The way used to estimate the fuzzy reliability differs according to the nature of the information of failure time which has been dealt in this research.The information of failure times has no probable distribution to explain it , in addition it has fuzzy quality.The research includes fuzzy reliability estimation of three periods ,the first one from 1986 to 2013,the second one from 2013 to 2033 while the third one from 2033 to 2066 .Four failure time have been chosen to identify the membership function of fuzzy trapezoid represented in the pervious years after taking in consideration the estimation of most researchers, proffional geologists and the technician who is incharge of maintaining of Mosul Dam project. By using matlab programme , acpecial programme of research was designed to estimate the fuzzy reliability of last three periods ,according to the results it was found that fuzzy reliability of Al.mosul dam in the recent time reaches to 0.5 approxmatly while the fuzzy reliability of Al.mosul dam after 20 years will reach to 0.1,ie, the danger of actual collapse of the dam will be in 2033 ,So that it is important to build a new dam making sure from chosing a suitable location with respect to soil quilty , geological and clamatic which suround the location , This is to avoid the same mistake which makes us lose 33 years from the hypothetical life time of Mosul dam according to the estimation of the company which build the dam.
This research is an attempt to study and evaluate the maintenance function at Factory 7 - The State General Company for Leather Industries, and to design a computerized preventive maintenance system to design and to analyze preventive maintenance. To accomplish the objectives of this research, data were gathered and analyzed according to the reliability engineering criteria for the period 2/1– 30/6/2005, then a preventive maintenance plan was designed for each machine of the sample study using the computerized system designed in this research. A Monte Carlo Simulation methodology was used for the purpose of evaluating the performance of the preventive maintenance plan of each machine for one year. The simulation res
... Show MoreAbstract. This work presents a detailed design of a three-jointed tendon-driven robot finger with a cam/pulleys transmission and joint Variable Stiffness Actuator (VSA). The finger motion configuration is obtained by deriving the cam/pulleys transmission profile as a mathematical solution that is then implemented to achieve contact force isotropy on the phalanges. A VSA is proposed, in which three VSAs are designed to act as a muscle in joint space to provide firm grasping. As a mechatronic approach, a suitable type and number of force sensors and actuators are designed to sense the touch, actuate the finger, and tune the VSAs. The torque of the VSAs is controlled utilizing a designed Multi Input Multi Output (MIMO) fuzzy controll
... Show MoreFive sites were chosen to the north of Babil Governorate in order to identify the limnological features and the impact of the Hindiya Dam during 2019. Site2 was located near the dam to reflect the ecological features of this site, whereas other sites, S1 was located at the upstream of the dam as a control site. Moreover, the two other sites S3 and S4 were located down the dam. The results of the study showed a close correlation between air and water temperature at all sites. Also there were significant differences in average of thirteen out of eighteen water parameters.Water temperature, total alkalinity, bicarbonate, DO, POS, TH and Mg+2 ions decreased from 22.76˚C, 203.33 mg/L,
... Show MoreThe control charts are one of the scientific technical statistics tools that will be used to control of production and always contained from three lines central line and upper, lower lines to control quality of production and represents set of numbers so finally the operating productivity under control or nor than depending on the actual observations. Some times to calculating the control charts are not accurate and not confirming, therefore the Fuzzy Control Charts are using instead of Process Control Charts so this method is more sensitive, accurate and economically for assisting decision maker to control the operation system as early time. In this project will be used set data fr
... Show MoreThe idea of ech fuzzy soft bi-closure space ( bicsp) is a new one, and its basic features are defined and studied in [1]. In this paper, separation axioms, namely pairwise, , pairwise semi-(respectively, pairwise pseudo and pairwise Uryshon) - fs bicsp's are introduced and studied in both ech fuzzy soft bi-closure space and their induced fuzzy soft bitopological spaces. It is shown that hereditary property is satisfied for , with respect to ech fuzzy soft bi-closure space but for other mentioned types of separations axioms, hereditary property satisfies for closed subspaces of ech fuzzy soft bi-closure space.
A numerical study of the two-dimensional steady free convection flow in an inclined annulus between two concentric square cavities filled with a porous medium is presented in this paper for the case when the side outer walls are kept with differentially heated temperature while the horizontal outer walls and the inner walls are insulated. The heated wall is assumed to have spatial sinusoidal temperature variation about a constant mean value. The Darcy model is used and the fluid is assumed to be a standard Boussinesq fluid. For the Cartesian coordinate system, the governing equations which were used in stream function form are discretized by using the finite difference method with successive under – relaxation method (SUR) and are solv
... Show Moreعند إطلالتنا على هذا البلد العربي لابد من التقصي ولو بعجاله عن اقتصاده وهو الاهم باعتبار ان الاقتصاد هو شريان الحياة لأي أمة فلا غنى ولا تهاون في نفس الوقت عن هذا الجانب المهم الذي يرتبط مدى تطوره بتطور البلد وهذا الاخير مرتبط بما متوفر لديه من موارد بشريه ومادية وان تفاوتت النسبة بينها فلا ضير في ذلك فالاهم هو وجود الموجه والمخطط بالاتجاه الصحيح نحو الاستغلال الامثل لهذه الموارد
(وان قلّتْ) وبالتالي
Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show More