The education sector suffers from many problems, including the scarcity of schools that can absorb the increasing number of students in light of the increasing population growth rate, as some regions suffer from a lack of opening of new schools or the expansion of existing schools to increase their capacity so that attention is required. The research sought to identify the level of maturity of project management at the research site (Building Department in Al-Karkh I/ Ministry of Education) Being responsible for educational projects and their implementation and to know that, the ten areas of the knowledge guide to project management PMBOK have been adopted according to the PM3 model (one of the models of maturity of project management), because of the importance of projects provided by the department of school buildings, especially in the field of education, and that the implementation of projects at a high level of maturity, provides a benefit to a wide range of citizens, the research aims to determine the maturity level of each project department at the site of the research and to find out the most influential reasons and find the necessary solutions to address the decline in the level of maturity of project management. Adopted in this research the method of case study being the most appropriate to achieve the objectives of the research as well as the advantages of this approach of combining more than one method in one, the list of examination was used to determine the level of maturity of the administration and then determine the causes of it according to the scheme of cause and effect and address the causes through the scheme of the impact of the solution, and has The research reached a number of conclusions, the most important of which was the weakness of the departments for advance planning, such as the lack of a special number of divisions in the administration of the project, and a very high neglect of the department for human resources management, the required skills for the project are not identified, and no individual skills are adopted to enhance performance, and accordingly the research suggests using comprehensive quality tools to diagnose the causes of low maturity of project management and treatment in educational and educational institutions to reduce time, effort, cost and ease Application, and training in the organization the site of research on the use and practice of these tools by individuals.
A high percentage of existing buildings in Iraq are traditional buildings, yet there is approximately no such green building in Baghdad or other governorates. Most of these buildings require urgent upgrading to increase their performance (operationally, economically, and environmentally), also the building owners looking for identifying and implementing many of the green building measures to reduce the operational and maintenance costs of their buildings. The decision-makers need to support the possibility of achieving sustainable measures of existing building rating systems such as LEED or BREEAM, and that would require an optimization model. The goal of this study is to maximize the
The research aims to identify the social control among kindergarten department students. In order to achieve the objective of the research, a sample of (400) female students: (200) from Baghdad University / Faculty of Education for women and (200) from Mustansiriyha University / Faculty of Basic Education were chosen randomly.
The researchers designed a tool to measure the social control of the study sample. It was exposed to group of specialists in the educational and psychological sciences, measurement and evaluation. In addition to specialists in kindergartens. Two indicators of validity were used. The Alpha-Cronbach method, Pearson correlation coefficient, and independent samples t-test were used to analyze the c
... Show MorePurpose: to demonstrate the possibility of moving to electronic data exchange dimensions (regulatory requirements, technical requirements, human requirements, senior management support) to simplify the work procedures dimensions (modern procedures, clarity of procedures, short procedures, availability of information and means required. The simplicity of the models used because of its importance to keep abreast of recent developments in the service of municipal works through the application of electronic data interchange, which simplifies procedures and out of the routine in the performance of the work of municipal departments has developed. It was applied to Municipality (Hilla) so that the transformation
... Show MoreThe aims of the research is to know the role of strategic to manage the human resources in enhancement the process of knowledge management in the Ministry of Transportation , In addition to the effects occurred on outcomes for both the managers and practitioners .
For the purpose of achieving the objectives of the research , the researchers designed a questionnaire that included (40 Points for collecting the primary data from the sample of the research which contained (51) indiviluals. In light of that, the data was to collect and analyzed and hypotheses were tested by using the (SPSS) Program, and a number of statistical techniques was used to attain the goal of the research such as the means , Sta
... Show MoreThe purpose behind building the linear regression model is to describe the real linear relation between any explanatory variable in the model and the dependent one, on the basis of the fact that the dependent variable is a linear function of the explanatory variables and one can use it for prediction and control. This purpose does not cometrue without getting significant, stable and reasonable estimatros for the parameters of the model, specifically regression-coefficients. The researcher found that "RUF" the criterian that he had suggested accurate and sufficient to accomplish that purpose when multicollinearity exists provided that the adequate model that satisfies the standard assumpitions of the error-term can be assigned. It
... Show MoreAs a result of the entry of multinationals companies in Iraq for investing in the joint projects through conducting agreements and contracts for work on important and strategic projects to get the necessary funds and various experiences which characterize the foreign participant sides that Iraq currently needs them and because of the non-applying the accounting processing stipulated in the unified accounting system in addition to the absence of a local accounting bases as well as the default of the participant contracts on indicating the accounting methods about those projects which are considered one of the bases that enables auditors in the public sector to depend on it, thus the research paper deals with studying an
... Show MoreThe aim of the research is to investigate potential effects of the finance industry and block-chain to general business of financing in particular, as well as its shortcomings and difficulties. To answer the research questions, the researcher used the objective narrative-analytical descriptive approach and included a qualitative analysis of Blockchain technology. The process of Blockchain technology based on their industries, the authors were selected based on their reputation in the Blockchain field. The research found that Blockchain can improve the efficiency of the banking industry's various sections. It has the ability to upgrade and transfer wages across borders, financial reporting and compliance, as well as trade finance
... Show MoreAbstract
Oil is considered a commodity and is still an important and prominent role in drawing and shaping the Iraqi economic scene. The revenues generated from the export of oil are considered the main source of the general budget in cash flows.
Since the revenues consist of quantity and price and the latter is an external factor which is difficult to predict, The effect of any commodity on its price, which is proven in the theory of micro-economic, but it is observed through the research that the response is slow, which means not to take advantage of the rise in prices, by increasing the quantity exported, the result of several facto
... Show MoreAbstract
The project of balad's major sewerage system is one of the biggest projects who is still in progress in salahulddin province provincial - development plan that was approved in 2013 . This project works in two parts ; the 1st is installing the sewerage networks (both of heavy sewerage & rain sewerage) and the 2nd is installing the life – off units (for heavy sewerage & rain sewerage , as well) . the directorate of salahuiddin is aiming that at end of construction it will be able to provide services for four residential quarters , one of the main challenges that project's management experience is how to achieve thes
... Show More