Preferred Language
Articles
/
joe-1040
Mechanisms of Plant-Correlation Phytoremediation of Al-Daura Iraqi Refinery Wastewater Using Wetland Plant from Tigris River
...Show More Authors

In developing countries, conventional physico-chemical methods are commonly used for removing contaminants. These methods are not efficient and very costly. However, new in site strategy with high treatment efficiency and low operation cost named constructed wetland (CW) has been set. In this study, Phragmites australis was used with free surface batch system to estimate its ability to remediate total
petroleum hydrocarbons (TPH) and chemical oxygen demand (COD) from Al-Daura refinery wastewater. The system operated in semi-batch, thus, new wastewater was weekly added to the plant for 42 days. The results showed high removal percentages (98%) of TPH and (62.3%) for COD. Additionally, Phragmites australis biomass increased significantly during experiment period with 60% increasing in wet weight. These results proved the ability of Phragmites australis to tolerance in contaminant environment and enhanced biodegradation of TPH. Two kinetic models were used, and pseudo-second order was fitted to data with R2 of 0.999.
 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Feb 19 2024
Journal Name
Journal Of Engineering
Predicting Biochemical Oxygen Demand at the Inlet of Al-Rustumiya Wastewater Treatment Plant Using Different Mathematical Techniques
...Show More Authors

Water quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their performance is evaluated usin

... Show More
View Publication
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Predicting Biochemical Oxygen Demand at the Inlet of Al-Rustumiya Wastewater Treatment Plant Using Different Mathematical Techniques
...Show More Authors

Water quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their perfor

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Oct 01 2018
Journal Name
International Journal Of Civil Engineering And Technology (ijciet)
Effluent quality assessment of Al-Diwaniyah sewage treatment plant based on wastewater quality index
...Show More Authors

Treated effluent wastewater is considered an alternative water resource which can provide an important contribution for using it in different purposes, so, the wastewater quality is very important for knowing its suitability for different uses before discharging it into fresh water ecosystems. The wastewater quality index (WWQI) may be considered as a useful and effective tool to assess wastewater quality by indicating one value representing the overall characteristic of the wastewater. It could be used to indicate the suitability of wastewater for different uses in water quality management and decision making. The present study was conducted to evaluate the Al-Diwaniyah sewage treatment plant (STP) effluent quality based on wastewa

... Show More
Publication Date
Sat Jul 01 2000
Journal Name
Bulletin Of The Iraq Natural History Museum (p-issn: 1017-8678 , E-issn: 2311-9799)
EFFICIENCY OF AL-RUSTAMITYAH SEWAGE PLANT AND THEIR CONSEQUENCES ON THE POLLUTION OF DIYALA RIVER
...Show More Authors

The present work initiated to eaIuate the efficiency of Al-Rustamivah sewage treatment plant
as reflected by the quality of final effluent that is thrown to Di ala river. Weekly samples of
wastewater and final effluent were collected between November 1994 and end of January
1995 and analyzed for different chemical and biological features. Results ha e inidicated that
Al-Rustamiyah sewage treatment plant could not be able efficiently to purify the raw sewage.
The mean values of suspended solids. BOD. COD Dichromate and Oil & grease effluents
were felt to pass standard limits (98.4. 92.8. 125.2 and 39.1 ppm. respectiel). The atherse
possible effects of pollution on Diuala equatic life hae been also discussed in res

... Show More
View Publication Preview PDF
Publication Date
Sun Aug 22 2021
Journal Name
Biochemical & Cellular Archives
THE EFFICIENCY OF NERIUM OLEANDER PLANT IN PHYTOREMEDIATION OF SOILS CONTAMINATED WITH LEAD AND CADMIUM
...Show More Authors

Publication Date
Tue Sep 01 2020
Journal Name
Journal Of Engineering
Stabilization of Al-Rustamiya Waste Water Treatment Plant Sludge Using Lime
...Show More Authors

A study was performed to evaluate heavy metals removal from sewage sludge using lime. The processes of stabilization using alkaline chemicals operating on a simple principle of raising pH to 12 or higher, with sufficient mixing and suitable contact time to ensure that immobilization can reduce heavy metals. A 0.157 m3 tank was designed to treat Al-Rustemeyia wastewater treatment plant sludge. Characteristics of raw sludge were examined through two parameters: pH and heavy metal analysis. Different lime doses of (0- 25) g CaO/100 g sludge were mixed manually with raw sludge in a rotating drum. The samples were analyzed two hours after mixing. pH and heavy metals results were compared with EPA and National Iraqi Stand

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sun Jun 30 2019
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Performance of Subsurface Flow Constructed Wetland Systems in the Treatment of Al-Rustumia Municipal Wastewater using Continuous Loading Feed
...Show More Authors

This study aimed at comparing the performance of vertical, horizontal and hybrid subsurface flow systems in secondary treatment for the effluent wastewater from the primary basins at Al-Rustumia wastewater treatment plant, Baghdad, Iraq. The treatments were monitored for six weeks while the testsduration were from 4 to 12 September 2018 under continuous wastewater feeding for chemical oxygen demand (COD), total suspended solid (TSS),ammonia-nitrogen(NH4-N) and phosphate (PO4-P) in comparison with FAO and USEPA standards for effluent discharge to evaluate the suitability of treated water for irrigation purposes. Among the systems planted with Phragmites Australia, the hybrid subsurface flow system which cons

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Tue Jun 01 2021
Journal Name
Iop Conference Series: Earth And Environmental Science
Treatment of Al-Muthanna Petroleum Refinery Wastewater by Electrocoagulation Using a Tubular batch Electrochemical Reactor
...Show More Authors
Abstract<p>An electrocoagulation process has been used to eliminate the chemical oxygen demand (COD) from wastewaters discharged from the Al-Muthanna petroleum refinery plant. In this process, a circular aluminum bar was used as a sacrificial anode, and hallow cylinder made from stainless steel was used as a cathode in a tubular batch electrochemical Reactor. Impacts of the operating factors like current density (5-25mAcm<sup>-2</sup>), NaCl addition at concentrations (0-2g/l), and pH at values (3-11) on the COD removal efficiency were studied.</p><p>Results revealed that the increase in current density increases the COD removal efficiency, whereas an increase</p> ... Show More
View Publication
Scopus (10)
Crossref (4)
Scopus Crossref
Publication Date
Sun Sep 01 2024
Journal Name
Journal Of Radiation Research And Applied Sciences
Bioaccumulation and translocation of radionuclides heavy metals in Cynodon dactylon: A phytoremediation approach in Al-Dora refinery
...Show More Authors

View Publication
Crossref (1)
Clarivate Crossref
Publication Date
Sun Jan 01 2023
Journal Name
International Conference On Scientific Research &amp; Innovation (icsri 2022)
Investigating the capability of MCM-41 nanoparticle for COD removal from Iraqi petroleum refinery wastewater
...Show More Authors

View Publication Preview PDF
Scopus (5)
Crossref (5)
Scopus Crossref