effect is proposed and analyzed. The existence, uniqueness, and boundedness are studied. All the five possible equilibria have been are obtained and their local stability conditions are established. Using Sotomayor's theorem, the conditions of local saddle-node and transcritical and pitchfork bifurcation are derived and drawn. Numerical simulations are performed to clarify the analytical results
Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show MoreDEMs, thus, simply regular grids of elevation measurements over the land surface.The aim of the present work is to produce high resolution DEM for certain investigated region (i.e. Baghdad University Campus\ college of science). The easting and northing of 90 locations, including the ground-base and buildings of the studied area, have been obtained by field survey using global positioning system (GPS). The image of the investigated area has been extracted from Quick-Bird satellite sensor (with spatial resolution of 0.6 m). It has been geo-referenced and rectified using 1st order polynomial transformation. many interpolation methods have been used to estimate the elevation such as ordinary Kriging, inverse distance weight
... Show MoreI found that it does not meet some of the requirements, including browsing and organizing structural elements, which is something in which the researcher found a scope for research, and from here she can formulate the problem of her research with the following question: Is there an actual need to develop user interface designs in the websites of Iraqi colleges of fine arts? The research included four chapters (the first chapter - the research problem - the second chapter (theoretical framework), which included three sections, the first is to identify the user interface, the second topic is the structural elements, and the third topic includes the rules of interface design and the dimensions of interaction), as well as the third chapter i
... Show MoreThe research dealt with a comparative study between some semi-parametric estimation methods to the Partial linear Single Index Model using simulation. There are two approaches to model estimation two-stage procedure and MADE to estimate this model. Simulations were used to study the finite sample performance of estimating methods based on different Single Index models, error variances, and different sample sizes , and the mean average squared errors were used as a comparison criterion between the methods were used. The results showed a preference for the two-stage procedure depending on all the cases that were used
The novel has recently received great attention from readers and before them writers, due to the role it is playing, and this indicates an important rule, which is whenever there is art or creativity, there must be a criticism of its own, and this criticism is certainly no less important than its owner, so we find There are critics who have their distinguished literary position in following up the narrative development, and trying to describe the transformation of its elements, including Professor Fadel Thamer, and whoever wants to approach an element of the novel as an explorer, he must stand on the visions of this critic about it, and this is what made us take the element (personality) Tracking the most important opinions of the critic
... Show MoreThe European Unit has never been affected by a serious phenomena as the phenomena of the advancing of the far right parties. Though these parties vary in their impact in their original countries, they agree on one important issue which is the deconstruction of the European unit and limiting its supernational powers. These increasing popular parties aim at more national independence in decision making away from the decisions taken by Brussels. Moreover, they criticize the financial and administrative corruption accompanied many of the rescuing procedures directed for example towards countries like Greece and Spain during the international economic crisis. This failure nourishes many of the negative feelings against the European unit which
... Show More