Preferred Language
Articles
/
joe-1063
Developing a Model to Estimate the Productivity of Ready Mixed Concrete Batch Plant
...Show More Authors

Productivity estimating of ready mixed concrete batch plant is an essential tool for the successful completion of the construction process. It is defined as the output of the system per unit of time. Usually, the actual productivity values of construction equipment in the site are not consistent with the nominal ones. Therefore, it is necessary to make a comprehensive evaluation of the nominal productivity of equipment concerning the effected factors and then re-evaluate them according to the actual values.

In this paper, the forecasting system was employed is an Artificial Intelligence technique (AI). It is represented by Artificial Neural Network (ANN) to establish the predicted model to estimate wet ready mixed concrete (WRMC) plant production and dry ready mixed concrete (DRMC) plant production, in addition to determining the factors affecting productivity.

The results showed that the artificial intelligence neural network is an effective technique to estimate the productivity of the dry and wet ready mixed concrete batch plant. The ANN model showed satisfying results of validation for both training and external datasets with the range of training dataset and poor results with the data that exceeds the range of training. At the same time, the skills of the operators, frequent failure of concrete, and lack of construction materials were the most important factor that affected productivity.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Jun 30 2015
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation
...Show More Authors

Noor Oil Field is one of Iraqi oil fields located in Missan province / Amarah city. This field is not subjected to licensing rounds, but depends on the national effort of  Missan Oil Company. The first two wells in the field were drilled in seventies and were  not opened to production until 2009. The aim of this study is to study the possibility of using the method of gas lift to increase the productivity of this field . PROSPER software was used to design the continuous  gas lift by using maximum production rate in the design.

   The design was made after comparing  the measured pressure with the calculated pressure, this comparison  show  that the method of Beggs-Brill and Petroleum Exper

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Comparison Between Ordinary Methods (LS,IV) and Robust Methods (2SWLS,LTS,RA) to estimate the Parameters of ARX(1,1,1) Model for Electric Loads
...Show More Authors

 

Abstract:

The models of time series often suffer from the problem of the existence of outliers ​​that accompany the data collection process for many reasons, their existence may have a significant impact on the estimation of the parameters of the studied model. Access to highly efficient estimators  is one of the most important stages of statistical analysis, And it is therefore important to choose the appropriate methods to obtain good  estimators. The aim of this research is to compare the ordinary estimators and the robust estimators of the estimation of the parameters of

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Comparison between the Methods of Ridge Regression and Liu Type to Estimate the Parameters of the Negative Binomial Regression Model Under Multicollinearity Problem by Using Simulation
...Show More Authors

The problem of Multicollinearity is one of the most common problems, which deal to a large extent with the internal correlation between explanatory variables. This problem is especially Appear in economics and applied research, The problem of Multicollinearity has a negative effect on the regression model, such as oversized variance degree and estimation of parameters that are unstable when we use the Least Square Method ( OLS), Therefore, other methods were used to estimate the parameters of the negative binomial model, including the estimated Ridge Regression Method and the Liu type estimator, The negative binomial regression model is a nonline

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Sep 01 2022
Journal Name
Iop Conference Series: Earth And Environmental Science
Primary Productivity of Iraqi lakes: A Review
...Show More Authors
Abstract<p>Lentic ecosystems are important for fish production and are a critical habitat for waterfowl and numerous migratory birds. In this study we have gathered data on primary productivity of lakes across Iraq to provide updated information to strategize conservation and management. Tigris and Euphrates rivers are the primary sources of filling up major lakes in Iraq the overall assessment shows that the primary productivity is dependent on the algal composition and environmental factors with coincident role of macrophytes. An average of 37 to 637 mg carbon/m<sup>3</sup>/day of primary productivity was calculated for most of the lakes comprised of Bacillariophyceae and followed by</p> ... Show More
View Publication
Scopus (1)
Scopus Crossref
Publication Date
Sun Oct 10 2021
Journal Name
Journal Of Kirkuk University For Agricultural Sciences
Effect of Drought Stress (Water Deficit) and Plant Density on Productivity of Water and Zea mays (Baghdad Varieties) in Middle Region of Iraq
...Show More Authors

The objective of this study was to investigate the drought stress and plant density possibility on water productivity and grain yield of maize (Zea mays L.) (Planting Baghdad 3 synthetic varieties), Field experiment was conducted at Abu Ghraib Research Station (Baghdad) during spring and Autumn seasons of 2016 using a randomized complete block design arranged in split plot with three replications. Three irrigation treatment included: irrigation after depletion 50% of available water (T1), irrigation after depletion 75% of available water (T2) and irrigation after depletion 90% of available water (T3) in the main plots and three plant density which were: 1 seeds hill-1 (D1) giving a uniform plant density of 66666 plants ha-1 , 2 seeds hill1

... Show More
View Publication Preview PDF
Publication Date
Tue Jan 01 2019
Journal Name
J. Mech. Cont.& Math. Scis
The Use of Non-Parametric Methods to Estimate Density Functions of Copulas
...Show More Authors

Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Use Dynamic Bayesian network to estimate the reliability of Adamia Water Network
...Show More Authors

Abstract\

In this research, estimated the reliability of water system network in Baghdad was done. to assess its performance during a specific period. a fault tree through static and dynamic gates was belt and these gates represent logical relationships between the main events in the network and analyzed using dynamic Bayesian networks . As it has been applied Dynamic Bayesian networks estimate reliability by translating dynamic fault tree to Dynamic Bayesian networks and reliability of the system appreciated. As was the potential for the expense of each phase of the network for each gate . Because there are two parts to the Dynamic Bayesian networks and two part of gate (AND), which includes the three basic units of the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Dec 07 2014
Journal Name
Baghdad Science Journal
Baysian and NonBaysian Methods to Estimate the two parameters of Logistic Distribution
...Show More Authors

In this paper ,the problem of point estimation for the two parameters of logistic distribution has been investigated using simulation technique. The rank sampling set estimator method which is one of the Non_Baysian procedure and Lindley approximation estimator method which is one of the Baysian method were used to estimate the parameters of logistic distribution. Comparing between these two mentioned methods by employing mean square error measure and mean absolute percentage error measure .At last simulation technique used to generate many number of samples sizes to compare between these methods.

View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (3)
Clarivate Crossref
Publication Date
Sat Oct 01 2011
Journal Name
Journal Of Engineering
DEVELOPING LAMINAR MIXED CONVECTION HEAT TRANSFER THROUGH VERTICAL CONCENTRIC ANNULI WITH ADIABATIC INNER CYLINDER
...Show More Authors

Theoretical and experimental investigations have been carried out on developing laminar
combined free and forced convection heat transfer in a vertical concentric annulus with uniformly
heated outer cylinder (constant heat flux) and adiabatic inner cylinder for both aiding and opposing
flows. The theoretical investigation involved a mathematical modeling and numerical solution for
two dimensional, symmetric, simultaneously developing laminar air flows was achieved. The
governing equations of motion (continuity, momentum and energy) are solved by using implicit
finite difference method and the Gauss elimination technique. The theoretical work covers heat flux
range from (200 to 1500) W/m2, Re range from 400 to 2000 an

... Show More
View Publication Preview PDF
Crossref