In this research, has been to building a multi objective Stochastic Aggregate Production Planning model for General al Mansour company Data with Stochastic demand under changing of market and uncertainty environment in aim to draw strong production plans. The analysis to derive insights on management issues regular and extra labour costs and the costs of maintaining inventories and good policy choice under the influence medium and optimistic adoption of the model of random has adoption form and had adopted two objective functions total cost function (the core) and income and function for a random template priority compared with fixed forms with objective function and the results showed that the model of two phases with k = 4 is the best model of random which contributed to reducing costs by approximately 7%. It was also a statement that the change in the total costs will be changed by the possibilities associated with cases predicted demand (scenarios) where we note the low cost and with a high probability of low demand. In contrast, the total cost increases with increasing demand. Because the change in the possibilities leads to change in the Production plan for future. As well as the building and solving model multi-objectives by constraint method improved (augmented) and the results were derived a set of acceptable solutions rather than a single solution and thus can be a decision-maker to choose the best solution for the specific case of the optimization problem of multiple objectives, was Form solution using the developed software GAMS
In this research work an attempt has been made to investigate about the Robustness of the Bayesian Information criterion to estimate the order of the autoregressive process when the error of this model, Submits to a specific distributions and different cases of the time series on various size of samples by using the simulation, This criterion has been studied by depending on ten distributions, they are (Normal, log-Normal, continues uniform, Gamma , Exponential, Gamble, Cauchy, Poisson, Binomial, Discrete uniform) distributions, and then it has been reached to many collection and recommendations related to this object , when the series residual variable is subject to each ( Poisson , Binomial , Exponential , Dis
... Show MoreAbstract
Objectives: The main objective of this study is to find the influence level of nursing incivility on psychological well-being among nurses in southeastern Iraq.
Methods: In this descriptive correlational study, a convenience sample of 250 nurses working in three government hospitals in Missan province in the south of Iraq were surveyed using the nursing incivility scale (NIS) and Ryff's psychological well-being scale (PWB) from November 2021, to July 2022. A multivariate multiple regression analysis was done to analyze the multivariate effect of workplace incivility on the psychological well-being of nurses.
Results: The study results show a
... Show MoreAbstract
Binary logistic regression model used in data classification and it is the strongest most flexible tool in study cases variable response binary when compared to linear regression. In this research, some classic methods were used to estimate parameters binary logistic regression model, included the maximum likelihood method, minimum chi-square method, weighted least squares, with bayes estimation , to choose the best method of estimation by default values to estimate parameters according two different models of general linear regression models ,and different s
... Show MoreThe aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.
It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed
... Show MoreAbstract
The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve thes
... Show MoreThe aim of this study is to use style programming goal and technical programming goal fuzzy to study assessing need annual accurately and correctly depending on the data and information about the quantity the actual use of medicines and medical supplies in all hospitals and health institutions during a certain period where they were taking the company public for the marketing of medicines and medical supplies sample for research. Programming model was built goal to this problem, which included (15) variable decision, (19) constraint and two objectives:
1 - rational exchange of budget allocated for medicines and supplies.
2 - ensure that the needs of patients of medicines and supplies needed to improve
Abstract:
The models of time series often suffer from the problem of the existence of outliers that accompany the data collection process for many reasons, their existence may have a significant impact on the estimation of the parameters of the studied model. Access to highly efficient estimators is one of the most important stages of statistical analysis, And it is therefore important to choose the appropriate methods to obtain good estimators. The aim of this research is to compare the ordinary estimators and the robust estimators of the estimation of the parameters of
... Show MoreIn light of the increasing interest in Child-rearing in nurseries and kindergartens and the most important experiences gained by the child at this stage that form the basis for the subsequent stages of her/his physical mental and social growth.
The significance of the research concentrates the need to asses the affecting variables on the child growth to create opportunities for her/him to have intact rearing.
The research also aims to classify these variables at each age level and highlight its moral role.
The problem of the research is the lack of clarity of different variables impact of the child growth in different age levels in nurseries and kindergart
... Show MoreBy driven the moment estimator of ARMA (1, 1) and by using the simulation some important notice are founded, From the more notice conclusions that the relation between the sign and moment estimator for ARMA (1, 1) model that is: when the sign is positive means the root gives invertible model and when the sign is negative means the root gives invertible model. An alternative method has been suggested for ARMA (0, 1) model can be suitable when