In this paper, we present a Branch and Bound (B&B) algorithm of scheduling (n) jobs on a single machine to minimize the sum total completion time, total tardiness, total earliness, number of tardy jobs and total late work with unequal release dates. We proposed six heuristic methods for account upper bound. Also to obtain lower bound (LB) to this problem we modified a (LB) select from literature, with (Moore algorithm and Lawler's algorithm). And some dominance rules were suggested. Also, two special cases were derived. Computational experience showed the proposed (B&B) algorithm was effective in solving problems with up to (16) jobs, also the upper bounds and the lower bound were effective in restricting the search.
Various types of heterogeneous five membered rings were prepared from the reaction of the compound chloro Di Fluro acetic acid with Schiff bases (which was prepared using different Aldehydes, Ketones, and amines [H10-H1] and five membered rings were prepared (derivatives of Oxazolidine-5-one, and the presence of Tetrahydrofuran (THF) [H20-H11]. Melting points of the compounds were measured. The prepared compounds were diagnosed spectrally by using UV-Visible and Infrared spectroscopy, and (1H-NMR) Spectrum for some compounds. The results confirmed the validity of the proposed chemical compositions
In this paper, an estimate has been made for parameters and the reliability function for Transmuted power function (TPF) distribution through using some estimation methods as proposed new technique for white, percentile, least square, weighted least square and modification moment methods. A simulation was used to generate random data that follow the (TPF) distribution on three experiments (E1 , E2 , E3) of the real values of the parameters, and with sample size (n=10,25,50 and 100) and iteration samples (N=1000), and taking reliability times (0< t < 0) . Comparisons have been made between the obtained results from the estimators using mean square error (MSE). The results showed the
... Show MoreIn this paper, we used maximum likelihood method and the Bayesian method to estimate the shape parameter (θ), and reliability function (R(t)) of the Kumaraswamy distribution with two parameters l , θ (under assuming the exponential distribution, Chi-squared distribution and Erlang-2 type distribution as prior distributions), in addition to that we used method of moments for estimating the parameters of the prior distributions. Bayes
The aim of this research is to know the effect of two strategies of active learning, the five fingers and traffic signals, on the first grade intermediate level student's achievement and personal intelligence. The research sample was chosen from the Al- Mansour intermediate school for boys, including (101) students divided into three groups chosen randomly which represented the first experimental group (32) students, the second experimental group (34) students, and the control group (33) students. To achieve the research aims, the research prepared a physics achievement test containing (26) items, and a personal intelligence test containing (20) items. The psychometric characteristics, of the tests were checked up the following results were
... Show MoreThe production function forms one of the techniques used in evaluation the production the process for any establishment or company, and to explain the importance of contribution of element from the independent variable and it's affect on the dependent variable. Then knowing the elements which are significant or non-significant on the dependent variable.
So the importance of this study come from estimating the Cobb-Douglas production function for Al- Mansoor General Company for Engineering industries in Iraq during the period (1989-2001)
To explain the importance which effects the independent variable such as
(N
Transforming the common normal distribution through the generated Kummer Beta model to the Kummer Beta Generalized Normal Distribution (KBGND) had been achieved. Then, estimating the distribution parameters and hazard function using the MLE method, and improving these estimations by employing the genetic algorithm. Simulation is used by assuming a number of models and different sample sizes. The main finding was that the common maximum likelihood (MLE) method is the best in estimating the parameters of the Kummer Beta Generalized Normal Distribution (KBGND) compared to the common maximum likelihood according to Mean Squares Error (MSE) and Mean squares Error Integral (IMSE) criteria in estimating the hazard function. While the pr
... Show MoreRecently a large number of extensive studies have amassed that describe the removal of dyes from water and wastewater using natural adsorbents and modified materials. Methyl orange dye is found in wastewater streams from various industries that include textiles, plastics, printing and paper among other sources. This article reviews methyl orange adsorption onto natural and modified materials. Despite many techniques available, adsorption stands out for efficient water and wastewater treatment for its ease of operation, flexibility and large-scale removal of colorants. It also has a significant potential for regeneration recovery and recycling of adsorbents in comparison to other water treatment methods. The adsorbents described herein were
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show More