Training and retraining of teachers have become a central issue in Iraq recently especially in-service training of English teachers on the new curricula (Iraq opportunities). English teachers should be objectively evaluated and assessed.
A sample of (40) trained teachers of English is included in the study and a questionnaire is used as the main instrument of the study.
The main findings of the study were the following:
1. The trainees were serious in training on the new course (item 6) the programme helped increase their information (item 4) and motivate them towards better teaching (item 3). The aims of the programme were clear (item1). The programme helped develop their teaching skills (item 2) and was comprehensive (item 5).
2. Most of the trainees benefit from the subject of testing (item12). The programme helped most of them train on teaching methods (item7).
3. Teachers' trainers were vocational and led training sessions perfectly (items 14 and 13). They fairly used lecture formats and discussion in delivering lectures (item 15 and 16).there administration and using other combined methods were not successful (items 18 and 17).
4. Items in the table of training methods showed great shortage. (table3)
5. In the field of using training aids, whiteboard was over used (item29).
6. In table (5) duration of the course was suitable to most of the trainees (item33) but its period interfered with school timetable of the trainees (item 35). Other items showed different degrees of defect in this field.
7. In the field of evaluation. Class oral discussion was used (item 24) and a post-test at the end of the course (item 39). Other procedures of evaluation were neglected.
8. In the field of trainees needs. trainees got advantage in teaching English in the classroom (item 48) and lesson planning of different period (item 47). They were trained how to be adequate with the objective of teaching English in Iraq (item 47). They were also trained on teaching different skills (item46) and established relationship between the objectives and content of the textbooks (item 43). (Items 50, 49, 51 and 44) did not meet trainees needs' in group (A).
9. In group (B) trainees preferred printing the lectures (item 54) and discussing them in the classroom (item 53). In group (C) trainees showed that using the whiteboard was efficient (item 55). Teaching aids were not appropriate (item 56).
A conclusion and some recommendations were mentioned at the end of the research based on the findings of the study in order to improve the quality of in-service training programmes in Iraq.
Lean Six Sigma methodologies and Ergonomics principles are the main pillars of this work given their importance in the implementation of continuous improvement in assembly workstations design. When looking at the introduction of the Ergonomics that has been affected by the integration of the Lean and Six Sigma for improvements, it is necessary to understand why these methodologies belong to each other and how they can be handled in the industrial field. The aim of the work seeks towards the impact of analyzing the integration of the basics tools of Lean and Six Sigma that enhanced Ergonomics highlighted the importance of using the priority matrix in the selection of the priority criteria. Two models of a system based on
... Show Moreسنقوم في هذا البحث باشتقاق توزيع الطلب خلال فترة الانتظار لنظام سيطرة على الخزين يخضع فيه الطلب لتوزيع گاما فيما يخضع وقت الانتظار للتوزيع اللوغايتمي الطبيعي، كما سيتم استخراج العزوم الأساسية لهذا المتغير ، الضرورية بدورها لاستخراج بعض مؤشرات النظام المذكور.
المصطلحات المستخدمة: التكامل المحيط، المستوي المركب، تكامل هانكيل، مستوى إعادة الطلب، الوقاية.
In this study, we investigate about the run length properties of cumulative sum (Cusum) and The exponentially weighted moving average (EWMA) control charts, to detect positive shifts in the mean of the process for the poisson distribution with unknown mean. We used markov chain approach to compute the average and the standard deviation for run length for Cusum and EWMA control charts, when the variable under control follows poisson distribution. Also, we used the Cusum and the EWMA control charts for monitoring a process mean when the observations (products are selected from Al_Mamun Factory ) are identically and independently distributed (iid) from poisson distribution i
... Show MoreRisk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has
... Show MorePhytoplankton assemblage in relation to physical and chemical characteristics of water in Al-Auda marsh of Maysan province southern Iraq was assessed from November 2012 to July 2013. Six sampling sites were chosen to examine all phytoplankton species in the study area. A total of 246 species and seventy-five genera have been recognized belonging to twelve phytoplankton classes as follows: Bacillariophyceae (106 taxa), Chlorophyceae (34 taxa), Euglenophyceae (29 taxa), Cyanophyceae (29 taxa), Conjugatophyceae (19 taxa), Mediophyceae (10 taxa), Cryptophyceas (5 taxa), Coscinodiscophyceae (4 taxa), Chrysophyceae (4 taxa), Dinophyceae (3 taxa), Trebouxiophyceae (2 taxa) whereas Compsopogonophyceae record
A total of 72 individuals of genus Pristina were sorted from aquatic plant, Ceratophyllum demersum L., and filamentous algae collected from three sites on Tigris River at Baghdad including: Al-Sarafiya area (S1), Al- Jadiriyah area (S2), and Al- Za´afaraniya area (S3). Four species were identified including P. longiseta, P. aequiseta, P. proboscidea and P. foreli, with percentags of 51.7 , 36.4, 1.1, and 10.5 % respectively. The first two species found in all sites , while , P. proboscidea found only in S1 and P. foreli only in S2.
Buzurgan oil Field which is located in south of Iraq has been producing oil for five decades that caused production to drop in many oil wells. This paper provides a technical and economical comparison between the ESP and gas lift in one oil well (Bu-16) to help enhancing production and maximize revenue. Prosper software was used to build, match and design the artificial lift method for the selected well, also to predict the well behavior at different water cut values and its effect on artificial lift method efficiency. The validity of software model was confirmed by matching, where the error difference value between actual and calculated data was (-1.77%).
The ESP results showed the durability of ESP regarding th
... Show MoreCox regression model have been used to estimate proportion hazard model for patients with hepatitis disease recorded in Gastrointestinal and Hepatic diseases Hospital in Iraq for (2002 -2005). Data consists of (age, gender, survival time terminal stat). A Kaplan-Meier method has been applied to estimate survival function and hazerd function.
Risk factors can be considered unique in construction projects, especially in tendering phase. This research is directed to recognize and evaluate the importance of critical risk factors in the tendering phase related to Iraq’s construction project. As a rule, construction projects are impacted by risk factors throughout the project life cycle; without identifying and allocating these risk factors, the project cannot succeed. In this paper, the open and closed questionnaires are used to categorize the critical risk factors in tendering phase. Research aims to recognize the factors that influence the success of tendering phase, to determine the correct response to the risk’s factors in this research article, (IBM, SPSS, V23) package has
... Show More