Background: The displacement of artificial teeth during complete denture construction presents major processing errors in the occlusal vertical dimension which were verified at the previous trial denture stage. The aim of this study was to assess the effect of delay in processing after final flask closure and tension application on the vertical acrylic and porcelain teeth displacement of complete dentures constructed from heat cured acrylic and the results were compared with the conventional processing method. Materials and methods: forty samples of identical maxillary complete dentures were constructed from heat polymerized acrylic resin. These samples were subdivided into the following experimental subgroups in which each subgroup contains 5 samples for both acrylic and porcelain teeth and as follows: 1. Conventional flasking technique and immediate processing. 2. Conventional flasking technique and 6 hours delay in processing. 3. flasking technique with tension system and immediate processing. 4. flasking technique with tension system and 6 hours delay in processing. Reference metal pins were attached to the middle of the buccal surface of the upper right canine and center of the buccal groove of the left first molar. And according to these reference points on the teeth another metallic Reference pins were fixed on the denture vestibules and at a distance of 7.5mm by straight lines and 6.5mm where placed between the metal pins and the vestibules in order to standardize the measurement. The distance between the right and left metal pins on the canine and molars and the corresponding metal pins on the buccal vestibules were measured during the wax up stage and after processing by using an optical travelling microscope with an accuracy of 0.0005 mm. Means in (mm) were analyzed statistically by analysis of variance and the comparative T-test and least significance test (LSD). Results: Significant reduction in vertical displacement of the teeth occurred in groups when 6 hours delay in processing were applied, but a significant improvement was also observed in groups with tension system application when compared with control group. On the other hand, there were a high significant reduction in the vertical displacement in groups with tension system and 6 hours delay in processing combination. While for the type of artificial teeth data showed significant difference in the amount of vertical displacement of the teeth in groups with acrylic teeth when compared with porcelain teeth. Conclusions: The findings of this study showed that 6 hours delay in processing and tension system application were effective in reducing the vertical displacement of the artificial teeth during flasking. The maximum reduction in the displacement was observed in dentures constructed from acrylic teeth. On the other hand, significant decrease in vertical displacement of the teeth was detected in dentures constructed from porcelain teeth.
Introduction/Aim. Seminal fluid analysis (SFA) plays a crucial role in helping infertility clinics diagnose the underlying reason of male infertility. The aim of the study was to investigate seminal fluid patterns of male partners of an infertile couple with apparently fertile female partners. Materials and methods. A cross-sectional study was conducted between January 2019 and December 2022. Patients were attending consultations for delayed conception for more than 12 months with apparently fertile female partner. Results. Four hundred fifty-three patients were included in the study. The distribution of patients according to age groups showed that 277 patients were young, aged 21 - 30 years (61%). Two hundred sixty-two (58%) patien
... Show MoreThe present study investigates the effect of the de-sanding (recycling system) on the bearing capacity of the bored piles. Full-scale models were conducted on two groups of piles, the first group was implemented without using this system, and the second group was implemented using the recycling system. All piles were tested by static load test, considering the time factor for which the piles were implemented. The test results indicated a significant and clear difference in the bearing capacity of the piles when using this system. The use of the recycling system led to a significant increase in the bearing capacity of the piles by 50% or more. Thus it was possible to reduce the pile length by (15 % or more) thus, and implementation c
... Show MoreThe present study investigates the effect of the de-sanding (recycling system) on the bearing capacity of the bored piles. Full-scale models were conducted on two groups of piles, the first group was implemented without using this system, and the second group was implemented using the recycling system. All piles were tested by static load test, considering the time factor for which the piles were implemented. The test results indicated a significant and clear difference in the bearing capacity of the piles when using this system. The use of the recycling system led to a significant increase in the bearing capacity of the piles by 50% or more. Thus it was possible to reduce the pile length by (15 % or more) thus, and implementation costs
... Show MorePurpose: The research aims to explore the impact Business Intelligence System (BIS) and Knowledge Conversion Processes (KCP) in the Building Learning Organization (LO) in KOREK Telecom Company in Baghdad city.
Design/methodology/approach: in order to achieve the objectives of the research has been the development of a questionnaire prepared for this purpose and then has tested the search in the telecommunications sector, representatives of one of the telecommunications companies in Baghdad city, has therefore chosen KOREK Telecom company as a sample for research, and the choice was based on the best standard international companies to serve mobile communications in terms o
... Show MoreKurdistan power system is expanded along years ago. The electrical power is transmitted through long transmission lines. The main problem of transmission lines is active and reactive power losses. It is important to solve this issue, unless, the most of electrical energy will lost over transmission system. In this study, High Voltage Direct Current links/bipolar connection were connected in a power system to reduce the power losses. The 132kV, 50 Hz, 36 buses Kurdistan power system is used as a study case. The load flow analysis was implemented by using ETAP.16 program in which Newton-Raphson method for three cases. The results show that the losses are reduced after inserted HVDC links.