Preferred Language
Articles
/
jeasiq-238
The Possibility of Applying Quality Management System ISO9001: 2008 in Station Project Al Rustumiya - A Case Study
...Show More Authors

The research study of the possibility of the application of the quality management system under the international standard ISO ISO9001: 2008 in the station project Rustumiya wastewater treatment of the Department of SEWER BAGHDAD - Baghdad MOREALITY as the first step in the right direction towards the implementation of total quality management (TQM), and the research Find the gap between the international standard and the quality system used in the organization surveyed through the use of checklists to analyze the gap, the checklist have included (191) items distributed on five basic requirements, according to the appearance in the international standard, namely, (quality management system, management responsibility, resource management, product realization, measurement, analysis and improvement), and after the diagnosis of the gap the search using some means of quality control statistically as PARETO DIAGRAM and CAUSE-EFFECT DIAGRAM for the purpose of analysis that gap and identify the strengths and weaknesses of the organization and the priorities to be followed by the TOP management in the organization in order to bridge the gap and including contributes to absorb and adopt the TOP management of the specification as Standard international, for the rehabilitation of the organization in the direction of obtaining a certificate of conformity to ISO ISO9001: 2008, the most important findings of research is a gap between the requirements of international standard and the reality of the application and documentation actual in the surveyed organization, which was increased by 52.7% due to partial application and the weak to the requirements specification in addition to documenting it partial, as well as the search Aograe some exceptions in the requirements of international standard and exclusively in the requirements of sub contained in item No. (7) of the International Standard ISO ISO 9001:2008, for the reason of the nature of the work of the organization and the type of products, the  exception was in the following sub-requirements (3-7: Design and development ,2-5-7: validating processes for production and service delivery, 3-5-7:IDENTIFICATION AND TRACEABILITY, 4-5-7 :   customer property,  5-5-7: reservation of  product), these exceptions have

been made under item (1-2: Application) of international standard.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Jan 29 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Implementing of Social Responsibility Standard ISO 26000 in Consumer Issues Market: Research and Consumer Protection Center -Study Case
...Show More Authors

Abstract The aim of this research is to show the grade of implementation of ISO 26000 (Social Responsibility Standard), specifically which related in clause sex (consumer issues), this study was achieved in Market Research and Consumer Protection Center (MRCPC) / University of Baghdad. The seven consumer issues of ISO 26000 was analyzed to show the extent of its implementation in MRCPC depending of using a check list as a principle instrument to collect research data and information. Results analysis was achieved by percentages and mean average. The research was leaded some of results and the most importance one was that the grade of implementation of the center in related to consumer issues given in the standard was medium

View Publication Preview PDF
Crossref
Publication Date
Wed Jan 01 2025
Journal Name
Aip Conference Proceedings
Predicting biochemical oxygen demand at Al-Rustumiya wastewater treatment plant inlet using the artificial neural network
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Mon Feb 19 2024
Journal Name
Journal Of Engineering
Predicting Biochemical Oxygen Demand at the Inlet of Al-Rustumiya Wastewater Treatment Plant Using Different Mathematical Techniques
...Show More Authors

Water quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their performance is evaluated usin

... Show More
View Publication
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Predicting Biochemical Oxygen Demand at the Inlet of Al-Rustumiya Wastewater Treatment Plant Using Different Mathematical Techniques
...Show More Authors

Water quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their perfor

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Mar 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
The impact of structural economic imbalances on inflation Case Study of the Iraqi economy
...Show More Authors

Abstract:

There is a close relationship between rigidity and distort structure of production and productivity and inflation rates. The effects of this relationship are distorted the contribution rate of the productive sectors and the disproportionate of exchange rate in foreign trade.

raising the general level of prices is one of the way that have been used by previous governments (inflationary financing or deficit financing) in order to speed up the process of capital formation, depending on the availability of economic resources idle.

The fabricating inflation for development does not represent a true understanding of the nature of the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Sep 01 2023
Journal Name
Civil Engineering Journal
Fundamental Challenges and Management Opportunities in Post Disaster Reconstruction Project
...Show More Authors

The study examines the root causes of delays that the project manager is unable to resolve or how the decision-maker can identify the best opportunities to get over these obstacles by considering the project constraints defined as the project triangle (cost, time, and quality) in post-disaster reconstruction projects to review the real challenges to overcome these obstacles. The methodology relied on the exploratory description and qualitative data examined. 43 valid questionnaires were distributed to qualified experienced engineers. A list of 49 factors causes was collected from previous international and local studies. A Relative Important Index (RII) is adapted to determine the level of importance of each sub-criterion in the fou

... Show More
View Publication
Scopus (12)
Crossref (12)
Scopus Clarivate Crossref
Publication Date
Thu Apr 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
Designing an electronic program for the Assessment of project management in accordance with the methodology (PMBOK)
...Show More Authors

The research aims to design an electronic program that allows users to assess the possibility of different practices for projects management professional according to the PMBOK methodology)) and using the requirements Data mentioned in the "knowledge and experience in project management Evaluation guide" issued by the professional Institute of project management According to the results of this program will be electronic The possible classification of project management in terms of both (proficiency_ perform tasks) as less than the desired level or within or above average in terms of best practices, and finally a number of recommendations to overcome the possible shortcomings. The most important is the need to enrich the service

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 05 2014
Journal Name
Journal Of Educational And Psychological Researches
Unemployment & its Problems Between Theory & Applying Field Study in Baghdad City
...Show More Authors

The unemployment is considered from the most danger problems that our society face them in current time & in the near future , because it makes prodigality for element of human being , particularly age of youth who have ability to work & producing , that resulted in negative effects forecast to dire consequences social and economical dangers . In the same time as will be stated in our explanation in the following in our research , because the unemployment has ability to help to prepare good environment to grow crime , actions of violence that mostly are main cause to decrease living level of majority of citizens & in increasing numbers who became under poverty , the unemployment is economical problem as it is psycholo

... Show More
View Publication Preview PDF
Publication Date
Sun Oct 03 2010
Journal Name
Journal Of Educational And Psychological Researches
The Effect of Applying K-W-L Technique on Teaching ESP Students
...Show More Authors

         Over the last few decades, many instructors have been trying all kinds of teaching methods, but without benefit. Nevertheless, in the 1986, a new technique is appeared which called K-W-L technique, it  is specified for reading comprehension passages because reading  skill is not easy matter for students for specific purposes (ESP).therefore, the K-W-L technique is a good one for thinking and experiences. To fulfill the aims and verify the hypothesis which reads as follows" it is hypothesized that there are no significant differences between the achievements of students who are taught according to K-W-L technique and those who are taught according to the traditional method

... Show More
View Publication Preview PDF
Publication Date
Sat Sep 30 2023
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The effect of applying assurance engagements according to the international standard IASE (3402) in enhancing the auditing action
...Show More Authors

Abstract:
                The research seeks to explain the role of the international auditing standard (3402) in the auditor's procedures, where the importance of the research stems from the adoption of international auditing standards in the Iraqi environment, including the standard (3402) of assurance engagements that the external auditor performs by submitting reports on the design of control tools and their operational effectiveness in a service facility that provides the beneficiaries with a service. To provide useful information for service organizations The control tools are of great benefit in rationalizing decisions, and many recommen

... Show More
View Publication Preview PDF