Preferred Language
Articles
/
jeasiq-470
Entry cost based on activity-based cost specifications and comparative study
...Show More Authors

Several recent approaches focused on the developing of traditional systems to measure the costs to meet the new environmental requirements, including Attributes Based Costing (ABCII). It is method of accounting is based on measuring the costs according to the Attributes that the product is designed on this basis and according to achievement levels of all the Attribute of the product attributes. This research provides the knowledge foundations of this approach and its role in the market-oriented compared to the Activity based costing as shown in steps to be followed to apply for this Approach. The research problem in the attempt to reach the most accurate Approach in the measurement of the cost of products from the Approaches (ABC) and (ABCII), and research aims mainly to indicate the role of the Attribute Based Costing Approach to provide the most accurate cost information compared to the Activity Based Costing Approach It works to meet the needs and desires of customers as the application starts by identifying customer specifications and characteristics desired by the customer in the product.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Geotechnical Engineering And Sustainable Construction
Determine the Most Common Geotechnical Risks and Their Impacts on the Cost and Time Schedule for Implementing Water Treatment Plants in Iraq
...Show More Authors

View Publication
Crossref
Publication Date
Fri May 05 2023
Journal Name
International Journal Of Professional Business Review
Optimal no. Of Crew in a Workshop Subject to Minimize the Total Cost
...Show More Authors

Purpose: The main objective of this paper is, to determine the optimal no. of technicians’ men in a workshop crew of an Industrial System.   Theoretical framework: The purpose of applying these tools is to explore their ability to reduce costs and improvements that can be obtained in the process of providing services to the end customer.   Design/methodology/approach: The literature structure review was built from analyzing 12 of scientific papers and books, from web sciences and the Elsevier database. The papers were analyzed from descriptive, methodologic, and citation characteristics.   Finding:  By applying the equation model of the paper, the optimal no. of technician men in the crew of the workshop can be determined when

... Show More
View Publication
Scopus Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
The Time-Cost Trade-off to Manage A Project in a Fuzzy Environment
...Show More Authors

In this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Engineering
Exploring the Factors Affecting the Elemental Cost Estimation with Relationship Analysis Using AHP
...Show More Authors

Cost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering.  Elemental estimation, which in the early stage, estimates the construction costs depending on  . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela

... Show More
View Publication Preview PDF
Publication Date
Thu Mar 06 2025
Journal Name
International Journal Of Applied Mechanics And Engineering
Comparison of The Mechanical Properties of Low-Cost Bio Fiber Reinforced Polymer Composites
...Show More Authors

In this study, the physical, and mechanical properties of low-cost and biocomposites were evaluated. The walnut shell and date palm frond fibers were thermally treated in an oven at a temperature of 70°C and then chemically treated with NaOH and distilled water solution, after these treatments, the biocomposite materials will be thermally treated again at 50°C. This procedure was performed for three types of biocomposite; Walnut shell Fiber Reinforced Polymer (WFRP), Date palm Fiber Reinforced Polymer (DFRP), and Hybrid Fiber Reinforced Polymer (HFRP), whereas the biocomposite sheets consisting of 30% biofibers and 70% unsaturated polyester, the mechanical test specimens were cut by a CNC machine according to ASTM standards. The e

... Show More
View Publication Preview PDF
Scopus (2)
Crossref (2)
Scopus Crossref
Publication Date
Fri Dec 31 2010
Journal Name
Journal Of Legal Sciences
The Moment of Contract Formation under the United Nations Convention on Contracts for the International Sale of Goods (1980) – A Comparative Study
...Show More Authors

There are two ways that the contract might be formed with (contracting between persons who are attended and contracting between absence persons).the need for determining the precise moment of the contract , is so clear because there is a specify period separate between the declaration of acceptance and the knowledge with it .and it is clear from the four theories known for jurisprudence (theory of the declaration of the acceptance, theory of exporting the acceptance , theory of the arrival of the acceptance , theory of the knowledge with the acceptance ) . It is difficult to promote one theory on another one if we look at each one and the justification of its supporters and what the opponents of each theory expose. Legal background and diff

... Show More
View Publication
Publication Date
Sun Jun 30 2024
Journal Name
Iraqi Journal Of Science
Gray-Scale Image Compression Method Based on a Pixel-Based Adaptive Technique
...Show More Authors

     Today in the digital realm, where images constitute the massive resource of the social media base but unfortunately suffer from two issues of size and transmission, compression is the ideal solution. Pixel base techniques are one of the modern spatially optimized modeling techniques of deterministic and probabilistic bases that imply mean, index, and residual. This paper introduces adaptive pixel-based coding techniques for the probabilistic part of a lossy scheme by incorporating the MMSA of the C321 base along with the utilization of the deterministic part losslessly. The tested results achieved higher size reduction performance compared to the traditional pixel-based techniques and the standard JPEG by about 40% and 50%,

... Show More
View Publication
Scopus (2)
Crossref (2)
Scopus Crossref
Publication Date
Tue Sep 08 2020
Journal Name
Baghdad Science Journal
Modified BFGS Update (H-Version) Based on the Determinant Property of Inverse of Hessian Matrix for Unconstrained Optimization
...Show More Authors

The study presents the modification of the Broyden-Flecher-Goldfarb-Shanno (BFGS) update (H-Version) based on the determinant property of inverse of Hessian matrix (second derivative of the objective function), via updating of the vector s ( the difference between the next solution and the current solution), such that the determinant of the next inverse of Hessian matrix is equal to the determinant of the current inverse of Hessian matrix at every iteration. Moreover, the sequence of inverse of Hessian matrix generated by the method would never  approach a near-singular matrix, such that the program would never break before the minimum value of the objective function is obtained. Moreover, the new modification of BFGS update (H-vers

... Show More
View Publication Preview PDF
Scopus (11)
Crossref (11)
Scopus Clarivate Crossref
Publication Date
Mon Dec 18 2017
Journal Name
Al-khwarizmi Engineering Journal
Experimental and Numerical Study of Collector Geometry Effect on Solar Chimney Performance
...Show More Authors

There have been many advances in the solar chimney power plant  since 1930 and the first pilot work was built in Spain (Manzanares) that produced 50 KW. The solar chimney power plant is considered of a clean power generation that needs to be investigated  to enhance the performance by studying the effect of changing the area of passage of air to enhance the velocity towards the chimney to maximize design velocity. In this experimental and numerical study, the reduction area of solar collector was investigated. The reduction area that mean changing the height of glass cover from the absorbing plate (h1=3.8cm, h2=2.6cm and h3=1.28cm). The numerical study was performed using ANSYS Fluent software package (version 14.0) to solve go

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Wed Mar 01 2023
Journal Name
Baghdad Science Journal
A Study on Nψβ and Nβψ - Closed sets in Neutrosophic Topological spaces
...Show More Authors

The aim of this paper is to introduce the concept of N  and Nβ -closed sets in terms of neutrosophic topological spaces. Some of its properties are also discussed.

View Publication Preview PDF
Scopus (2)
Scopus Clarivate Crossref