Research summarized in applying the model of fuzzy goal programming for aggregate production planning , in General Company for hydraulic industries / plastic factory to get an optimal production plan trying to cope with the impact that fluctuations in demand and employs all available resources using two strategies where they are available inventories strategy and the strategy of change in the level of the workforce, these strategies costs are usually imprecise/fuzzy. The plant administration trying to minimize total production costs, minimize carrying costs and minimize changes in labour levels. depending on the gained data from the plant of the major products for the second half of 2015 nd after the dissolution of the model using the software (GAMS) was getting the best level from the production , inventory and labour levels , where the total production costs was (7041700000) dinar Which is good compared to the cost reduction Cost set by the factory administration, which was (7668442100)dinars a difference (626742100) , carrying costs was (4327200 ) dinar Which is good compared to the cost reduction Cost set by the factory administration, which was ( 5583400)dinars a difference (1256200) and It found that the factory does not need to hire or lay off workers for the duration of the production plan. And resulting deviational value for the three fuzzy goal ( are (0.938, 1, 1) respectively. Through results we found that deviational value of the goals were close and equal for (1) that consider good , that were obtained were catered level of ambition of the decision-maker values.
The aim of this research is to solve a real problem in the Department of Economy and Investment in the Martyrs establishment, which is the selection of the optimal project through specific criteria by experts in the same department using a combined mathematical model for the two methods of analytic hierarchy process and goal programming, where a mathematical model for goal programming was built that takes into consideration the priorities of the goal criteria by the decision-maker to reach the best solution that meets all the objectives, whose importance was determined by the hierarchical analysis process. The most important result of this research is the selection of the second pro
... Show MoreIn this research was the study of a single method of estimation and testing parameters mediating variables (Mediation) in a specimen structural equations SEM a bootstrap method, for the purpose of application of the integrated survey of the situation Marital data and health mirror Iraqi (I-WISH) for the year 2011 from the Ministry of Planning - device Central Bureau of Statistics, and applied to the appropriate data from the terms of the data to a form of structural equation SEM using factor analysis affirmative (Confirmatory Factor analysis) CFA As a way to see the match variables that make up the model, and after confirming the model matching or suitability are having the effect of variables mediation in the model tested by the
... Show MoreThe main purpose of this work is to introduce some types of fuzzy convergence sequences of operators defined on a standard fuzzy normed space (SFN-spaces) and investigate some properties and relationships between these concepts. Firstly, the definition of weak fuzzy convergence sequence in terms of fuzzy bounded linear functional is given. Then the notions of weakly and strongly fuzzy convergence sequences of operators  are introduced and essential theorems related to these concepts are proved. In particular, if ( ) is a strongly fuzzy convergent sequence with a limit  where linear operator from complete standard fuzzy normed space  into a standard fuzzy normed space  then  belongs to the set of all fuzzy bounded linear operators 
The purpose of this paper is applying the robustness in Linear programming(LP) to get rid of uncertainty problem in constraint parameters, and find the robust optimal solution, to maximize the profits of the general productive company of vegetable oils for the year 2019, through the modify on a mathematical model of linear programming when some parameters of the model have uncertain values, and being processed it using robust counterpart of linear programming to get robust results from the random changes that happen in uncertain values of the problem, assuming these values belong to the uncertainty set and selecting the values that cause the worst results and to depend buil
... Show MoreNonlinear time series analysis is one of the most complex problems ; especially the nonlinear autoregressive with exogenous variable (NARX) .Then ; the problem of model identification and the correct orders determination considered the most important problem in the analysis of time series . In this paper , we proposed splines estimation method for model identification , then we used three criterions for the correct orders determination. Where ; proposed method used to estimate the additive splines for model identification , And the rank determination depends on the additive property to avoid the problem of curse dimensionally . The proposed method is one of the nonparametric methods , and the simulation results give a
... Show MoreThis paper includes the application of Queuing theory with of Particle swarm algorithm or is called (Intelligence swarm) to solve the problem of The queues and developed for General commission for taxes /branch Karkh center in the service stage of the Department of calculators composed of six  employees , and it was chosen queuing model is a single-service channel  M / M / 1 according to the nature of the circuit work mentioned above and it will be divided according to the letters system for each employee, and  it was composed of data collection times (arrival time , service time, departure time) 
                                                                                    ... Show More
                                                                            Abstract
This research deals will the declared production planning operation in the general company of planting oils, which have great role in production operations management who had built mathematical model for correct non-linear programming according to discounting operation during raw materials or half-made materials purchasing operation which concentration of six main products by company but discount included just three products of raw materials, and there were six months taken from the 1st half of 2014 as a planning period has been chosen . Simulated annealing algorithm application on non-linear model which been more difficulty than possible solution when imposed restric
... Show MoreThe Ant System Algorithm (ASA) is a member of the ant colony algorithms family in swarm intelligence methods (part of the Artificial Intelligence field), which is based on the behavior of ants seeking a path and a source of food in their colonies. The aim of This algorithm is to search for an optimal solution for Combinational Optimization Problems (COP) for which is extremely difficult to find solution using the classical methods like linear and non-linear programming methods.
The Ant System Algorithm was used in the management of water resources field in Iraq, specifically for Haditha dam which is one of the most important dams in Iraq. The target is to find out an efficient management system for
... Show MoreAbstract:
        This study is studied one method of estimation and testing parameters mediating variables in a structural equations model SEM is causal steps method, in order to identify and know the variables that have indirect effects by estimating and testing mediation variables parameters by the above way and then applied to Iraq Women Integrated Social and Health Survey (I-WISH) for year 2011 from the Ministry of planning - Central statistical organization to identify if the  variables having the effect of mediation in the model by the step causal methods by using AMOS program V.23, it was the independent variable X represents a phenomenon studied (cultural case of the
ABSTRUCT
This research aims at examining the expected gap between the fact of planning and controlling process of production at the State Company for Electric Industries and implementation of material requirements planning system in fuzzy environment. Developing solutions to bridge the gap is required to provide specific mechanisms subject to the logic of fuzzy rules that will keep pace with demand for increased accuracy and reduced waiting times depending on demand forecast, investment in inventory to reduce costs to a minimum.
The proposed solutions for overcoming the research problem has required some questions reflecting the problem with its multiple dimensions, which ar
... Show More 
        