The article aims to study the crisis of political change from three Phases . The first focuses on the crises of political legitimacy and democratic postponement, as fundamental issues in analyzing the phenomenon of power struggle through the dialectic between the concept of historical legitimacy and institutional fragility from the beginning of statehood in 1962 to the stage of multi-partyism and the cessation of the electoral process in the 1990s. While the second focuses on the question of the monopoly of power in the post-terrorism and national reconciliation according to considerations Political, social and security measures to prolong the life of the regime and avoid the demands of political change brought about by the revolutions of the Arab Spring through the mechanisms of buying social peace and the justification of the various austerity policies. The third stage focuses on the justification of rejection of political change in order to stay in power, considering that the dimensions of conflict and representation and the reasons for rejecting change before the end of Bouteflika's rule were not confined to the problems of ambition and political struggle for the succession of the president, but went beyond other factors to ensure the protection of interests by supporting the extension of his term to a fifth term.
The current study was designed to investigate the histological structure of the cerebellum in the Iraqi frog
Our scientists Arabs old efforts in achieving texts that led to the foundations of general
rules they have set for this work in accordance with the systematic context is based on the
study, analysis and precision in dealing with this work, which became the basis for each
investigator to the present day, which was to them careful consideration manuscripts and
work to be closer to the image by its author, so produced their efforts in this area several
books provided the technical wizards of this science, which did not leave a gap in which only
gave her treatments and suggestions each and every one of the point made by and gave her
what produced the expertise in this direction in accordance with the formulations
meth
Distribution of light intensity in the flat photobioreactor for microalgae cultivation as a step design for production of bio-renewable energy was addressed in the current study. Five sizes of bioreactors with specific distances from the main light source were adopted as independent variables in experiential design model. The results showed that the bioreactor’s location according to the light source, determines the nature of light intensity distribution in the reactor body. However, the cross-section area plays an important role in determining the suitable location of reactor to achieve required light homogeneity. This area could change even the expected response of the light passing through the reactor if Beer-Lambert's law is adopted.
... Show MoreProjects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo
Leaching scheduling techniques are one of the suggested solutions for water scarcity problems .The aim of the study is to show the possibility of using leaching scheduling, when applying the irrigation scheduling program for a certain irrigation project, which was prepare by Water Resources Engineering –University of Baghdad with some modifications to generalized it and it make applicable to various climatic zone and different soil types.
The objectives of this research is to build a system that concerns the prediction of the leaching scheduling (depth and date of leaching water), illustrating the main problems (soil salinity, save the amount of leaching requirement, and to maintain crops growth).The other objective is to compare be