Background: The displacement of artificial teeth during complete denture construction presents major processing errors in the occlusal vertical dimension which were verified at the previous trial denture stage. The aim of this study was to assess the effect of delay in processing after final flask closure and tension application on the vertical acrylic and porcelain teeth displacement of complete dentures constructed from heat cured acrylic and the results were compared with the conventional processing method. Materials and methods: forty samples of identical maxillary complete dentures were constructed from heat polymerized acrylic resin. These samples were subdivided into the following experimental subgroups in which each subgroup contains 5 samples for both acrylic and porcelain teeth and as follows: 1. Conventional flasking technique and immediate processing. 2. Conventional flasking technique and 6 hours delay in processing. 3. flasking technique with tension system and immediate processing. 4. flasking technique with tension system and 6 hours delay in processing. Reference metal pins were attached to the middle of the buccal surface of the upper right canine and center of the buccal groove of the left first molar. And according to these reference points on the teeth another metallic Reference pins were fixed on the denture vestibules and at a distance of 7.5mm by straight lines and 6.5mm where placed between the metal pins and the vestibules in order to standardize the measurement. The distance between the right and left metal pins on the canine and molars and the corresponding metal pins on the buccal vestibules were measured during the wax up stage and after processing by using an optical travelling microscope with an accuracy of 0.0005 mm. Means in (mm) were analyzed statistically by analysis of variance and the comparative T-test and least significance test (LSD). Results: Significant reduction in vertical displacement of the teeth occurred in groups when 6 hours delay in processing were applied, but a significant improvement was also observed in groups with tension system application when compared with control group. On the other hand, there were a high significant reduction in the vertical displacement in groups with tension system and 6 hours delay in processing combination. While for the type of artificial teeth data showed significant difference in the amount of vertical displacement of the teeth in groups with acrylic teeth when compared with porcelain teeth. Conclusions: The findings of this study showed that 6 hours delay in processing and tension system application were effective in reducing the vertical displacement of the artificial teeth during flasking. The maximum reduction in the displacement was observed in dentures constructed from acrylic teeth. On the other hand, significant decrease in vertical displacement of the teeth was detected in dentures constructed from porcelain teeth.
Projects suspensions are between the most insistent tasks confronted by the construction field accredited to the sector’s difficulty and its essential delay risk foundations’ interdependence. Machine learning provides a perfect group of techniques, which can attack those complex systems. The study aimed to recognize and progress a wellorganized predictive data tool to examine and learn from delay sources depend on preceding data of construction projects by using decision trees and naïve Bayesian classification algorithms. An intensive review of available data has been conducted to explore the real reasons and causes of construction project delays. The results show that the postpo
Background: To investigate the effect of different types of storage media on enamel surface microstructure of avulsed teeth by using atomic force microscope.Materials and methods : Twelve teeth blocks from freshly extracted premolars for orthodontic treatment were selected . The study samples were divided into three groups according to type of storage media :A-egg white , B- probiotic yogurt , and C-bovine milk . All the samples were examined for changes in surface roughness and surface granularity distribution using atomic force microscope, at two periods: baseline, and after 8 hours of immersing in the three types of storage media. Results: Milk group had showed a significant increase in the mean of the roughness values at
... Show MoreFluorescent proteins (FPs) have revolutionised the life sciences, but the chromophore maturation mechanism is still not fully understood. Here we photochemically trap maturation at a crucial stage and structurally characterise the intermediate.
the energy that a radiation source emits as light (photons), electromagnetic waves, or particles is known as radiation. X-ray is one type of ionizing radiation that falls within the electromagnetic wave category of short wavelengths. Because of their short wavelength. X-ray is a type of ionizing radiation that is used in a constantly growing number of diagnostic procedures. X-ray diagnostic imaging has been employed in the medical field for more than a century(Hariyoto et al., 2020). Radiation has advantages for human health, but there is also a risk. the impacts of Radiation on Fertility it is an oligospermia, or a reduction in the number of sperm cells, which is already possible after radiation exposure of 0.15 mGy. It Leads to impede
... Show MoreComputations of the relative permeability curves were made through their representation by two functions for wetting and nonwetting phases. Each function contains one parameter that controls the shape of the relative permeability curves. The values of these parameters are chosen to minimize an objective function, that is represented as a weighted sum of the squared differences between experimentally measured data and the corresponding data calculated by a mathematical model simulating the experiment. These data comprise the pressure drop across core samples and the recovery response of the displacing phase. Two mathematical models are constructed in this study to simulate incompressible, one-dimensional, two-phase flow. The first model d
... Show MoreThe information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract
... Show More