Determine Optimal Preventive Maintenance Time Using Scheduling Method
...Show More Authors

In this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.

The method of estimating the distribution parameters for each device was the OLS method.

The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and access to the optimum time for maintenance, which achieves the lowest costs. The second method depends on the reliability function, which was to determine the optimal maintenance period, which then cost less Can. We also proved through this research that the method of scheduling is better than the method of relying on the reliability function because it depends heavily on the cost of maintenance.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Sep 01 2007
Journal Name
Journal Of Economics And Administrative Sciences
Comparison Between Ordinary Method and Robust Method to estimate the Parameters of the Univariate Mixed Model with Low Order
...Show More Authors

A condense study was done to compare between the ordinary estimators. In particular the maximum likelihood estimator and the robust estimator, to estimate the parameters of the mixed model of order one, namely ARMA(1,1) model.

Simulation study was done for a varieties the model.  using: small, moderate and large sample sizes, were some new results were obtained. MAPE was used as a statistical criterion for comparison.

 

View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Artificial Neural Network Models to Predict the Cost and Time of Wastewater Projects
...Show More Authors

Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Sun Jun 01 2014
Journal Name
Baghdad Science Journal
Effect of sintering time on Bi1.6Pb0.4Sr1.8Ba0.2Ca2Cu3O10+? compound quenched in air and liquid nitrogen
...Show More Authors

High temperature superconductor with nominal composition Bi1.6Pb0.4Sr1.8Ba0.2Ca2 Cu3O10+? was prepared by solid state reaction method. Two sets of samples have been prepared .The first one was quenched in air; the second set was quenched in liquid nitrogen. X-ray diffraction analyses showed an orthorhombic structure with two phases, high –Tc phase (2223) and low-Tc phase (2212) in addition to that impure phase was found. It has been observed that quenched in air samples display a sharp superconducting transition and a higher-Tc phase than that of the quenched in liquid nitrogen samples.

View Publication Preview PDF
Crossref
Publication Date
Mon Sep 04 2023
Journal Name
2023 International Conference On Advanced Mechatronic Systems (icamechs)
Performance Analysis of Finite-Time Generalized Proportional Integral Observer for Uncertain Brunovsky Systems
...Show More Authors

This paper proposes a novel finite-time generalized proportional integral observer (FTGPIO) based a sliding mode control (SMC) scheme for the tracking control problem of high order uncertain systems subject to fast time-varying disturbances. For this purpose, the construction of the controller consists of two consecutive steps. First, the novel FTGPIO is designed to observe unmeasurable plant dynamics states and disturbance with its higher time derivatives in finite time rather than infinite time as in the standard GPIO. In the FTGPO estimator, the finite time convergence rate of estimations is well achieved, whereas the convergence rate of estimations by classical GPIO is asymptotic and slow. Secondly, on the basis of the finite and fast e

... Show More
View Publication
Scopus (8)
Crossref (4)
Scopus Crossref
Publication Date
Mon Jan 01 2024
Journal Name
2nd International Conference For Engineering Sciences And Information Technology (esit 2022): Esit2022 Conference Proceedings
Determination of time-dependent coefficient in inverse coefficient problem of fractional wave equation
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Tue Apr 01 2014
Journal Name
International Communications In Heat And Mass Transfer
Determination of a time-dependent thermal diffusivity and free boundary in heat conduction
...Show More Authors

View Publication
Scopus (18)
Crossref (11)
Scopus Clarivate Crossref
Publication Date
Wed Sep 01 2021
Journal Name
Iop Conference Series: Earth And Environmental Science
Time Dependent Behavior of Engineered Cementitious Composite Concrete Produced from Portland Limestone Cement
...Show More Authors

View Publication
Scopus (3)
Crossref (1)
Scopus Crossref
Publication Date
Sun Sep 05 2010
Journal Name
Baghdad Science Journal
Effect of Time Factor, Molybdenum and Potassium on Rhizobium Growth in the Soil
...Show More Authors

An experiment was carried out to study the effects of Time Factor, potassium and Molybdenum on Rhizobium growth. The objective of the experiment, which conducted under laboratory conditions, was to investigate the interaction effects of using three levels of Molybdenum (0, 0.25, 2.50 mg Mo . Kg-1 sterile soil) and four levels of potassium (0, 25, 50, 100 mg K . Kg-1 sterile soil) on the viable counts of Rhizobium growth in the sterile soil after 3, 9, 15 and 21 days of incubation at 28°C. The results indicated that Molybdenum level 2.50 mg Mo . Kg-1 sterile soil and potassium level 50 mg K . Kg-1 sterile soil recorded the biggest significant increase in the viable counts of Rhizobium growth in the sterile soil especially after 15 da

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu May 05 2022
Journal Name
Al-kindy College Medical Journal
Time-Trend Analysis of Bladder Cancer and its Association with Bilhariziasis in Egypt
...Show More Authors

Background: Both bladder cancer and schistosomiasis are endemic in Egypt. The former has a unique epidemiological pattern, which has been linked to bladder infestation by Schistosoma. The last decades have witnessed a great reduction in the infection rate of schistosomiasis and a decline in the incidence and changes in the patterns of bladder cancer. Whether these changes are linked to each other or a co-incidence is a subject of investigations.

Method: Literature on epidemiological data of bladder cancer and Schistosoma in Egypt was searched for in Medline, Scopus, PubMed, and Google Scholar. Furthermore, a hand search for literature and reports released by the Egyptian government and involved agencies was perfo

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
The Time-Cost Trade-off to Manage A Project in a Fuzzy Environment
...Show More Authors

In this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the

... Show More
View Publication Preview PDF
Crossref