Scheduling projects using dynamic programming style and smart algorithm

The aim of this research is to compare traditional and modern methods to obtain the optimal solution using dynamic programming and intelligent algorithms to solve the problems of project management.

It shows the possible ways in which these problems can be addressed, drawing on a schedule of interrelated and sequential activities And clarifies the relationships between the activities to determine the beginning and end of each activity and determine the duration and cost of the total project and estimate the times used by each activity and determine the objectives sought by the project through planning, implementation and monitoring to maintain the budget assessed  And not exceed them and often the most important of these goals is to reduce the time of implementation of the project to the minimum possible and then compare the plan and the reality and avoid the differences that occurred early, depending on the commitment to the scheduled schedule and the extent of implementation of each activity in time and cost without delay The main objective is to extract the critical path and divide the project into multiple stages using dynamic programming method, which helps to know when the project will be completed and to know the critical path in which the delay of any activity affects the duration of completion of the project The results are compared with the results of the artificial intelligence method and using the hybrid algorithm where the results are the same in both methods and the completion time of the project is (675) working days. 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Dec 01 2009
Journal Name
Journal Of Economics And Administrative Sciences
Fuzzy Linear Programming problems

ان الغرض من هذا البحث هو المزج بين القيود الضبابية والاحتمالية. كما يهدف الى مناقشة اكثر حالات مشكلات البرمجة الضبابية شيوعا وهي عندما تكون المشكلة الضبابية تتبع دالة الانتماء مرة دالة الاتنماء المثلثية مرة اخرى، من خلال التطبيق العملي والتجريبي. فضلا عن توظيف البرمجة الخطية الضبابية في معالجة مشكلات تخطيط وجدولة الإنتاج لشركة العراق لصناعة الأثاث، وكذلك تم استخدام الطرائق الكمية للتنبؤ بالطلب واعتماده

... Show More
Crossref
View Publication Preview PDF
Publication Date
Sun Apr 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Determine Optimal Preventive Maintenance Time Using Scheduling Method

In this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.

The method of estimating the distribution parameters for each device was the OLS method.

The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and acc

... Show More
Crossref
View Publication Preview PDF
Publication Date
Tue Nov 19 2024
Journal Name
Journal Of University Of Babylon
View Publication
Publication Date
Tue Oct 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Solution of Fuzzy Maximal Flow Problems of Vehicles in Province of Diwaniyah Using the Ranking Function for Fuzzy Linear Programming Model

Abstract

The traffic jams taking place in the cities of the Republic of Iraq in general and the province of Diwaniyah especially, causes return to the large numbers of the modern vehicles that have been imported in the last ten years and the lack of omission for old vehicles in the province, resulting in the accumulation of a large number of vehicles that exceed the capacity of the city's streets, all these reasons combined led to traffic congestion clear at the time of the beginning of work in the morning, So researchers chose local area network of the main roads of the province of Diwaniyah, which is considered the most important in terms of traffic congestion, it was identified  fuzzy numbers for

... Show More
Crossref
View Publication Preview PDF
Publication Date
Sat Sep 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Evaluation of the performance of scheduling The implementation of school buildings projects: (Project of the Ministry of Education No. 1)

It highlights the importance of construction projects because of its significant role in the development of society, including the buildings FEDE projects to their importance to raise the level of education through the conclusion of the special to implementation and the establishment of schools of contracts at the country level, which requires the completion of the project at less time and within the cost specified and the best quality and may highlight the importance of time on all the elements of what has an important role in setting up the project for various reasons may be the need for the use of schools as soon as possible, but the reality showed exceeded the completion of those schools could be up to 6 years and there are some cont

... Show More
Crossref
View Publication Preview PDF
Publication Date
Thu Apr 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
Comparison Branch and Bound Algorithm with Penalty Function Method for solving Non-linear Bi-level programming with application

The problem of Bi-level programming is to reduce or maximize the function of the target by having another target function within the constraints. This problem has received a great deal of attention in the programming community due to the proliferation of applications and the use of evolutionary algorithms in addressing this kind of problem. Two non-linear bi-level programming methods are used in this paper. The goal is to achieve the optimal solution through the simulation method using the Monte Carlo method using different small and large sample sizes. The research reached the Branch Bound algorithm was preferred in solving the problem of non-linear two-level programming this is because the results were better.

Crossref
View Publication
Publication Date
Sat Feb 28 2015
Journal Name
Al-khwarizmi Engineering Journal
Stabilizing Gap of Pole Electric Arc Furnace Using Smart Hydraulic System

Abstract

Electric arc furnace applications in industry are related to position system of its pole, up and down of pole. The pole should be set the certain gap. These setting are needed to calibrate. It is done manually. In this research will proposed smart hydraulic to make this pole works as intelligent using proportional directional control valve. The output of this research will develop and improve the working of the electric arc furnace. This research requires study and design of the system to achieve the purpose and representation using Automation Studio software (AS), in addition to mathematically analyzed and where they were building a laboratory device similar to the design and conduct experiments to stud

... Show More
View Publication Preview PDF
Publication Date
Thu Dec 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
The role of my style (CPM / PERT) in enhancing the performance of construction projectsAn Empirical Study in the Department of projects in the office of the province of Baghdad

Abstract

This study was to demonstrate the role-use planning scientific methods is disabled and little used in the planning and follow-up construction of vital projects in the province of Baghdad, including network planning methods, in order to find the optimal time to finish the project in light of the resources available and the budget set for it, in the current research has been used the most prominent network planning methods and two stylistic (CPM / PERT), was the application of the critical path method on standard-design school project (traditional) to draw Action Network according to confirmed times for the activities of the project and account his Crashing time , It was Pert technique applied to the project hemato

... Show More
Crossref
View Publication Preview PDF
Publication Date
Thu Apr 25 2019
Journal Name
Iraqi Journal Of Market Research And Consumer Protection
PATTERN OF INVESTMENT PROJECTS IN THE INVESTMENT ENVIRONMENT: PATTERN OF INVESTMENT PROJECTS IN THE INVESTMENT ENVIRONMENT

That the building of the national economy depends on the extent of the possibility of transition from the rent economy seeking to increase GDP (GDP1), and the tendency to manage projects with external sources of funding, or allow projects with foreign capital is a necessity. The strategic challenges faced by the economy in countries that have experience in investment projects have faced several factors internal and external for a period of time and not a few and the pressures and difficulties and failures have affected in one way or another on the development work in that country. On this basis, the stakeholders have a role to pay attention to the issue of the feasibility of the pattern of foreign investment in the investment environment

... Show More
View Publication Preview PDF
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Improving Nursing process Performance based on service scheduling dimensions. ( Field research)

Abstract :

This present paper sheds the light on dimensions of scheduling the service that includes( the easiness of performing the service, willingness , health factors, psychological sides, family matters ,diminishing the time of waiting that improve  performance of nursing process including ( the willingness of performance, the ability to perform  the performance , opportunity of performance) . There is genuine problem in the Iraqi hospitals  lying into the weakness of nursing staffs , no central decision to define and organize schedules. Thus the researcher has chosen  this problem as to be his  title . The research come a to develop  the nursing service

... Show More
Crossref
View Publication Preview PDF