Preferred Language
Articles
/
jeasiq-128
Determine Optimal Preventive Maintenance Time Using Scheduling Method
...Show More Authors

In this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.

The method of estimating the distribution parameters for each device was the OLS method.

The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and access to the optimum time for maintenance, which achieves the lowest costs. The second method depends on the reliability function, which was to determine the optimal maintenance period, which then cost less Can. We also proved through this research that the method of scheduling is better than the method of relying on the reliability function because it depends heavily on the cost of maintenance.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Jan 01 2014
Journal Name
مجلة العلوم التربوية والنفسية
The effect of the self-scheduling strategy on the chemistry achievement of first intermediate female students
...Show More Authors

Preview PDF
Publication Date
Mon Apr 30 2018
Journal Name
Journal Of Theoretical And Applied Information Technology
An efficient artificial fish swarm algorithm with harmony search for scheduling in flexible job-shop problem
...Show More Authors

Flexible job-shop scheduling problem (FJSP) is one of the instances in flexible manufacturing systems. It is considered as a very complex to control. Hence generating a control system for this problem domain is difficult. FJSP inherits the job-shop scheduling problem characteristics. It has an additional decision level to the sequencing one which allows the operations to be processed on any machine among a set of available machines at a facility. In this article, we present Artificial Fish Swarm Algorithm with Harmony Search for solving the flexible job shop scheduling problem. It is based on the new harmony improvised from results obtained by artificial fish swarm algorithm. This improvised solution is sent to comparison to an overall best

... Show More
View Publication Preview PDF
Scopus (3)
Scopus
Publication Date
Mon Jan 20 2020
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Genetic Algorithm and Particle Swarm Optimization Techniques for Solving Multi-Objectives on Single Machine Scheduling Problem
...Show More Authors

In this paper, two of the local search algorithms are used (genetic algorithm and particle swarm optimization), in scheduling number of products (n jobs) on a single machine to minimize a multi-objective function which is denoted as  (total completion time, total tardiness, total earliness and the total late work). A branch and bound (BAB) method is used for comparing the results for (n) jobs starting from (5-18). The results show that the two algorithms have found the optimal and near optimal solutions in an appropriate times.

View Publication Preview PDF
Crossref
Publication Date
Sun May 17 2020
Journal Name
Iraqi Journal Of Science
Numerical Solutions for the Optimal Control Governing by Variable Coefficients Nonlinear Hyperbolic Boundary Value Problem Using the Gradient Projection, Gradient and Frank Wolfe Methods
...Show More Authors

This paper is concerned with studying the numerical solution for the discrete classical optimal control problem (NSDCOCP) governed by a variable coefficients nonlinear hyperbolic boundary value problem (VCNLHBVP). The DSCOCP is solved by using the Galerkin finite element method (GFEM) for the space variable and implicit finite difference scheme (GFEM-IFDS) for the time variable to get the NS for the discrete weak form (DWF) and for the discrete adjoint weak form (DSAWF) While, the gradient projection method (GRPM), also called the gradient method (GRM), or the Frank Wolfe method (FRM) are used to minimize the discrete cost function (DCF) to find the DSCOC. Within these three methods, the Armijo step option (ARMSO) or the optimal step opt

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Thu Mar 01 2007
Journal Name
Journal Of Economics And Administrative Sciences
Wavelet Analysis For Sunspot Time Series
...Show More Authors

Abstract

In this research we study the wavelet characteristics for the important time series known as Sunspot, on the aim of verifying the periodogram that other researchers had reached by the spectral transform, and noticing the variation in the period length on one side and the shifting on another.

A continuous wavelet analysis is done for this series and the periodogram in it is marked primarily. for more accuracy, the series is partitioned to its the approximate and the details components to five levels, filtering these components by using fixed threshold on one time and independent threshold on another, finding the noise series which represents the difference between

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed May 17 2023
Journal Name
College Of Islamic Sciences
Time in (what and whatever) conditionals
...Show More Authors

This is a research in which I studied the opinions of Arab scholars, in their studies
For (what) and (whatever) the two conditionals and their indication of time, and its name
B (time in (what) and (whatever) the two conditions), and I mentioned their opinions in it
This issue was discussed and discussed, and in this study it relied on the sources of the Arabic language.
Especially the books of grammar, interpretation, and the opinions of the scholars of the principles of jurisprudence are mentioned,
I also mentioned the opinion of the scholars of jurisprudence, and how they likened (whatever) to (everything).
In its indication of repetition, and as long as it indicates repetition, it indicates
time Because repetitio

... Show More
View Publication Preview PDF
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Spectral Technique for Baud Time Estimation
...Show More Authors

A new approach for baud time (or baud rate) estimation of a random binary signal is presented. This approach utilizes the spectrum of the signal after nonlinear processing in a way that the estimation error can be reduced by simply increasing the number of the processed samples instead of increasing the sampling rate. The spectrum of the new signal is shown to give an accurate estimate about the baud time when there is no apriory information or any restricting preassumptions. The performance of the estimator for random binary square waves perturbed by white Gaussian noise and ISI is evaluated and compared with that of the conventional estimator of the zero crossing detector.

View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Clinical And Experimental Dentistry
Preventive effect of combined Er, Cr: YSGG and fluoride gel on acid resistance of the permanent tooth enamel: An in vitro study
...Show More Authors

View Publication
Crossref (1)
Crossref
Publication Date
Thu Dec 21 2023
Journal Name
Mathematical Modelling Of Engineering Problems
Recovering Time-Dependent Coefficients in a Two-Dimensional Parabolic Equation Using Nonlocal Overspecified Conditions via ADE Finite Difference Schemes
...Show More Authors

View Publication Preview PDF
Scopus Crossref
Publication Date
Sun Oct 27 2019
Journal Name
Iraqi Journal Of Science
Pre and Post-Stack Imaging of 2D Seismic Data Using Time Migration for Ajeel Oil field, Central of Iraq
...Show More Authors

Kirchhoff Time migration was applied in Pre and Post-Stack for 2D seismic survey for line AJ-99N, that is located in Ajeel oilfield in Salah Al-Din Governorate, Central Iraq. The process follows several accurate steps to reach the final time migration stage. The results of applied time migration give an accurate image for the Ajeel anticline reservoir and to improve the signal to noise ratio. Pre-Stack shows a clearer image for the structure in the study area, and the time-frequency analysis insure the result.

View Publication Preview PDF
Scopus (3)
Scopus Crossref