Cryptographic applications demand much more of a pseudo-random-sequence
generator than do most other applications. Cryptographic randomness does not mean just
statistical randomness, although that is part of it. For a sequence to be cryptographically
secure pseudo-random, it must be unpredictable.
The random sequences should satisfy the basic randomness postulates; one of them is
the run postulate (sequences of the same bit). These sequences should have about the same
number of ones and zeros, about half the runs should be of length one, one quarter of length
two, one eighth of length three, and so on.The distribution of run lengths for zeros and ones
should be the same. These properties can be measured deterministicallyand then compared to
statistical expectations using a chi-square test.
In this paper the Run Criterion, is calculated, it can be calculated for any key generator
before it be implemented or constructed (software or hardware).The cryptosystems: Linear,
Product and Brüer are chosen as study cases.
يعد التحليل العاملي Factor Analysis أحد الأساليب الإحصائية المهمة والتي يصعب تنفيذها يدويا ً أو بالألات الحاسبة الصغيرة لذا لاقى الباحثين صعوبة في إستخدامه في البداية بل كان من المستحيل القيام به ، لذا فالمؤلف قد تناول التحيلي العاملي الاستكشافي لكونه إسلوب إحصائي يستخدم في تحليل البيانات ويتطلب شروطا ً لأستخدامه ودقة في مراعاة هذه الشروط ويتطلب أيضا ً معايير يجب أن يتأكد الباحث من توافرها في البيانات وهذا ما تم ت
... Show Moreواقع تدريس السياسة الخارجية في كلية العلوم السياسية - جامعة بغداد
ان بناء اية حضارة يمثل جهداً انسانياً يشترك فيه كل الافراد والمؤسسات ويستلزم حشد القدرات لاسيما النخبة التي توجه الجهود وتعمل على الاستخدام الامثل للموارد في اطار حركة منظمة للمجتمع تنتج وسائلها وتحقق اهدافها ، وان حركة التاريخ والواقع تظهر ان التدريسي الجامعي هو صفوة النخبة والجامعة هي بؤرة المعرفة المؤسسية . ( عبود 2008 : 12 ) &
... Show MoreThe phenomenon of multi-class construction and landlords has increased in Iraq, and this is not justified except because of the change in the economic and social conditions in it, because like any social system interacts with what happens in society, whether it is positive or negative, and since the vertical housing system contains common parts and these parts need to Maintenance and preservation, and in order to continue to perform the construction and other parts in an effective and regular manner for a long period of time and with appropriate efficiency, it must be maintained, and maintenance is one of the most important and difficult problems facing the partners. It is recognized that it is not possible to understand these practical dif
... Show Moreهدف البحث معرفة نسبة تضمين معايير التنور التقني في محتوى كتابي الحاسوب للمرحلة الإعدادية في العراق عن طريق الإجابة عن السؤال الآتي: ما نسبة توافر معايير التنور التقني في محتوى كتابي الحاسوب المقرران على طلبة المرحلة الاعدادية بفرعيها ( العلمي والادبي ) المعتمدان من وزارة التربية العراقية/ المديرية العامة للمناهج في العام الدراسي (2016-2017 )؟ وتم اعتماد المنهج الوصفي التحليلي، وتكون مجتمع البحث وعينته من محتو
... Show Moreالتطابق بين أجزاء الجملة في مسرحية الوصيفات لأنطونيو بويرو باييخو.
مشكلة البحث
لقد تفاقمت مشكلة تلوث البيئة في السنوات الأخيرة من العقد الأخير والعقد الأول من القرنين العشرين والحادي والعشرين على التوالي بشكل يلفت النظر. إذ انتشر الاستعمال غير العقلاني للموارد الطبيعية من مياه ملوثة وسكن غير صحي وغير ملائم وسؤ التغذية وظروف الصحة العامة الرديئة وانتشار العوادم التي تحدثها المركبات والمولدات التي انتشرت في أحياء المدن العراقية لتزوي
... Show Moreقياس جودة نظام الحكم أنموذج فعالة الأداء الحكومي في العراق
The main target of this paper is to determine the optimum time for preventive maintenance on machines. Tow methods has been implemented estimating the optimum time duration for preventive maintenance . the first techniques use scheduling depending on data concerning the machine maintenance cost and halted cost from the production reach to the optimum time for maintenance which reflect the minimum cost. Where as the second techniques depends on reability function to estimate the optimum duration time which reflect the minimum cost. The tow techniques above by which we count on in fixing the preventive maintenance both give same result . we also prove that the scheduling method best than the reability function .