Preferred Language
Articles
/
jih-686
The Construction and Reverse Construction of the Complete Arcs in the Projective 3-Space Over Galois Field GF(2)
...Show More Authors

  The main purpose of this work is to find the complete arcs in the projective 3-space over Galois field GF(2), which is denoted by PG(3,2), by two methods and then we compare between the two methods

View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Sep 15 2023
Journal Name
Al-academy
Dramatic construction of bullying scenes in animated films
...Show More Authors

Given the importance of the phenomenon of bullying and its spread in the productions of animated films and the resulting impact on them, and the dominance of a large number of satellite channels that simulate different age stages and for both sexes. It is bullying others and their imitation of characters inspired by animated films with aggressive behavior that appears in them by imposing his authority by force on those who are weaker than him and in various methods that fall within the concept of bullying, and the interest of most satellite channels in this type of production that simulates different age groups, this research comes as an attempt A scientific method through which the researcher seeks to know the issue of the dramatic cons

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Jan 28 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The Managerial Skills and It`s Role in Strengthening the Competitive Edge of Companies: A Case Study in the General Company for Construction Industries
...Show More Authors

This research tries to reveal how to manage and control the competitive edge for business by building managerial skills in various organizational levels. Our research aims at finding out the nature of various technical, human and in tellectual skills of a new president whose superiority is his competitive ness in the application field at general company for construe tioual  industriesand testing the surveyed minor and major changes through a questionnaire to collect information from officials. The sample was composed of (45) director. The data was analyzed  using some methods and statistical programs. The most prominent of these is (SPSS) that was used to extract the arithmetic mean, standard deviation, correlation coefficient

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Sun Feb 03 2019
Journal Name
Journal Of The College Of Education For Women
Place philosophy of dramatic show construction
...Show More Authors

0

View Publication Preview PDF
Publication Date
Mon Jul 01 2019
Journal Name
Journal Of Educational And Psychological Researches
The Impact of Strategy 3-2-1 in acquiring Concepts of Sociology of fourth grade students: The Impact of Strategy 3-2-1 in acquiring Concepts of Sociology of fourth grade students
...Show More Authors

 

Abstract

The current research aims to identify the impact of triangular bridging strategy in the acquisition of sociology of fourth-stage students. To achieve the research objective, the following null hypotheses were adopted: there are no statistically significant differences at a significance level (0, 05) between the average grades of the experimental group students who studied the triangular bridging strategy in acquiring concepts of sociology and average grades of the control group. The researcher has selected the fourth-stage students from Alexandronah School for girls that s related to the Directorate General of Baghdad the sample consisted of (87) students at litera

... Show More
View Publication Preview PDF
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Application of Geographic Information System for Preparing the Bill of Quantities of Construction Projects
...Show More Authors

The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Feb 01 2023
Journal Name
Practice Periodical On Structural Design And Construction
Best Practice Strategies for Workforce Development and Sustainability in Construction
...Show More Authors

View Publication
Scopus (11)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Sat Feb 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Arab spring and problematic prescriptions capitalist construction in transitional economy
...Show More Authors

ان الرأسمالية ليست بناءً هندسياً يتم انتظامه وفقاً للنظريات الهندسية والمعادلات الرياضية والفنون المعمارية، لأنها ببساطة نظاماً اجتماعياً يقوم على تشكيلة اقتصادية معينة، والأخيرة تقوم على مستوى معين لتطور قوى الانتاج (التكنولوجيا) والذي يقوم عليه مستوىً معين لعلاقات الإنتاج، ويقوم على التشكيلة الاقتصادية/ نمط الإنتاج نظاماً سياسياً، هو جزء من البناء الفوقي، ولأنها نظاماً اجتماعياً بالمواصفات انفة

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Oct 30 2018
Journal Name
Journal Of Engineering
Evaluation of the Project Overhead Costs in Iraqi Construction Industry using Fuzzy Analytic Hierarchy Process (FAHP)
...Show More Authors

This research investigated the importance and priorities of the project overhead costs in Iraq via a questionnaire using the fuzzy analytic hierarchy process technique (FAHP). Using this technique is very important in the uncertain circumstances as in our country. The researcher reached to frame an equation through the results of the priorities of weights include the percentages of each of the main items of the project overhead costs. The researcher tested this equation by applying it to one of the completed projects and the results showed suitability for the application. The percentages of the (salaries, grants, and incentives) and (fieldwork requirements) in equation represent approximately two-thirds of project overhe

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Apr 02 2022
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Impact of Contractual Budget In Support Of Sustainable Development Applied Research In The Ministry Of Housing And Construction And Public Municipalities
...Show More Authors

The research starts from studying the contractual budget, which is one of the modern trends in preparing public budgets, both operational and capital, in addition to meeting the requirements of the global trend to achieve sustainable growth in all fields, whether financial or non-financial, and tools for the contractual budget have been identified (participation contracts, planning Implementation, monitoring) and studying its impact in supporting sustainable development through its dimensions (economic, social, and environmental). The method of the questionnaire was adopted as a main tool in collecting information on research variables and distributing it to a sample of (70) individuals who dictate positions of professional respo

... Show More
View Publication Preview PDF