In this paper, the problem of resource allocation at Al-Raji Company for soft drinks and juices was studied. The company produces several types of tasks to produce juices and soft drinks, which need machines to accomplish these tasks, as it has 6 machines that want to allocate to 4 different tasks to accomplish these tasks. The machines assigned to each task are subject to failure, as these machines are repaired to participate again in the production process. From past records of the company, the probability of failure machines at each task was calculated depending on company data information. Also, the time required for each machine to complete each task was recorded. The aim of this paper is to determine the minimum expected time for the completion of all the machines assigned to perform their tasks in the company by using the dynamic optimization technique over finite and infinite horizons. By comparing the results, it was found that the first and second tasks were better than the third and the fourth tasks because the first task and the second one had completed their tasks in a shorter period than the others, they took 1379.2 hours and 1379.3 respectively during of horizons (stages), while the third task took 1379.4 hours and the fourth task 1379.5 hours. A careful analysis of the situation revealed that the time it takes for each machine to complete its tasks has been reduced, from appropriate planning and quick and effective maintenance can enhance the capacity of the machines and thus reduce time and effort, which contributes to reducing the company's costs and thus maximizing the production capability to increase the company's profits
This research is Interested in how the performance and implementation of factory production engine coolants of the General Company for Electrical Industries of its work, and to facilitate the flow of the decisions of senior management and access to all configurations, to ensure differentiation desired and reduce lost sales, resulting from poor scheduling of operations through the application of certain rules of scheduling operations in the production plant Engines Air-cooler, the objectives of research in identifying the best base and working to reduce the time and cost of Same Rules of Process which are considered the most influential of any organization and thr
... Show MoreFlow of water under concrete dams generates uplift pressure under the dam, which may cause the dam to function improperly, in addition to the exit gradient that may cause piping if exceeded a safe value. Cutoff walls usually used to minimize the effect of flow under dams. It is required to
1)minimize the flow quantity to conserve water in the reservoir, it is also required to
2)minimize the uplift pressure under the dam to maintain stability of the dam, and it is required to
3) minimize the exit gradient to prevent quick condition to occur at the toe of the dam where piping may occur and may cause erosion of the soil. Varying the angle of cutoff walls affects its influence on the factors aforementioned that are required to
... Show MoreThe capacity factor is the main factor in assessing the efficiency of wind Turbine. This paper presents a procedure to find the optimal wind turbine for five different locations in Iraq based on finding the highest capacity factor of wind turbine for different locations. The wind data for twelve successive years (2009-2020) of five locations in Iraq are collected and analyzed. The longitudes and latitudes of the candidate sites are (44.3661o E, 33.3152o N), (47.7738o E, 30.5258o N), (45.8160o E, 32.5165o N), (44.33265o E, 32.0107o N) and (46.25691o E, 31.0510o N) for Baghdad, Basrah, Al-Kut, Al-Najaf, and Al-Nasiriyah respectively. The average wind velocity, standard deviation, Weibull shape and scale factors, and probability density functi
... Show MoreArtificial Neural networks (ANN) are powerful and effective tools in time-series applications. The first aim of this paper is to diagnose better and more efficient ANN models (Back Propagation, Radial Basis Function Neural networks (RBF), and Recurrent neural networks) in solving the linear and nonlinear time-series behavior. The second aim is dealing with finding accurate estimators as the convergence sometimes is stack in the local minima. It is one of the problems that can bias the test of the robustness of the ANN in time series forecasting. To determine the best or the optimal ANN models, forecast Skill (SS) employed to measure the efficiency of the performance of ANN models. The mean square error and
... Show MoreTwo-dimensional unsteady mixed convection in a porous cavity with heated bottom wall is numerically studied in the present paper. The forced flow conditions are imposed by providing a hydrostatic pressure head at the inlet port that is located at the bottom of one of the vertical side walls and an open vent at the top of the other vertical side wall. The Darcy model is adopted to model the fluid flow in the porous medium and the combination effects of hydrostatic pressure head and the heat flux quantity parameters are carefully investigated. These governing parameters are varied over wide ranges and their effect on the heat transfer characteristics is studied in detail. It is found that the time required to reach a desired temperature at th
... Show MoreThe Karolinka earth-fill dam was constructed between 1977 and 1984 on the Stanovnice river above the town of Karolinka in the region of Vsetínsko in Czech Republic. Because of leakage on the downstream dam face due to technological indiscipline when filling dam layers during the dam construction stage, there were some steps to improve state dam safety. The final rehabilitation is to construct the diaphragm walls from self-hardening cement-bentonite suspension along the length of the dam. In addition to connecting the gallery and abutment (2 × 25 m long) by using jet piles. The article presents numerical modeling of safety factor evaluation associated with the state of the dam body and foundation; before, and after seal
... Show MoreThis study focuses on the slab-beam interaction in one-way systems. In the context of this study, slab-beam interaction means how beam deflection can affect moment distribution in one-way slabs. This interaction is usually neglected in the traditional approximate analysis that is adopted in engineering practice and design codes. Slab positive moments have been considered as indicators on the accuracy of approximate methods, as they overestimate negative moments while underestimating positive moments.
After proposing of effecting parameters in slab-beam interaction including of panel length and width, beam dimensions, and slab thickness, Buckingham’s theorem has been adopted to transform the dimensional-mo
... Show MoreIn this paper, effective slab width for the composite beams is investigated with special emphasis on the effect of web openings. A three dimensional finite element analysis, by using finite element code ANSYS, is employed to investigate shear lag phenomenon and the resulting effective slab width adopted in the classical T-beam approach. According to case studies and comparison with limitations and rules stipulated by different standards and codes of practice it is found that web openings presence and panel proportion are the most critical factors affecting effective slab width, whereas concrete slab thickness and steel beam depth are less significant. The presence of web opening reduces effective slab width by about 21%.
... Show MoreNon-biodegradability of rubber tires contributes to pollution and fire hazards in the natural environment. In this study, the flexural behavior of the Rubberized Reactive Powder Concrete (RRPC) beams that contained various proportions and sizes of scrap tire rubber was investigated and compared to the flexural behavior of the regular RPC. Fresh properties, hardened properties, load-deflection relation, first crack load, ultimate load, and crack width are studied and analyzed. Mixes were made using micro steel fiber of the straight type, and they had an aspect ratio of 65. Thirteen beams were tested under two loading points (Repeated loading) with small-scale beams (1100 mm, 150 mm, 100 mm) size.
The fine aggregate
... Show MoreThe reaction of LAs-Cl8 : [ (2,2- (1-(3,4-bis(carboxylicdichloromethoxy)-5-oxo-2,5- dihydrofuran-2-yl)ethane – 1,2-diyl)bis(2,2-dichloroacetic acid)]with sodium azide in ethanol with drops of distilled water has been investigated . The new product L-AZ :(3Z ,5Z,8Z)-2- azido-8-[azido(3Z,5Z)-2-azido-2,6-bis(azidocarbonyl)-8,9-dihydro-2H-1,7-dioxa-3,4,5- triazonine-9-yl]methyl]-9-[(1-azido-1-hydroxy)methyl]-2H-1,7-dioxa-3,4,5-triazonine – 2,6 – dicarbonylazide was isolated and characterized by elemental analysis (C.H.N) , 1H-NMR , Mass spectrum and Fourier transform infrared spectrophotometer (FT-IR) . The reaction of the L-AZ withM+n: [ ( VO(II) , Cr(III) ,Mn(II) , Co(II) , Ni(II) , Cu(II) , Zn(II) , Cd(II) and Hg(II)] has been i
... Show More