The control charts are one of the scientific technical statistics tools that will be used to control of production and always contained from three lines central line and upper, lower lines to control quality of production and represents set of numbers so finally the operating productivity under control or nor than depending on the actual observations. Some times to calculating the control charts are not accurate and not confirming, therefore the Fuzzy Control Charts are using instead of Process Control Charts so this method is more sensitive, accurate and economically for assisting decision maker to control the operation system as early time. In this project will be used set data from plant of production of bottles drinking water so designed the fuzzy control charts and also discovering the defectives units as more quickly and accurately. Especially with variable sample size that will product as not constant.
The research aims to improve the effectiveness of internal control system according to a model COSO, by identifying the availability of system components according to the model and then improve the effectiveness of each component by focusing on areas for improvement in each component, as it was addressed to a model COSO and then Maamth with the environment, the current Iraqi by introducing some improvements on the form of some mechanisms of corporate governance of the Council of Directors, and senior management, the Audit Committee, Committee appointments, especially that supplies application available in the laws and legislation, the current Iraqi, taking into consideration to make some
... Show MoreThe research aims to evaluate the suppliers at Diyala general electric industries company conducted in an environment of uncertainty and fuzzy where there is no particular system followed by the company, and also aims to use the problem of traveling salesman problem in the process of transporting raw materials from suppliers to the company in a fuzzy environment. Therefore, a system based on mathematical methods and quantity was developed to evaluate the suppliers. Fuzzy inference system (FIS) and fuzzy set theory were used to solve this problem through (Matlab) and the problem of the traveling salesman in two stages was also solved by the first stage of eliminating the fuzzing of the environment using the rank function method, w
... Show MoreAlthough the number of stomach tumor patients reduced obviously during last decades in western countries, but this illness is still one of the main causes of death in developing countries. The aim of this research is to detect the area of a tumor in a stomach images based on fuzzy clustering. The proposed methodology consists of three stages. The stomach images are divided into four quarters and then features elicited from each quarter in the first stage by utilizing seven moments invariant. Fuzzy C-Mean clustering (FCM) was employed in the second stage for each quarter to collect the features of each quarter into clusters. Manhattan distance was calculated in the third stage among all clusters' centers in all quarters to disclosure of t
... Show MoreIn this work laser detection and tracking system (LDTS) is designed and implemented using a fuzzy logic controller (FLC). A 5 mW He-Ne laser system and an array of nine PN photodiodes are used in the detection system. The FLC is simulated using MATLAB package and the result is stored in a lock up table to use it in the real time operation of the system. The results give a good system response in the target detection and tracking in the real time operation.
Recently, the development of the field of biomedical engineering has led to a renewed interest in detection of several events. In this paper a new approach used to detect specific parameter and relations between three biomedical signals that used in clinical diagnosis. These include the phonocardiography (PCG), electrocardiography (ECG) and photoplethysmography (PPG) or sometimes it called the carotid pulse related to the position of electrode.
Comparisons between three cases (two normal cases and one abnormal case) are used to indicate the delay that may occurred due to the deficiency of the cardiac muscle or valve in an abnormal case.
The results shown that S1 and S2, first and second sound of the
... Show MoreObjective: This study aimed to assessing new suggested technique of Physical Growth Curves (PGC) charts in
children under two years old of a non-probability sample.
Methodology: A non-probability sample of size (420) children under two years selected from 12 Primary
Health Care Centers in Diyala governorate during the period from 15th Nov. 2010 to 13th Mar. 2011
according to admix of a different properties together in one chart/or growth curve chart included in at least
weight, Height, and Head circumference.
Results: the results showed different properties that can be admix together in one chart/or growth curve
chart included in at least weight, Height, and Head circumference. And to overtake the problem of the norm
Objective(s): assessment of the health follow up and weight control for women with osteoporosis and find out the relationship between their health follow up and weight control and their socio-demographic characteristics.
Methodology: A descriptive study was conducted on women with osteoporosis for the period of September, 26th 2020 to Jun, 20th 2021. Non- probability (convenient) sample of (70) women with osteoporosis selected from (5) Private Clinics for Joints and Fractures in Baqubah City. A questionnaire was designed though extensive review of literatures and it consists of three parts: the first part includes women’s socio demographic characteristics, the second part inclu
... Show Moreابعاد الجودة في السيطرة على العدوى المكتسبة في المستشفيات الحكومية العراقية: دراسة تقويمية
The aim was to design a MATLAB program to calculate the phreatic surface of the multi-well system and present the graphical shape of the water table drawdown induced by water extraction. Dupuit’s assumption is the base for representing the dewatering curve. The program will offer the volume of water to be extracted, the total number of wells, and the spacing between them as well as the expected settlement of soil surrounding the dewatering foundation pit. The dewatering well arrangement is required in execution works, and it needs more attention due to the settlement produced from increasing effective stress.