The Time-Cost Trade-off to Manage A Project in a Fuzzy Environment
...Show More Authors

In this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and then used another method, the method of time-cost exchange (TCT), which is one of the important techniques used by the project manager to shorten the time of completion of the project at the lowest cost has been achieved This method reduced the implementation time of the project by a large percentage. The results showed that the implementation period was reduced from (1309.5) days to (1224.2) days, and the cost of completion of (33353514407) dinars, an increase of (240496638) dinars.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
DESIGN OF A VARIABLE GAIN NONLINEAR FUZZY CONTROLLER AND PERFORMANCE ENHANCEMENT DUE TO GAIN VARIATION
...Show More Authors

In this paper, variable gain nonlinear PD and PI fuzzy logic controllers are designed and the effect of the variable gain characteristic of these controllers is analyzed to show its contribution in enhancing the performance of the closed loop system over a conventional linear PID controller. Simulation results and time domain performance characteristics show how these fuzzy controllers outperform the conventional PID controller when used to control a nonlinear plant and a plant that has time delay.

View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2012
Journal Name
Journal Of Engineering
DESIGN OF A VARIABLE GAIN NONLINEAR FUZZY CONTROLLER AND PERFORMANCE ENHANCEMENT DUE TO GAIN VARIATION
...Show More Authors

In this paper, variable gain nonlinear PD and PI fuzzy logic controllers are designed and the effect of the variable gain characteristic of these controllers is analyzed to show its contribution in enhancing the performance of the closed loop system over a conventional linear PID controller. Simulation results and time domain performance characteristics show how these fuzzy controllers outperform the conventional PID controller when used to control a nonlinear plant and a plant that has time delay.

Publication Date
Sat Mar 26 2022
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The theory of convergent between standard and optimal cost supporting actual cost in an Enterprise: بحث تطبيقي في معمل الألبسة الرجالية في النجف للفترة من 2007-2020
...Show More Authors

The research aims to achieve proof of convergence between optimal costs and standard costs in calculating costs for the economic unit, support efforts aimed at adopting optimal costs in cost accounts and accounting thought in general, and achieve benefit from the theory of convergence between optimal costs and standard costs in the field of achieving actual costs in The economic unit in order to reduce and converge, and this came to address the possibility of adopting the concept of optimal costs in the production costs calculations for the purposes of rationalizing administrative decisions, and rationalizing the preparation of financial statements within management accounting.

The research concluded that

... Show More
View Publication Preview PDF
Publication Date
Mon Mar 25 2019
Journal Name
Al-academy
Time in the Cinema...The Two Films (The Knife and The Deceived) -A Model: كريمة ناوي
...Show More Authors

This study deals with the time property in the cinema through two films: (The Knife) directed by Khalid Hamada and (The Deceived) directed by Tawfiq Saleh. These two films were excerpted by the cinema from two novels of the Palestinian writer Ghassan Kanafani, the first is from the novel (What is Left for You) and the second is from the novel (Men in the Sun).  If the Palestinian novel has imposed its presence on the Arab creative scene through a group of novelists who took it upon themselves to communicate their cause to the world,   the Palestinian cinema has been far from being a purely Palestinian, because many of the cinematic works have been provided by Arab countries on the issue, while this cinema is still seeking

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Journal Of Mechanical Engineering Research And Developments
Real-time control of robotic hand by human hand at low cost
...Show More Authors

Scopus (3)
Scopus
Publication Date
Fri Jan 01 2021
Journal Name
Review Of International Geographical Education
Evaluating the performance of project management using network diagrams methods: A case study in the Ramadi Municipality
...Show More Authors

This study came for the reason that some project administrations still do not follow the appropriate scientific methods that enable them to perform their work in a manner that achieves the goals for which those projects arise, in addition to exceeding the planned times and costs, so this study aims to apply the methods of network diagrams in Planning, scheduling and monitoring the project of constructing an Alzeuot intersection bridge in the city of Ramadi, as the research sample, being one of the strategic projects that are being implemented in the city of Ramadi, as well as being one of the projects that faced during its implementation Several of problems, the project problem was studied according to scientific methods through the applica

... Show More
Scopus (1)
Scopus
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Utilization of serial tendering to reduce the value project
...Show More Authors
Abstract<p>Serial tendering is better than other types of tendering when it comes to cost reduction, where civil infrastructure projects need a significant increase in the amount of tough planning, financial expenditures, engineering work, and resources of a different character than other types of construction projects. The effects of a lack of funding cause decrease in the completion speed of the project on time. The need to reduce the cost of bidding on recurrent civil infrastructure projects is critical. To achieve the desired goals of this research, this article will provide an overview of the type of bids used in the construction of schools implemented in the current financial perspective i</p> ... Show More
View Publication
Scopus Clarivate Crossref
Publication Date
Mon Nov 26 2018
Journal Name
Arab Science Heritage Journal
التباين بين مفهوم المشروع الإسلامي الحضاري والمشروع العولمي الغربي
...Show More Authors

The Islamic civilizational project has become anurgent necessity when Muslims and Arabs faced in recent years, with serious of challenges and the dangers that surrounded them; Globalization is one of these challenges.

View Publication Preview PDF
Publication Date
Wed Jun 30 2010
Journal Name
مجلة مركز الدراسات الفلسطينية /جامعة بغداد
المشروع النووي الايراني :بين الاحتواء السياسي والتهديد العسكري الاسرائيلي
...Show More Authors

يناقش البحث النشأة التاريخية للبرنامج النووي الايراني وحقيقة الدوافع الايرانية ورا المساعي وراء امتلاك القنية النووية ، ومارثون المفاوضات التي قادتها الترويكا الثلاثة النتمثله بكل من (فرنسا ،المانيا ، بريطانيا)لاحتواء تداعيات البرنامج النووي الايراني في ما لو استطاعت ايران تصميع قنبلة نووية والضغوط الامركية والاسرائيلية لاحتواء البرنامج

View Publication Preview PDF
Publication Date
Thu Jun 01 2023
Journal Name
Journal Of Engineering
Proposing a General Formula for Evaluating the Parametric Cost Using MLR Method
...Show More Authors

This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the re

... Show More
View Publication Preview PDF
Crossref