The education sector suffers from many problems, including the scarcity of schools that can absorb the increasing number of students in light of the increasing population growth rate, as some regions suffer from a lack of opening of new schools or the expansion of existing schools to increase their capacity so that attention is required. The research sought to identify the level of maturity of project management at the research site (Building Department in Al-Karkh I/ Ministry of Education) Being responsible for educational projects and their implementation and to know that, the ten areas of the knowledge guide to project management PMBOK have been adopted according to the PM3 model (one of the models of maturity of project management), because of the importance of projects provided by the department of school buildings, especially in the field of education, and that the implementation of projects at a high level of maturity, provides a benefit to a wide range of citizens, the research aims to determine the maturity level of each project department at the site of the research and to find out the most influential reasons and find the necessary solutions to address the decline in the level of maturity of project management. Adopted in this research the method of case study being the most appropriate to achieve the objectives of the research as well as the advantages of this approach of combining more than one method in one, the list of examination was used to determine the level of maturity of the administration and then determine the causes of it according to the scheme of cause and effect and address the causes through the scheme of the impact of the solution, and has The research reached a number of conclusions, the most important of which was the weakness of the departments for advance planning, such as the lack of a special number of divisions in the administration of the project, and a very high neglect of the department for human resources management, the required skills for the project are not identified, and no individual skills are adopted to enhance performance, and accordingly the research suggests using comprehensive quality tools to diagnose the causes of low maturity of project management and treatment in educational and educational institutions to reduce time, effort, cost and ease Application, and training in the organization the site of research on the use and practice of these tools by individuals.
The study titled “The role of the social media sites of Iraqi satellite channels in prioritizing the public” is a field study for the public of Dhi Qar.
The emergence of the social networking sites we are currently experiencing has undergone radical and important changes in the role of the mass media in light of the growth and rapid spread of modern technologies Or the so-called new media، which led the media organizations to create satellite channels on the social networks، which led to bypass the traditional lines between the public and media institutions with the public gain the possibility of The purpose of the research is to determine the habits and patterns of public use of the social media sites of the Iraqi satellite cha
The study aims to build a proposed training program for school leaders in the Sultanate of Oman on the planning practices of the Kaufman model in light of the needs and challenges of reality. It also aims to identify the challenges facing school leaders in practicing the stages of strategic planning. To achieve these objectives, the study adopted the descriptive approach due to its suitability to the nature of the study. A questionnaire was used to collect the needed data. The study sample included (225) individuals from school principals, their assistants and senior teachers in post-basic education in the Sultanate of Oman. After processing the data statistically, the study concluded that the reality of planning practices for school lea
... Show MoreVariable selection in Poisson regression with high dimensional data has been widely used in recent years. we proposed in this paper using a penalty function that depends on a function named a penalty. An Atan estimator was compared with Lasso and adaptive lasso. A simulation and application show that an Atan estimator has the advantage in the estimation of coefficient and variables selection.
التعددية السياسية بين الرفلض والقبول دراسة نظرية لأبرز الاتجاهات الاسلامية المعاصرة
Praise be to Allah. Praise be to Him. We seek refuge in Him. We seek forgiveness from him. We seek forgiveness from him.
And the disadvantages of our actions, of his hands
e
It is important, if not all, to pay tribute to God
Muhammad Abdo and Rasoulou, there is no way to deprive the nation of the weakness of God alone and not to share it
Which suffer from the Quran, and the loss of its borders, bad
The work did not work and did not improve
Do what they offer and delay the others, except by reference to this Koran and the extraction of treasures and secrets
And news.
The Great Quran Study
Lu Imito ordered each poisoned, and achieved several targets of
YEMYA: Knowing the secrets of the Grea
This study is marked by: The ignorant poem and body language
Its main objective is to reveal the manifestations of this language in the text mentioned, and accordingly, the sieve poem has been read semantic (semantic) and hermeneutic, revealing the poet's ability to employ symbols and signals (body language) in the poem chosen for this purpose; The existence of such language in pre-Islamic poetry. After a long reflection and reading, the signs and symbols of the physical movement of the body, and its feminine and aesthetic manifestations were identified, and this was achieved through the use of modern critical methodologies that directly affect this language. The study consisted of an introduction and three topics, followed by t
A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.
... Show MoreThe purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
Objective : The study was carried out to construct an initial assessment documentation tool for nursing
recording system in Coronary Care Unit.
Methodology : A descriptive, purposive sample of (65) nurses was selected from CCU of main
teaching hospitals (Al Karama, Al Kindy, Al Kadimia, Al Yarmmok, Baghdad teaching hospital, Ibn
Al Naffis hospital) and Ibn-Al betar hospital in Baghdad city from the 15th of April 2004 to the 15th of
April 2006.
The instrument was constructed and comprised of two sections: section one included the
nurses' demographic characteristic; section two was the initial assessment documentation tool that
contained (2) parts including: General information form and the initial assessment form.
A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu